My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TLC Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
TLC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:55:22 AM
Creation date
11/18/2010 9:55:10 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles <br />RFQ No. 10-04-01 <br /> <br />Professional Engineering Services <br /> <br />FLORIDA ATLANTIC UNIVERSITY RECREATION AND WELLNESS CENTER, Boca Raton, FL <br />MEP Engineering for the facility including fitness center, basketball & volleyball courts and <br />lockers <br />Completion Date: <br />Client Reference: <br /> <br />2010 <br />Judy Carty, Borrelli + Partners <br /> <br />Tel: 305.665.8852 <br /> <br />MIAMI-DADE FIRE RESCUE DEPARTMENT at PORT OF MIAMI, Miami, FL <br />MEP Engineering for the renovations to the offices space, kitchen, laundry and HVAC system upgrade <br />Completion Date: 2009 <br />Client Reference: Victoria Valdez, Port of Miami Tel: 305.347.3239 <br /> <br />MR. CHOW RESTAURANT, Miami Beach, FL <br />MEP Engineering for the new luxury restaurant on the ground floor of the W Hotel <br />Completion Date: 2009 <br />Client Reference: Alexis Roworth, Flex Designs LLC Tel: 323.851.1557 <br /> <br />PGA NATIONAL RESORT RENOVATION, Palm Beach Gardens, FL <br />MEP and Structural engineering for the renovations and HVAC upgrades to multiple areas in the resort <br />Completion Date: 2009 <br />Client Reference: Ed Nystrom, Nanc Construction Services Tel: 954.845.2350 <br /> <br />FLORIDA INTERNATIONAL UNIVERSITY FOOTBALL STADIUM, Miami, FL <br />MEP Engineering for the stadium expansion including concessions, additional seats, lockers, lighting and <br />private suites. <br />Completion Date: <br />Client Reference: <br /> <br />2008 <br />Dean Radeloff, Odebrecht Construction <br /> <br />Tel: 305.341.8800 <br /> <br />FLORIDA DEPARTMENT OF ADMINISTRATIVE HEARINGS, Miami, FL <br />MEP engineering for the interior office improvements for 14,400 sf <br />Completion Date: 2008 <br />Client Reference: Lisa Mustain, FDAH Tel: 850.488.9675 <br /> <br />CITY OF MIAMI BEACH 777 BUILDING, Miami Beach, FL <br />Mechanical and electrical engineering for the HVAC Upgrades to existing building <br />Completion Date: 2008 <br />Client Reference: Olga Sanchez, City of Miami Beach Tel: 305.673.7000 <br /> <br />GAZIT GROUP USA, North Miami, FL <br />MEP Engineering and LEED Consulting for a Tenant fit-out- LEED CI SILVER Certified <br />Completion Date: 2008 <br />Client Reference: Ofer Stark, Stark Design Studio Tel:908.890.0005 <br /> <br />SUNNY ISLES COMMUNITY SCHOOL, Sunny Isles Beach, FL <br />MEP Engineering for the new K-8 facility, including media center, music and science labs <br />Completion Date: 2008 <br />Client Reference: James Cohen, SBLM Architects Tel: 305.412.9187 <br /> <br />TLC Engineering for Architecture, Inc. <br />5757 Blue Lagoon Dr. #400, Miami, FL 33126 Tel: 305.266.6553 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.