Laserfiche WebLink
<br />NOTE: The quantities shown in this Bid Form are estimates only! They may vary significantly from the actual <br />quantities ordered by the City. Payments shall be for the units ordered, placed, and accepted by the City. The <br />Proposers, by signing this Bid Form and Contract, fully acknowledges that he/she will receive no additional <br />compensation (no overhead, no anticipated profits, etc.) other than the proposal unit price of the items times the <br />number of items authorized, ordered, placed, and accepted by the City. <br />ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PROPOSAL <br />TOTAL <br /> X $ $ <br />Cll One Trailer Mounted Water Tank (500 gallon 1 Month <br />minimum) with Pump and Hose Reel <br /> Per Month = <br /> X $ $ <br />C12 One Self Propelled 24" Deep by 6" Wide Trencher 50 Hours <br />with an Operator <br /> Per Hour = <br /> X $ $ <br />C13 One Self Propelled 24" Deep by 6" Wide Trencher 5 Days <br />with an Operator <br /> Per Day = <br /> X $ $ <br />C14 One Self Propelled 24" Deep by 6" Wide Trencher 2 Weeks <br />with an Operator <br /> Per Week = <br /> X $ $ <br />CiS One Self Propelled 24" Deep by 6" Wide Trencher 1 Month <br />with an Operator <br /> Per Month = <br /> X $ $ <br />C16 Bucket Truck (equipment only) 50 Hours <br /> Per Hour = <br /> X $ $ <br />C17 Chipper Brush (equipment only) 50 Hours <br /> Per Hour = <br /> X $ $ <br />C18 Stump Grinder(equipment only) 50 Hours <br /> Per Hour = <br /> X $ $ <br /> Grapple Loader <br />C19 (30 cubic yard capacity, 50 Hours <br /> equipment only) Per Hour = <br /> $ <br />C SUBTOTAL <br /> <br />PAGE 59 OF 105 <br />PROPOSAL No. <br />