<br />1 TITLE AND LOCATION cn and State
<br />Indian Point Peaking Power Project, Entergy Wholesale Operations,
<br />NY
<br />
<br />c. BRIEF DESCRIPTION Brief sco e, size. cost, etc. AND SPECIFIC ROLE
<br />As Task Manager, was responsible for the early engineering required to support final permitting of a two-unit simple cycled gas
<br />fired power plant. Responsibilities included site arrangements, one lines, water balances, and schedule development.
<br />
<br />Accomplishments: Supported client requirements in a cost effective and timely manner.
<br />
<br />1 TITLE AND LOCATION Ci and State
<br />Anderson, Kelley & Martin Station Combined Cycle Power Projects,
<br />Florida Power & Light, FPL Energy, Alabama, South Carolina, FL
<br />
<br />BRIEF DESCRIPTION Brief sco e, size, cost, etc. AND SPECIFIC ROLE
<br />Project Manager - Was responsible for the early engineering required in support of the final permitting and ultimately
<br />d. construction of these combined cycle power plants. The three plants all based on using GE frame 7F A technology include
<br />Anderson, a two on one (two combustions turbines each with a HRSG feeding one steam turbine) arrangement with a simple
<br />cycle temporary operation, Kelley, a 2-2 on 1 arrangement, and Martin, a 4 on 1 arrangement. Responsibilities included the
<br />specification and early purchase of long lead time equipment including the heat recovery steam generators (HRSGs),
<br />transformers, and cooling towers, site arrangements, one lines, water balances, schedule development, and cost development.
<br />
<br />Accomplishments: Supported client requirements in a cost effective and timely manner.
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />Devons Landfill Remediation Project, , US Army Corps of
<br />Engineers - New England District, MA
<br />
<br />BRIEF DESCRIPTION Brief sco e, size, cost, etc. AND SPECIFIC ROLE
<br />e. Project Manager - Was responsible for the remediation of six former disposal sites located at former Fort Devens including the
<br />removal of wastes from the six sites, analyzing the wastes, and landfilling the removed waste in an on-site landfill constructed
<br />under this task. Work completed under Mr. McCampbell's direction included development of the work plans, site safety and
<br />health plan, as well as other plans, specifying, bidding, and awarding major subcontracts for landfill construction, and landfill
<br />operation, partial construction of the landfill, and the start of remediation of the six former disposal sites. $24,000,000.00,
<br />