Laserfiche WebLink
<br />City of Sunny Isles <br />RFQ No. 10-04-01 <br /> <br />Professional Engineering Services <br /> <br />MIAMI DADE COLLEGE CONTINUING SERVICES, Miami, FL <br />Electrical and Mechanical engineering for multiple Air Handling Unit Renovations and LEED Consulting <br />for the Culinary Arts Center <br />Estimated completion: 2010 Current status: Various, 11 projects in total <br />Client Reference: Carlos Dougnac, Miami-Dade College Tel: 305.237-0565 <br /> <br />COLUMBUS NETWORKS, Plantation, FL <br />MEP Engineering for renovations and upgrades to existing facility <br />Estimated completion: 2011 Current status: Construction Documents <br />Client Reference: Rebecca Stanier-Shulman, Shulman + Assoc. Tel: 305.438-0609 <br /> <br />FLORIDA DEPARTMENT OF HEALTH, Miami, FL <br />MEP Engineering for the construction of the new central facility shell and interiors including offices and <br />clinics <br />Estimated completion: 2011 Current status: Construction Administration <br />Client Reference: Rolando Conesa, MGE Architects Tel: 305.444.0413 <br /> <br />UNIVERSITY OF MIAMI ALUMNI CENTER, Coral Gables, FL <br />MEP Engineering and LEED Consulting for the new facility including conference rooms, library and <br />offices-LEED Silver Registered <br />Estimated completion: 2011 Current status: Construction Administration <br />Client Reference: Rolando Conesa, MGE Architects Tel: 305.444.0413 <br /> <br />MONROE COUNTY EMERGENCY OPERATIONS CENTER, Marathon, FL <br />MEP engineering for the new 14,000 sf emergency operations center <br />Estimated completion: 2012 Current status: Construction Documents <br />Client Reference: Sergio Baca, Architectural Design Group, Inc. Tel: 407.647.1706. <br /> <br />PORT OF MIAMI TERMINAL B/C UPGRADES, Miami, FL <br />MEP Engineering for the renovations to the US Customs One-Stop Station on Terminals Band C <br />Estimated completion: 2010 Current status: Construction Administration <br />Client Reference: Victoria Valdez, Port of Miami Tel: 305.347.3239 <br /> <br />MIAMI INTERNATIONAL AIRPORT A-B INFILL, Miami, FL <br />MEP and Structural engineering for the demolition and construction of 300,000 sq. ft., including interior <br />build out <br />Estimated completion: 2011 Current status: Construction Administration <br />Client Reference: Eddie Alvarado, Leo A. Daly Tel: 305.461.9480 <br /> <br />COMPLETED PROJECTS <br /> <br />CITY OF MIAMI MOORE PARK, Miami, FL <br />MEP Engineering for the renovations including new restroom building, new bleachers, new pressbox and <br />upgraded lighting. <br />Completion Date: <br />Client Reference: <br /> <br />2010 <br />Judy Carty, Borrelli + Partners <br /> <br />Tel: 305.665.8852 <br /> <br />TLC Engineering for Architecture, Inc. <br />5757 Blue Lagoon Dr. #400, Miami, FL 33126 Tel: 305.266.6553 <br /> <br />4 <br />