Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key oerson.) <br /> <br />38 <br /> <br />14. YEARS EXPERIENCE <br />T b. WITH CURRE~T FIRM <br /> <br />12. NAME <br />Angel E. Lorenzo, P.E., <br />LEED AP <br /> <br />13. ROLE IN THIS CONTRACT <br />Principal/Division Director <br /> <br />a. TOTAL <br /> <br />15. FIRM NAME AND LOCATION (Ci/yand Slale) <br />TLC Engineering for Architecture, Inc. - 5757 Blue Lagoon Drive, Suite 400, Miami, Florida 33126 <br /> <br />16 EDUCATION (DEGREE AND SPECIALlZA nON) <br />B.S. in Electrical Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />Florida, Electrical P.E. #31137 <br />California, Electrical P.E. #E15271 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizaftons. Training. Awards. elc) <br />LEED Accredited Professional <br /> <br />19 RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Pelican Community Center Recreation Building PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Sunny Isles, Florida 2008 2008 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ere) AND SPECIFIC ROLE t8I Check If project perlormed with current firm <br /> New two-story, 13,000 square foot community center building and a basketball/gymnasium building of <br /> approximately 9,900 square feet. The community center building includes some offices, several multi-purpose <br /> spaces, a warming kitchen and a pantry for the use of caterers. The Gymnasium includes a full-size basketball <br /> court and a snack bar area. Role: Principal-in-charge <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Coral Springs Public Safety Training and PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Technology Center, Coral Springs, Florida 2008 2008 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cosl. elc) AND SPECIFIC ROLE t8I Check if project perlormed with current firm <br /> New construction of 27,000 sf of c1assroom/admin space, 4,900 sf of apparatus bay, various training areas on <br /> the site including a 6 story fire tower, burn areas and truck driving practice areas/ $4.4 million/. <br /> Role: Principal-in-charge <br /> (1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED <br /> City of Miami Beach Regional Library PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami Beach, Florida 2004 2004 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size. cost. elc) AND SPECIFIC ROLE t8I Check if project perlormed with current firm <br /> New $15,000,000 Regional Library adjacent to the Bass Museum. The project is a 2-story, 42,000 square foot <br /> facility that includes an auditorium and a computer training room/$15 million. <br /> Role: Senior Electrical Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami Police Headquarters Renovations PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami, Florida 2005 2005 <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE t8I Check if project perlormed with current firm <br /> Renovation of some of the existing restrooms from the first through the fifth floor. Renovations included new <br /> plumbing fixtures including hot water, new exhaust system only, modification to existing air conditioning system <br /> and new lighting fixtures with upgrading lighting levels. <br /> Role: Principal-in-charge <br /> (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED <br /> Columbus Networks Office Renovation PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> North Miami, Florida ongoing 2010 (approx.) <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc) AND SPECIFIC ROLE t8I Check if project perlormed with current firm <br /> Renovations of an existing building and the construction of a new 9,000 sq. ft. storage/office building for this <br /> Fiber Optic Communications Hub. The project is divided into Phase1 for the renovations of the entire first floor <br /> and some minor renovations of the second floor in the existing building and Phase 2 for the construction of the <br /> new facility. Role: Principal-in-charge <br />