|
<br />12. NAME
<br />Orlin R. Velinov, PE, LEED AP,
<br />CxA
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Comolete one Section E for each kev person.)
<br />13 ROLE IN THIS CONTRACT
<br />Associate/Mechanical Engineer
<br />
<br />14. YEARS EXPERIENCE
<br />
<br />a. TOTAL
<br />
<br />13
<br />
<br />I b. WITH CURRE~T FIRM
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />TLC Engineering for Architecture, Inc. - 5757 Blue Lagoon Drive, Suite 400, Miami, Florida 33126
<br />
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />M.S. in Mechanical Engineering
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />Florida, PE# 64475
<br />California, PE #M32544
<br />
<br />18. OTHER PROFESSIONAL OUALlFICATIONS (Publications, Organizations, Tralnmg, Awards. etc.)
<br />LEED Accredited Professional
<br />Certified Commissioning Authority (CxA)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Pelican Community Center Recreation Building PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> Sunny Isles, Florida 2008 2008
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE I8l Check if project performed with current film
<br /> New two-story, 13,000 square foot community center building and a basketball/gymnasium building of
<br /> approximately 9,900 square feet. The community center building includes some offices, several multi-purpose
<br /> spaces, a warming kitchen and a pantry for the use of caterers. The Gymnasium includes a full-size basketball
<br /> court and a snack bar area. Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> PGA National Resort Renovations and Expansion PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> Palm Beach Gardens, Florida 2008 2008
<br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE I8l Check if project performed with current firm
<br />b. The project consisted of extensive renovations and refurbishment of the existing resort main building, the
<br /> membership clubhouse, the main entry way, restaurants, restrooms, conference rooms and the pool area
<br /> including a new pool deck pavilion. Also, MEP renovations of the 35,000 sf conference wing which includes 23
<br /> meeting rooms and 2 ballrooms, also the PGA Grand Ballroom with 10,000 sf and the pre-function area, PGA
<br /> Championship Hall; and the 50-seat amphitheater. Role: Project Manager
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Miami-Dade College Continuing Services (2008-2011) PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> Miami, Florida ongoing 2011
<br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE I8l Check if project performed with current firm
<br />c. North Campus - Replacement of 4 existing air handling units located in Bldg 3000/$350,000/
<br /> North Campus - Replacement of 2 existing air handling units located in Bldg 5000/$250,000/
<br /> North Campus - Replacement of 1 existing air handling unit located in Bldg 5000/$135,000/
<br /> Wolfson Campus - Replacement of 1 existing air handling unit located in Bldg 1000/$250,000/
<br /> Kendall Campus - Adding an air cooled chiller to provide chilled water for backup air-conditioning for office
<br /> areas located on the first floor of Building U $135,000 - Role: Project Manaqer/Mechanical Enqineer
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Columbus Networks Office Renovation PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> North Miami, Florida ongoing 2010 (approx.)
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE I8l Check if project performed with current firm
<br /> Renovations of an existing building and the construction of a new 9,000 sq. ft. storage/office building for this
<br /> Fiber Optic Communications Hub. The project is divided into Phase1 for the renovations of the entire first floor
<br /> and some minor renovations of the second floor in the existing building and Phase 2 for the construction of the
<br /> new facilitv. Role: Mechanical Engineer
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Hialeah Palm Center LEED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
<br /> Hialeah, Florida ongoing 2011 (approx.)
<br />e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE I8l Check if project performed with current firm
<br /> LEED Consulting, LEED Registration and Documentation, Energy Modeling and Fundamental Commissioning
<br /> for approximately 81,000 square feet, five (5) story new residential apartment building, with 72 units, a one-
<br /> story, 6,000 square foot, medical outpatient facility building and a three (3) level (plus roof) 383 spaces,
<br /> structured parking garage. Role: LEED Consultant and Commissioning Agent
<br />
|