<br />e
<br />
<br />...i
<br /><(
<br />r/)
<br />o
<br />0-
<br />o
<br />a:
<br />0-
<br />r/)
<br />r
<br />f-
<br />lL
<br />o
<br />W
<br /><!)
<br /><(
<br />0-
<br />W
<br />..J
<br />f-
<br />;::
<br />w
<br />I
<br />f-
<br />Z
<br />o
<br />Z
<br />o
<br />;::
<br />u
<br />ii'
<br />>-
<br />r/)
<br />w
<br />a:
<br />w
<br />I
<br />f-
<br />o
<br />f-
<br />ei
<br />r/)
<br />'!?
<br />f-
<br />W
<br />W
<br />I
<br />r/)
<br />r/)
<br />r
<br />>-
<br />z
<br />o
<br />o
<br />w
<br />z
<br />;;:
<br />>-
<br />Z
<br />o
<br />U
<br /><(
<br />f-
<br /><(
<br />o
<br />lL
<br />o
<br />W
<br />a:
<br />=>
<br />r/)
<br />g
<br />U
<br />r/)
<br />o
<br />a:
<br />o
<br />w
<br />r/)
<br />=>
<br />
<br />e
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />Janice Wright McCoy, P.E.
<br />
<br />Education
<br />
<br />B.s., Ci,"il Engineering, Rensselaer Polytechnic Institute,
<br />19N
<br />
<br />Other, Civil! Geotechnical Engineering, Ohio State
<br />U niversit:y
<br />
<br />Registrations
<br />
<br />Professional Engineer: Civil, AZ, tvL\
<br />
<br />Background Summary
<br />
<br />tvIs. tvlcCoy, a Lead Geotechnical Engineer in the
<br />Infrastructure Group, has m"er 32 ~"ears of experience in
<br />the field of geotechnical engineering. 1\[s. l\lcCoy's work
<br />includes all aspects of geotechnical engineering including
<br />subsurface investigations, determination of laboratory
<br />testing programs, engineering analyses, and report
<br />preparation. l\[s. l\lcCoy has been im"ol\'ed with the
<br />design of a nuclear pmver plant turbine building
<br />foundation in Taiwan, including the rock exca,"ation
<br />scheme. She has been itwoked \vith the geotechnical
<br />aspects of Independent Spent Fuel Storage Installations
<br />at se,"eralnuclear plants. She was also inwlked in the
<br />detailed geotechnical im"estigation and design criteria
<br />de\"elopment for the North Area of the Central
<br />Artery/Tunnel Project. A summary of her \vork
<br />includes static and dynamic settlement analyses, bearing
<br />capacity analyses, slope stability, liquefaction analyses,
<br />sheetpile and soil anchor design, drilled pier design,
<br />oversight of field activities including borings, earthwork,
<br />piles, and drilled pier installation. She has also prepared
<br />specifications for the geotechnical aspects of many
<br />cons truction projects.
<br />
<br />Relevant Experience
<br />04/1978 - Present, Geotechnical
<br />Engineer, Shaw Environmental &
<br />Infrastructure, Inc.
<br />Responsibilities include planning and overseeing
<br />subsurface investigations, including determination of
<br />laboratory testing program and appropriate engineering
<br />analyses. Preparation of construction documents
<br />including geotechnical reports, specifications, and input
<br />to design drawings. Oversight of field activities
<br />including drilling programs, earthwork, and installation
<br />
<br />SHAW ENVIRONMENTAL. INC.
<br />
<br />06C122006T
<br />
<br />of deep foundations including piles, sheet piles, and
<br />drilled piers.
<br />
<br />The following is a summary of key projects:
<br />Lead Geotechnical Engineer, Mercury Control
<br />Project, Mercer Generating Station, PSEG Fossil
<br />LLC, Hamilton Township, NJ, 10/2006 - Present.
<br />Design and construction of Mercury Control facilities (2
<br />units) at the Mercer Generating Station in Hamilton
<br />Township, NJ. Borings were completed by TRC and the
<br />laboratory testing was directed by l\[s. l\lcCo)'. Design
<br />of foundations, which \V.ill consist of concrete-filled pipe
<br />piles, \vill be directed by 1\[s. 1\ IcCoy.
<br />
<br />Lead Geotechnical Engineer, Chesterfield
<br />Emissions Enhancement, Dominion Energy,
<br />Chester, Virginia, 09/2005 - Present. Took m"er
<br />position as Lead Geotechnical Engineer. Designed l\vo
<br />sheetpiling retaining walls for limestone and gypsum
<br />storage as part of the flue gas desulfurization process.
<br />Performed geotechnical calculations of bearing capacit~.
<br />and settlement for large foundations. Assisted
<br />construction with exca,"ation and backfilling issues.
<br />Directed the preparation of design calculations,
<br />drawings, and specifications for drilled piers to be
<br />installed on a steep hill to support the flue gas ducts.
<br />
<br />Geotechnical Engineer, Wilson Hill Wildlife
<br />Management Area Improvements, St. Lawrence -
<br />FDR Power Project, New York Power Authority,
<br />Massena, NY (WHWMA and Nichols Island),
<br />07/2004 - Present. The WH\'\"l\L\ is an existing
<br />complex of earthen dikes which form se'"eral pools
<br />bel\veen the southern shoreline of Lake St. La\vrence,
<br />Wilson Hill, and Bradford Islands. The \'\'HWtvL-\
<br />includes approximately 1,800 acres of wetlands and open
<br />\vater habitats that are managed by the New York State
<br />Department of Environmental Conservation. NYr A is
<br />required to refurbish the dikes and existing water control
<br />structures, and to install one new dike and se,"eral new
<br />water control stnlctures. A subsurface investigation
<br />program was developed by 1\[s. 1\lcCoy in order to
<br />provide the data necessary to e\"aluate the condition of
<br />the existing dikes and foundation conditions for the new
<br />dike. The program consisted of borings, cone
<br />penetrometer testing, field falling head tests, field vane
<br />shear tests, and laboratory testing. Engineering analyses
<br />included slope stability, bearing capacity and settlement