My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TLC Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
TLC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:55:22 AM
Creation date
11/18/2010 9:55:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12. NAME <br />Jorge E. Reyes, P.E., <br />LEED AP <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />~Com lete one Section E for each ke erson.) <br />13. ROLE IN THIS CONTRACT <br />Principal/Senior Mechanical Engineer <br /> <br />14. YEARS EXPERIENCE <br /> <br />17 <br /> <br />b. WITH CURRENT FIRM <br />13 <br /> <br />a. TOTAL <br /> <br />15. FIRM NAME AND LOCATION ICity and State) <br />TLC Engineering for Architecture, Inc. - 5757 Blue Lagoon Drive, Suite 400, Miami, Florida 33126 <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science in Mechanical Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida, Mechanical P.E. #54904 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc.) <br />Member of American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Coral Springs Public Safety Training and PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Technology Center - Coral Springs, Florida 2008 2008 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE 181 Check it project performed with current firm <br /> New construction of 27,000 sf of classroom/administrative space, 4,900 sf of apparatus bay, various training <br /> areas on the site including a 6 story fire tower, burn areas and truck driving practice areas/ $4.4 million. <br /> Role: Project Manager <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami Beach Continuing Services PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami Beach, Florida 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE 181 Check it project performed with current firm <br />b. 777 Building - Replacement of the existing HV AC system within the 777 building located in 1701 Meridian <br /> Avenue in Miami Beach, Florida. The building is 5 floors with the top floor only occupying half the floor. The <br /> new design is water cooled chilled water system with new variable air volume air handlers with electronic DOC <br /> controls. The new air handlers is located within the same mechanical rooms increasing the size as need to <br /> provide clearances for the units. Role: Senior Mechanical Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Florida Department of Administrative Hearings Office PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Renovation - Miami, Florida 2008 2008 <br />c. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm <br /> The project consisted of interior office improvements of approximately 14,400 sf for the Florida ~ivision of <br /> Administrative Hearings on the North tower of the Rohde Complex in Miami. The project included the <br /> demolition and removal of all interior walls and the HV AC system. The electrical engineering included design <br /> for empty raceways for security, data and telecommunications systems. Role: Senior Mechanical Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Gazit Office Renovation PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> North Miami Beach, Florida 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE 181 Check it project performed with current firm <br />d. Renovation of existing offices, approximately 8,220 sq ft, located in City of North Miami, Florida. The <br /> conference rooms have C02 sensors and IAQ dampers to control the outside air. There are 7 split systems <br /> with pretreated outside air. The shower head is low flow and the faucets are low flow and solar powered. The <br /> project achieved basic certification with the U.S. Green Building Council LEED@ for Commercial Interiors. <br /> Role: Senior Mechanical Engineer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami Police Headquarters Renovations PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami, Florida 2005 2005 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE 181 Check if project performed with current tirm <br /> Renovation of some of the existing rest rooms from the first through the fifth floor. Renovations included new <br /> plumbing fixtures including hot water, new exhaust system only, modification to existing air conditioning system <br /> and new lighting fixtures with upgrading lighting levels. Role: Project Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.