|
<br />12. NAME
<br />Sung-Ryong Han
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />
<br />Com fete one Section E for each ke
<br />13. ROLE IN THIS CONTRACT
<br />Traffic Planning and Modeling
<br />
<br />
<br />14. YEARS EXPERIENCE
<br />A. TOTAL B. WITH CURRENT FIRM
<br />
<br />16
<br />
<br />4
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />M.S.C.E., University of Florida, 1998
<br />M.S.C.M., Southern Polytechnic University, 1996
<br />B.S.C.E., Keimyung University (Korea), 1994
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards. etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida Statewide Model Development, Statewide, Florida, FOOT PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Central Office 2004 on going
<br />a. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE Ii'] Check if project performed with current firm
<br /> Project Manager responsible for technical/political advices for the Statewide Transportation Forecasting Model
<br /> development and coordinating model development for the Florida Statewide Mobility Plan Study.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Statewide Travel Model Conversions, Statewide, Florida, FOOT PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Central Office 2004-2006
<br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Project Manager responsible for converting traffic models to Citilab Cube Voyager Software. Included: FOOT District 1, FOOT
<br /> District 3, Treasure Coast Regional Planning Council (FOOT District 4), Central Florida Regional Planning Model (FOOT District
<br /> 5), Orlando Metro Model, Miami-Dade County Model(Miami, FOOT District 6), and Northeast Regional Planning Model
<br /> (Jacksonville, FOOT District 2).
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Northern Homestead Extension of the Florida Turnpike (HEFT) PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> widening, Miami-Dade County, Florida, FOOT Turnpike Enterprise
<br />c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Project Manager responsible for overseeing sub-area modeling for a 20 mile section on the Northern Homestead Extension
<br /> from SR-836 to the Florida Turnpike, interchange alternative analysis including 1-75, US-27, and new interchange
<br /> construction, project demand validation, and Project Development and Environmental project traffic development.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida Turnpike Widening, Miami-Dade County, Florida, FOOT PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Turnpike Enterprise
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Project Manager responsible for overseeing sub-area modeling, project demand model validation, and project concept
<br /> traffic developments. Preliminary Interchange Modification Reports and Interchange Justification Reports processes and
<br /> project feasibility analyses for the interchanges at Clint Moore Road, Yamato Road, and Palmetto Park Road.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> 1-75 Express lane Feasibility Project, lee and Collier Counties, Florida, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> FOOT Turnpike Enterprise 2006
<br />e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Travel Demand Project Manager responsible for subarea/corridor travel demand modeling, concept traffic estimation and
<br /> project feasibility assessment of 1-75 Express Lane project based on demand impact analysis, alternative evaluation, toll cost
<br /> analysis, and financial feasibility. Responsible for coordination and management of study with Florida Department of
<br /> Transportation, District 1.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 15
<br />
|