Laserfiche WebLink
<br />. <br /> <br />. <br /> <br /> <br /> <br />1 TITLE AND LOCATION cn and State <br />Indian Point Peaking Power Project, Entergy Wholesale Operations, <br />NY <br /> <br />c. BRIEF DESCRIPTION Brief sco e, size. cost, etc. AND SPECIFIC ROLE <br />As Task Manager, was responsible for the early engineering required to support final permitting of a two-unit simple cycled gas <br />fired power plant. Responsibilities included site arrangements, one lines, water balances, and schedule development. <br /> <br />Accomplishments: Supported client requirements in a cost effective and timely manner. <br /> <br />1 TITLE AND LOCATION Ci and State <br />Anderson, Kelley & Martin Station Combined Cycle Power Projects, <br />Florida Power & Light, FPL Energy, Alabama, South Carolina, FL <br /> <br />BRIEF DESCRIPTION Brief sco e, size, cost, etc. AND SPECIFIC ROLE <br />Project Manager - Was responsible for the early engineering required in support of the final permitting and ultimately <br />d. construction of these combined cycle power plants. The three plants all based on using GE frame 7F A technology include <br />Anderson, a two on one (two combustions turbines each with a HRSG feeding one steam turbine) arrangement with a simple <br />cycle temporary operation, Kelley, a 2-2 on 1 arrangement, and Martin, a 4 on 1 arrangement. Responsibilities included the <br />specification and early purchase of long lead time equipment including the heat recovery steam generators (HRSGs), <br />transformers, and cooling towers, site arrangements, one lines, water balances, schedule development, and cost development. <br /> <br />Accomplishments: Supported client requirements in a cost effective and timely manner. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Devons Landfill Remediation Project, , US Army Corps of <br />Engineers - New England District, MA <br /> <br />BRIEF DESCRIPTION Brief sco e, size, cost, etc. AND SPECIFIC ROLE <br />e. Project Manager - Was responsible for the remediation of six former disposal sites located at former Fort Devens including the <br />removal of wastes from the six sites, analyzing the wastes, and landfilling the removed waste in an on-site landfill constructed <br />under this task. Work completed under Mr. McCampbell's direction included development of the work plans, site safety and <br />health plan, as well as other plans, specifying, bidding, and awarding major subcontracts for landfill construction, and landfill <br />operation, partial construction of the landfill, and the start of remediation of the six former disposal sites. $24,000,000.00, <br /> <br />STANDARD FORM 330 (6/2004) E- <br /> <br /> <br />