Laserfiche WebLink
<br />this item shall cover call-outs for emergency and unique situations. For this item to <br />be accepted and paid for by the City, the services must be specifically requested by <br />the City for a specific task. <br /> <br />3.5 D. MATERIALS <br /> <br />D1. This proposal item is to include the supplying, delivery, placement, and grading of topsoil in <br />the locations designated by the City. This topsoil shall be a mix of 70% organics (peat moss, <br />etc.) and 30% sand. The supplying and placing of this item is separate and unique from the <br />normal need to supply and place this material as part of the ongoing operations covered in <br />other proposal items. For this item to be accepted and paid for by the City, the service must <br />be specifically requested by the City for a unique and specific task. In areas of traffic, the <br />proposal will include all appropriate traffic control devices that conform to an approved <br />Management of Traffic (MOT) plan. All traffic control costs shall be a part of the unit price <br />proposal and shall not be paid for separately. <br /> <br />D2. This proposal item is to include the supplying, delivery, placement, and grading of either <br />Premium Red or Premium Gold (as designated by the City) colored mulch in the locations <br />designated by the City. The supplying and placing of this item is separate and unique from <br />the normal need to supply and place this material as part of the ongoing operations covered in <br />other proposal items. For this item to be accepted and paid for by the City, the service must <br />be specifically requested by the City for a unique and specific task. In areas of traffic, the <br />proposal will include all appropriate traffic control devices that conform to an approved <br />Management of Traffic (MOT) plan. All traffic control costs shall be a part of the unit price <br />proposal and shall not be paid for separately. <br /> <br />D3. This proposal item is to include the supplying, delivery, placement, and grading of #70 Trap <br />Sand in the locations designated by the City. The supplying and placing of this item is <br />separate and unique from the normal need to supply and place this material as part of the <br />ongoing operations covered in other proposal items. For this item to be accepted and paid for <br />by the City, the service must be specifically requested by the City for a unique and specific <br />task. In areas of traffic, the proposal will include all appropriate traffic control devices that <br />conform to an approved Management of Traffic (MOT) plan. All traffic control costs shall be a <br />part of the unit price proposal and shall not be paid for separately. <br /> <br />D4. This proposal item is to include the supplying, delivery, placement, and grading of Atlas 3000 <br />(or equal) 70/30 mix in the locations designated by the City. The supplying and placing of this <br />item is separate and unique from the normal need to supply and place this material as part of <br />the ongoing operations covered in other proposal items. For this item to be accepted and <br />paid for by the City, the service must be specifically requested by the City for a unique and <br />specific task. In areas of traffic, the proposal will include all appropriate traffic control devices <br />that conform to an approved Management of Traffic (MOT) plan. All traffic control costs shall <br />be a part of the unit price proposal and shall not be paid for separately. <br /> <br />D5. This proposal item is to include the supplying, delivery, placement, and initial irrigating of <br />Solid St. Augustine Floratam Sod (or approved equal) in the locations designated by the City. <br />The supplying and placing of this item is separate and unique from the normal need to supply <br />and place this material as part of the ongoing operations covered in other proposal items. For <br />this item to be accepted and paid for by the City, the service must be specifically requested by <br />the City for a unique and specific task. In areas of traffic, the proposal will include all <br />appropriate traffic control devices that conform to an approved Management of Traffic (MOT) <br />plan. All traffic control costs shall be a part of the unit price proposal and shall not be paid for <br />separately. <br /> <br />PAGE 24 OF 105 <br />PROPOSAL No. <br />