Laserfiche WebLink
<br />e <br /> <br />...i <br />0< <br />[f) <br />o <br />"- <br />o <br />Ct: <br />"- <br />[f) <br />I <br />>- <br />"- <br />o <br />w <br />'" <br />0< <br />"- <br />~ <br />>- <br />;::: <br />W <br />I <br />>- <br />Z <br />o <br />Z <br />o <br />;::: <br />u <br />0: <br />>- <br />[f) <br />W <br />Ct: <br />W <br />I <br />>- <br />o <br />>- <br /> <br />ei <br /> <br />[f) <br />~ <br />>- <br />W <br />W <br />I <br />[f) <br />[f) <br />I <br />>- <br />z <br />o <br />o <br />w <br />Z <br />;;' <br />>- <br />z <br />o <br />U <br />0< <br />>- <br />0< <br />o <br />"- <br />o <br />w <br />Ct: <br />::> <br />[f) <br />g <br />u <br />[f) <br />is <br />Ct: <br />o <br />w <br />[f) <br />::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />analyses. Construction specifications and drawings were <br />also prepared for use by the client in construction in <br />2005-2007. <br /> <br />Accomplishments: <br />,\ccomplished the field itl\'estigation program \vithin the <br />allotted time schedule which was mandatcd by the DEC <br />due to hunting season starting in early Septcmber. <br />Boring was performed in August 200-1-. <br /> <br />Lead Geotechnical Engineer, Hanscom Air Force <br />Base, Housing Privatization Project, U.S. Air Force, <br />Hanscom Field, Middlesex County, MA, 01/2005- <br />12/2005. This project involves the demolition and <br />reconstruction of housing at Hanscom Field for military <br />personnel. Borings wcre pcrformed within thc four <br />neighborhoods to pro,'ide information for design of <br />housing, roads, and community-usc structurcs. :\ <br />geotechnical report was preparcd summarizing the <br />findings and presenting foundation recommendations. <br /> <br />Lead Geotechnical Engineer, Transitway <br />Maintenance Facility, 02053, Massachusetts Bay <br />Transportation Authority, Southampton Street, <br />Boston, Massachusetts, 01/2000 - 10/2003. t-,[s. <br />t-,IcCoy was responsible for planning and (werseeing the <br />subsurface im'estigation program. Borings and <br />laboratory test \"ere performed and Ms. l\IcCoy <br />produced the geotechnical investigatioll and foulldation <br />recommendation report. Deep foundations \vere <br />selected and designed to support the bus garage, <br />maintenance facility, buswash and fueling buildings. t-,[s. <br />i\IcCoy produced the contract specifications dealing with <br />dri,'en piles and O\'ersaw the required pile load tests and <br />re\'iewed contractor submittals. [\pproximately 700, <br />l2x53 H-piles \vere installed to a depth of 85 feet \vith a <br />50 ton design load. <br /> <br />Geotechnical Engineer, Independent Spent Fuel <br />Installation, Nuclear Management Company, <br />Duane Arnold Energy Center, Palo, Iowa, 04/2001 - <br />07/2002. i\ls. i\IcCoy assisted in the subsurface <br />exploration and construction document preparation for <br />an independent spent fuel installation at the Duane <br />[\mold nuclcar powcr plant located in Palo, Iowa. <br />Specifications for borings, laboratory testing, and <br />geophysical testing was prepared by her. Ms. tvIcCoy <br />oversaw the borings drilled for this project and prepared <br /> <br />the final boring logs. tv[s. l\IcCoy prepared bearing <br />capacity calculations and assisted in the preparation of <br />the Geotechnical Report. i\[s. i\IcCoy assisted the client <br />at thc site in thc ovcrsight of excavation and backfill <br />placement for the [SFSl construction. <br /> <br />Lead Geotechnical Engineer, Ravenswood <br />Cogeneration Facility, KeySpan Energy, Long <br />Island City, Queens, NY, 11/2000 - 06/2002. i\[s. <br />McCoy was assigned as the Lead Geotechnical Engineer <br />for the proposed 250 tv[\\/ Ravenswood Cogeneration <br />Facility located at the existing KeySpan Energy <br />Ravcnswood Facility in Long Island City, NY. r.Is. <br />~..rcCoy planned and O\Trsaw the subsurface <br />investigation program and directed the appropriate <br />laboratory testing (performed by others). She revicwed <br />and appr()\'ed the subsurface im'estigation report <br />prcpared by others and used as the basis for foundation <br />design and construction. l\[S. r.IcCoy directed and <br />participated in the preparation of calculations, design <br />critcria and construction specifications for this project. <br />Approximately 300 drilled piers \vith diameters of 2, -1- <br />and 5 ft \"ere drilled and socketed into bedrock for <br />foundation support. <br /> <br />Technical Manager - Section D019E, Central Artery <br />(1-93)/Tunnel (1-90) Project, Massachusetts <br />Highway Department, Boston, MA, 02/1992- <br />12/1996. t\[s. McCoy was rcsponsible for the technical <br />aspects of the project team's work as Area Geotechnical <br />Consultant, Area 05 (North Area) of the Central <br />Artery/Tunnel Projcct in Boston, MA. This project <br />invoked proposcd tunnel, at-grade, embankment, and <br />\.iaduct structurcs and utility relocations \vithin an urban <br />setting and major rail transportation corridor. t\[s. <br />t\IcCoy's duties included participation and presentation <br />at project progress and technical meetings, and input to <br />progress reports, project documents, and technical <br />reports. She performed or directed the preparation of <br />project calculations for development of geotechnical <br />design recommendations and design criteria and was <br />responsible for the DO 19E Data and Enginccring <br />Reports. t\[s. tvIcCoy also consulted and assisted with <br />similar work for the adjacent design sections DO 190 and <br />DOI9B. <br /> <br />SHAW ENVIRONMENTAL. INC. <br /> <br />2 <br /> <br />JANICE WRIGHT MCCOY <br /> <br />ooe 122006T <br />