My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.-# 5
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
R.J. Behar & Co.-# 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2011 4:42:59 PM
Creation date
11/19/2010 4:31:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />RFQ 07-07-01 <br />General Engineering Consultant <br /> <br />Addendum 3 <br /> <br />QUESTION: <br />Our company is able to service 4 of the disciplines listed in your scope of services. Will <br />you be hiring several companies to cover each the services or will we need to team up <br />with a prime engineer to cover all the services under this contract? (For example, a <br />geotechnical engineer can submit only for the services they provide, a structural engineer <br />for their services, etc.) Also, we would like to be able to submit for only the services we <br />provide but, if we need to team with a prime that would be fine, I just need to know how <br />to go about submitting for this contract. <br /> <br />ANSWER: <br />You can submit for just those disciplines you feel qualified to provide, you do not <br />have to cover everyone of them. That's why we intend to make multiple <br />selections. Please do however, clearly state those specific disciplines that you feel <br />qualified to provide. <br /> <br />. <br /> <br />QUESTION: <br />What would you consider <br />construction inspections? <br /> <br />structural inspections and what would you consider <br /> <br />ANSWER: <br />Construction will review the physical placement, structural will cover the detailed <br />design. <br /> <br />. <br /> <br />RFQ 07-07-01 Gen Engineering Consultants.Addendum3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.