Laserfiche WebLink
<br />History, Team and Performance Record <br /> <br />agent on the Miami Children's Hospital parking garage, which is nearing completion. Mr. James Harper has seventeen (17) <br />years experience and serves as Senior Structural Inspector. Project experience for both has been primarily cast-in-place <br />reinforced and post tension concrete of 2 to 50 stories in height. They have also monitored installation and post tensioning <br />of cables on reinforced concrete flat plate. post tensioned buildings and CMU construction. Types of construction range <br />from reinforced concrete frame with pre-cast joist, cast in place concrete floor system to reinforced concrete frame with flat <br />slab, post tensioned systems including pile caps and footings. <br /> <br />. <br /> <br />GOVERNMENT AGENCY EXPERIENCE & OUALlFICA TlON BASED CONTRACTS <br />(Excluding Treasure Coast Contracts) <br />NUTIING's vast government contract experience in Florida gives us the expertise and familiarity with guidelines and <br />protocols to provide our services as requested by the City of Sunny Isles Beach. These below-outlined contracts are all <br />qualifications based selections (CCNA) most dating back twenty years of continuous service. We also provide services to <br />the Florida Department of Transportation (FOOT) and South Florida Water Management District (SFWMD). Based on this <br />experience. we are extremely familiar Florida's regulatory agencies and regulations. <br /> <br />All of the contracts outlined below are Qualification Based Contracts/CCNA and are a source of pride for NUTIING. <br /> <br />BROW ARD COUNTY <br />Broward Community College <br />In Association with Miller Legg & <br />Associates, Geotechnical Engineering, <br />Materials Testing <br />- Since 2000 - <br /> <br />. <br /> <br />School Board of Broward County <br />Environmental Services. Geotechnical <br />Engineering, Materials Testing. <br />Structural Inspections <br />- Since 1986 - <br /> <br />Engineering & Public Works Dept.: <br />Environmental Services. Geotechnical <br />Engineering, Materials Testing, <br />Structural Inspections <br />-Since 1986- <br /> <br />City of Hallandale: <br />Environmental Services. Geotechnical <br />Engineering, Materials Testing. <br />Structural Inspections <br />- Since 1997 - <br /> <br />SCRIPPS BIOMEDICAL <br />RESEARCH FACILITY <br />Performing Construction Materials <br />Testing and Inspections <br />- Since 2006 - <br /> <br />MIAMI - DADE COUNTY <br />Multiple County Departments: <br />Environmental Services, Geotechnical <br />Engineering, Materials Testing, <br />Structural Inspections <br />- Since 1996 - <br /> <br />Miami Dade County Public Schools: <br />Environmental Services, Geotechnical <br />Engineering, Materials Testing. Structural <br />Inspections <br />- Since 2000 - <br /> <br />City of Miami Beach <br />Geotechnical Engineering/Exploration. <br />Construction Materials Testing <br />- Since 2007- <br /> <br />MONROE COUNTY <br />Village of Islamorada <br />Geotechnical Engineering. Construction <br />Materials Testing. Threshold Inspections <br />- Since 2008 - <br /> <br />Florida Keys Aqueduct Authority <br />Geotechn ical Engineering & Construction <br />Materials Testing <br />- Since 1995 - <br /> <br />PALM BEACH COUNTY <br />Engineering & Public Works Dept.: <br />Environmental Services. Soils. <br />Foundations. Materials Testing. <br />Structural Inspections <br />- Since 1986 - <br /> <br />School District of Palm Beach County: <br />Environmental Services. Geotechnical <br />Engineering. Materials Testing. <br />Structural Inspections <br />- Since 1986 - <br /> <br />City of Palm Beach Gardens <br />Geotechnical Engineering. Construction <br />Materials Testing. Environmental Servo <br />- Since 2006 - <br /> <br />Villa2:e of Wellin2:ton <br />Geotechnical Engineering. Construction <br />Materials Testing. Environmental Servo <br />- Since 2006 - <br /> <br />Our past experience with public agencies has taught us there are ancillary responsibilities in maintaining a qualification <br />based contract. This includes knowing the proper accounting/ purchase order system of the entity. assigning the same <br />project manager/ engineer throughout the term of the contract, and visiting the different departments regularly to meet the <br />new employees of the different departments to create a comfort level with each other and at times training others as to our <br />services and how to interpret test results. We also understand the importance of value engineering. maintaining the budget, <br />and responding quickly to the needs of the entity and the other team members. <br /> <br />. <br /> <br />4:\ Nunlng <br />~ ~t'!~~~~~ <br />