Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />~Il <br />A.D.A <br />1:M.:"[C"I..:".:M:Mr....:"[.... <br /> <br /> <br />The Quality Assurance <br />and Control Plan will be <br />initiated at the project's <br />kick-off and will continue <br />through the life of the <br />project. This process is <br />applied to all facets of the <br />project and is not just <br />implemented prior to a <br />project's deliverable <br />deadline. This process <br />will be a systematic <br />review that will document <br />all findings. Our detailed <br />and comprehensive <br />Quality Assurance and <br />Control Plan has proven <br />to significantly reduce our <br />Client's review efforts. <br />The review team will also <br />review our plans and <br />calculations prior to <br />presentation to the City. <br />This will afford the City the benefit of two reviews to enhance the quality assurance of the project. This review will <br />concentrate on two major areas: quality of design and quality of construction plans. The quality of design will <br />investigate the design criteria, technical adequacy, calculations, constructability, cost effectiveness of the design, <br />and consistency with the scope of work. The quality of the deliverables and construction plans will ensure that <br />complete, legible, and easy to understand documents, plans and specifications are developed, while eliminating the <br />potential for contractor request for clarifications or change orders. <br /> <br />-- <br />..- <br /> <br />FINAL SUBMITTAL <br /> <br />-- <br /> <br />Page 15 <br /> <br />RFQ No. 07-07-01 <br />PROFESSIONAL GENERAL ENGINEERING CONSULTANT <br />