My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TLC Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
TLC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:55:22 AM
Creation date
11/18/2010 9:55:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles <br />RFQ No. 10-04-01 <br /> <br />Professional Engineering Services <br /> <br />Relevant Projects in the Past Five Years <br /> <br />PROJECTS IN PROGRESS <br /> <br />BARRY UNIVERSITY MASTER PLAN, Miami, FL <br />Evaluation and recommendations to improve electrical, gas and communications systems <br />Estimated completion: 2011 Current status: Evaluation Phase <br />Client Reference: Steve Warren, HEWV Tel: 813.221.0770 <br /> <br />KENSINGTON PARK ELEMENTARY, Miami, FL <br />MEP engineering design due to ADA upgrades <br />Estimated completion: 2010 Current status: 75% Construction Documents <br />Client Reference: Caridad Hidalgo-Gato, KVH Architects Tel: 305.599.5221 <br /> <br />MOTOROLA OFFICE RENOVATION, Plantation, FL <br />MEP engineering for the relocation of equipment and renovations to cafe and assembly areas <br />Estimated completion: 2011 Current status: Construction Administration <br />Client Reference: Dave Robinson, Turner Construction Tel: 786.621.9150 <br /> <br />801 BRICKELL BUILDING, Miami, Florida <br />Energy Management Systems Upgrade <br />Estimated completion: 2010 Current status: Evaluation phase <br />Client Reference: Karyn Weiss, CPM, RPA, Grubb & Ellis Tel: 305.536.2920 <br /> <br />DOUBLETREE MIAMI, Miami, Florida <br />MEP Engineering for the renovations to the exhibition center <br />Estimated completion: 2011 Current status: Construction Documents <br />Client Reference: Nelson Goris, Studio 5 Design + Architecture Tel: 305.740.0675 <br /> <br />TRINITY CATHEDRAL, Miami, Florida <br />40-year recertification and MEP engineering for the required renovations <br />Estimated completion: 2011 Current status: Recertification CDs <br />Client Reference: Richard Heissenbottle, RJ HA Tel: 305.446.7799 <br /> <br />MIAMI-DADE COLLEGE CLASSROOM BUILDING, Miami, FL <br />New 5-story facility including student services, food services and library <br />Estimated completion: 2013 Current status: Design Development <br />Client Reference: Jose Murguido, Zyscovich Architects Tel: 305.352.5222 <br /> <br />ARQUITECTONICA MIAMI HEADQUARTERS, Coconut Grove, FL <br />MEP Engineering for the demolition of an existing building and construction of new office building. <br />Estimated completion: 2010 Current status: Construction Administration <br />Client Reference: Sherri Gutierrez, Arquitectonica Tel: 305.372.1812 <br /> <br />CITY OF HIALEAH PALM CENTER HOUSING, Hialeah, FL <br />LEED Consulting, energy modeling & Commissioning for a mixed use project, including residential <br />apartments, outpatient clinic and parking garage <br />Estimated completion: N/A Current status: Under design <br />Client Reference: Jorge Guanchez, City of Hialeah Tel: 305.687-2682 <br /> <br />TLC Engineering for Architecture, Inc. <br />5757 Blue Lagoon Dr. #400, Miami, FL 33126 Tel: 305.266.6553 <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.