Laserfiche WebLink
<br />. <br /> <br />Q: <br />A: <br />Q: <br />A: <br />Q: <br />A: <br />Q: <br />A: <br />Q: <br />A: <br />. <br />Q: <br />A: <br />Q: <br />A: <br /> <br />RFQ 07-07-01 <br />General Engineering Consultant <br /> <br />Addendum 4 <br /> <br />Is there going to be a pre-proposal meeting (mandatory or not)? <br />No. <br /> <br />In Section 1.6/ Submittal requirements does item #, #7 and #8 count as part of the <br />fifteen (15) page maximum of the Technical Proposal? <br />No. <br /> <br />Do the Prime / Subs need to be registered with the City? <br />No. <br /> <br />How many consultants will be selected? <br />More than one. <br /> <br />Does the five (5) years experience criteria extend to the sub-consultants? <br />There should be no need to include subcontractors; we are only interested in <br />what services your firm can provide. <br /> <br />What is the length of the contract going to be? <br />To be determined, but expect one year with renewable options. <br /> <br />Will there be any building design and construction services required in the scope <br />of services? <br />We are asking you to tell us what types of services you can provide in- <br />house. We are not asking you to gather subs for a one-stop-shop. There <br />will be several contracts awarded to cover all bases. <br /> <br />Q: Is the City looking for a consultant teams that can perform all of the tasks listed in <br />the Scope of Services or teams that specialize in specific tasks? <br />A: Specialized tasks. <br /> <br />Q: Will GIS services be part if the Scope of Services? <br />A: Yes. <br /> <br />Q: Will current consultants performing design services for the City be allowed to <br />also submit for this General Engineering Services Contract? <br />A: Yes. <br /> <br />. <br /> <br />RFQ 07-07-01 Gen Engineering Consultants,Addendum4 <br />