Laserfiche WebLink
<br />12. NAME <br />Marile B. Borino, EI, LEED AP <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key oerson. ) <br />13. ROLE IN THIS CONTRACT <br />Electrical Engineering <br /> <br />a. TOTAL <br /> <br />21 <br /> <br />14. YEARS EXPERIENCE <br />I b. WITH CURRE~T FIRM <br /> <br />15. FIRM NAME AND LOCATION (Cttyand State) <br />TLC Engineering for Architecture, Inc. - 5757 Blue Lagoon Drive #400, Miami, Florida 33126 <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />B.S. in Electrical Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />N/A <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc.) <br />LEED Accredited Professional <br /> <br />19 RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Pelican Community Center Recreational Building PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Sunny Isles, Florida 2008 2008 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm <br />New two-story, 13,000 square foot community center building and a basketball/gymnasium building of <br /> approximately 9,900 square feet. The community center building includes some offices, several multi-purpose <br /> spaces, a warming kitchen and a pantry for the use of caterers. The Gymnasium includes a full-size basketball <br /> court and a snack bar area. Role: Electrical Engineering <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami Beach Continuing Services PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami Beach, Florida 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm <br />b. 777 Building - Replacement of the existing HV AC system within the 777 building located in 1701 Meridian <br /> Avenue in Miami Beach, Florida. The building is 5 floors with the top floor only occupying half the floor. The <br /> new design is a water cooled chilled water system with new variable air volume air handlers with electronic <br /> DDC controls. The new air handlers are located within the same mechanical rooms increasing the size as <br /> need to provide clearances for the units. Role: Electrical Enqineerinq <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Hialeah Palm Center LEED Consulting PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Hialeah, Florida ongoing 2010 (approx.) <br />c. (3) BRtEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm <br /> LEED Consulting, LEED Registration and Documentation, Energy Modeling and Fundamental Commissioning <br /> for approximately 81,000 square feet, five (5) story new residential apartment building, with 72 units, a one- <br /> story, 6,000 square foot, medical outpatient facility building and a three (3) level (plus roof) 383 spaces, <br /> structured parking qaraqe. Role: LEED Consultant <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Columbus Networks Office Renovation PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> North Miami, Florida ongoing 2010 (approx.) <br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm <br /> Renovations of an existing building and the construction of a new 9,000 sq. ft. storage/office building for this <br /> Fiber Optic Communications Hub. The project is divided into Phase1 for the renovations of the entire first floor <br /> (except for the battery room) and some minor renovations of the second floor in the existing building and Phase <br /> 2 for the construction of the new facility. Role: Project Manaaer <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> MTV Networks Office Improvements PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) <br /> Miami Beach, Florida 2006 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE 181 Check if project performed with current firm <br />e. The project consists of the office improvements on the fifth and sixth floors of an existing office building located <br /> in Miami Beach, Florida. The project was divided into four phases. Phases I and II, both on the sixth floor, <br /> consisted of, approximately, 6,153 square feet and 2,049 square feet, respectively. Phases III and IV, both on <br /> the fifth floor, consisted of, approximately, 3,802 square feet and 3,721 square feet, respectively. <br /> Role: Electrical Engineering <br />