Laserfiche WebLink
<br />12. NAME <br />Ralph Baeza, PE, MBA, MA., <br />LEED AP <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each kev person.) <br />13 F10LE IN THIS CONTRACT <br />Principal/Senior Electrical Engineer <br /> <br />27 <br /> <br />14. YEARS EXPEF1IENCE <br /> <br />I b WITH CURRENT FIRM <br /><3 <br /> <br />a. TOTAL <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />TLC Engineering for Architecture, Inc. - 5757 Blue Lagoon Drive, Suite 400, Miami, Florida 33126 <br /> <br />16 EDUCATION (DEGREE AND SPECtALlZA nON) <br />B.S. in Electrical Engineering <br />MBA <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DtSCtPLlNE! <br />Florida, Electrical P.E. #42641 <br /> <br />18 OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc.) <br />National Society of Professional Engineers (NSPE) <br />Institute of Electrical and Electronics Engineers (IEEE) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade Fire Rescue Department at Port of Miami PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami, Florida ongoing 2010 (approx.) <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE I8l Check if project pertormed with current firm <br />a. Renovation of the 5,000 sq. ft. Marine Unit Facility at Terminal H Building on 903 South America Way, Miami <br /> Florida. The project included the renovation of the existing restrooms for handicap access and added showers, <br /> new kitchen and laundry facilities, new HV AC system and retrofitted electrical service to accommodate the <br /> electrical loads with 100% standby diesel generator system back up. <br /> Role: Project Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami Beach Continuing Services PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami Beach, Florida 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE I8l Check if project pertormed with current firm <br />b. 777 Building - Replacement of the existing HV AC system within the 777 building located in 1701 Meridian <br /> Avenue in Miami Beach, Florida. The building is 5 floors with the top floor only occupying half the floor. The <br /> new design is a water cooled chilled water system with new variable air volume air handlers with electronic <br /> DOC controls. The new air handlers are located within the same mechanical rooms increasing the size as <br /> need to provide clearances for the units. Role: Senior Electrical Engineer for the CA phase <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Gazit Office Renovation PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> North Miami Beach, Florida 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE I8l Check if project pertormed with current firm <br />C. Interior build out of 8,200 sq ft of executive office space. It includes two conference rooms, restroom with <br /> shower, individual offices, a break room, and other common areas. All the appliances are Energy Star, all <br /> individual offices have daylighting sensors, open spaces or restrooms have occupancy sensors, and all paints <br /> and sealants used were low VOC. There is a fire alarm system throughout and an IT room for all low voltage <br /> systems. The project achieved USGBC LEED Certification for Commercial Interiors. <br /> Role: Senior Electrical Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Port of Miami Terminal Band C Renovations PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami, Florida 2010 2010 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE I8l Check if project pertormed with current firm <br /> Mechanical, electrical, plumbing and structural engineering design of approximately 5,294 square feet One <br /> Stop Shop for the Customs and Border Protection within Cruise Terminal Building C and Terminal Building B <br /> located in the Port of Miami (paM). TLC was the prime consultant for the project. <br /> Role: Senior Electrical Enqineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida Department of Administrative Hearings Office PROFESSIONAL SERVICES T CONSTRUCTION (if applicable) <br /> Renovation - Miami, Florida 2008 2008 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE I8l Check if project pertormed with current firm <br /> The project consisted of interior office improvements of approximately 14,400 sq. ft. for the Florida Division of <br /> Administrative Hearings on the North Tower of the Rohde Complex in Miami. The project included the <br /> demolition and removal of all interior walls and the HV AC system. The electrical engineering included design for <br /> empty raceways for security, data and telecommunications systems. Role: Senior Electrical Engineer <br />