Laserfiche WebLink
<br />NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he/she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL <br />TOTAL <br />C. E(~UIPMENT <br /> X $ $ <br />Cl One Front End Loader with Backhoe, including an 250 Hours <br />Operator <br /> Per Hour = <br /> X $ $ <br />C2 One Front End Loader with Backhoe, including an 30 Days <br />Operator <br /> Per Day = <br /> X $ $ <br />C3 One Front End Loader with Backhoe, including an 4 Weeks <br />Operator <br /> Per Week = <br /> X $ $ <br />C4 One Front End Loader with Backhoe, including an 1 Month <br />Operator <br /> Per Month = <br /> X $ $ <br />CS One 15,000 GVW (or larger) Dump Truck with an 100 Hours <br />Operator <br /> Per Hour = <br /> X $ $ <br />C6 One 15,000 GVW (or larger) Dump Truck with an 10 Days <br />Operator <br /> Per Day = <br /> X $ $ <br />C7 One 15,000 GVW (or larger) Dump Truck with an 1 Week <br />Operator <br /> Per Week = <br /> X $ $ <br />C8 One 15,000 GVW (or larger) Dump Truck with an 1 Month <br />Operator <br /> Per Month = <br /> X $ $ <br />C9 One Trailer Mounted Water Tank (500 gallon 20 Days <br />minimum) with Pump and Hose Reel <br /> Per Day = <br /> X $ $ <br />Cl0 One Trailer Mounted Water Tank (500 gallon 2 Weeks <br />minimum) with Pump and Hose Reel <br /> Per Week = <br /> <br />PAGE 58 OF 105 <br />PROPOSAL No. <br />