Laserfiche WebLink
<br />e <br /> <br />-' <br /><( <br />'f) <br />a <br />0. <br />a <br />a:: <br />0. <br />'f) <br />I <br />>- <br />u. <br />a <br />w <br />'" <br /><( <br />0. <br />"j <br />>- <br />>= <br />W <br />I <br />>- <br />Z <br />a <br />z <br />a <br />>= <br />u <br />ii' <br />>- <br />'f) <br />w <br />a:: <br />w <br />I <br />f- <br />a <br />>- <br /> <br />ei <br /> <br />'f) <br />~ <br />>- <br />w <br />W <br />I <br />'f) <br />'f) <br />I <br />>- <br />z <br />a <br />o <br />w <br />z <br /><i' <br />>- <br />z <br />a <br />u <br /><( <br />f- <br /><( <br />o <br />u. <br />a <br />w <br />a:: <br />:::> <br />'f) <br />'3 <br />u <br />'f) <br />o <br />a:: <br />a <br />w <br />'f) <br />:::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Mr. Michopoulos has been assigned as a Lead Electrical <br />Engineer in the chillcd water plant upgradc for the U.S. <br />Department of State at the Consulate Office Building in <br />Brazil. He performcd a sitc sllLTey and prepared <br />specifications and dra\vings to support thc upgrade. <br /> <br />t-.lr. t-.lichopoulos co-de\"eloped infrastructure cluality <br />review criteria and rcview plans for use to assess AC, <br />DC, standby power, and security systcms reliability for a <br />major telecommunications company. He has performed <br />re\"iews of critical ccntral office network buildings and <br />has identified areas requiring impro\"ement to enhance <br />reliability. Also, has performed reliability assessments of <br />major data processing centcrs. <br /> <br />As Assistant Project t-.lanager, responsible for <br />coordinating preparation of design documents <br />(drawings, specifications, reports, ctc) for the Aberdecn <br />Chemical :\gent Disposal Facility. <br /> <br />He was also assigncd as Lcad Sccurity Engincer on a <br />security survey \'alidation and upgrade for :\nchoragc <br />t-.lunicipal Light and Power. <br /> <br />He has preparcd descriptions of task and electrical scopc <br />estimates for a \"aricty of industrial, commercial, pulp <br />and papcr, and utility projects. <br /> <br />t-.lr. t-.lichopoulos \vas \vith Chas. T. t-.lain, lne. from <br />1974 until 1981. He was assigned as a lcad electrical <br />engineer ill\"oked in all phascs of cngineering through <br />construction of industrial, pulp and papcr, and <br />commercial projects including system studies and dcsign, <br />equipment specification and procurement, capital cost <br />estimation, and manpowcr projection and selcction. <br /> <br />Relevant Experience <br />1981 - Present, Shaw Environmental & <br />Infrastructure, Inc. <br />/\s Deputy Project t-.lanager on a major transit project <br />that will provide underground and surface trackless <br />trolley service from downtown Boston to the South <br />Boston Piers area, he directed construction phasc <br />services for the systemwide elements (signals, <br />communications, traction power, catenary, tunnel <br />lighting, and emergency tunnel ventilation. <br /> <br />Tren Urbano, Section 1, Interface Design <br />Coordinator, Public Transit System OAN 1998 to <br /> <br />I SHAW ENVIRONMENTAL, INC. <br /> <br />06C122006T <br /> <br />OCTOBER 2004). As Design lntcrface Coordinator, <br />rcsponsible for coordinating all design acti\"ity between <br />the Alignment Section 1 contractor and the Systems <br />contractor of the Trcn Urbano Public Transit S\'stem in <br />San .J uan, Puerto Rico. <br /> <br />Tren Urbano, Section 4, 5, 6, Corrosion Control, <br />Public Transit System (MAY 1998 to OCTOBER <br />2004). ,\s Support Engineer, responsible for corrosion <br />control dcsign support acti\"ity for the Alignment <br />Sections 4,5,6 contractor of the Tren Urbano Public <br />Transit System in San Juan, Pucrto Rico. <br /> <br />Tren Urbano, Alignment Section 1, Design, Public <br />Transit System (Nov 1996 to OCTOBER 2004). As <br />Lcad Electrical Engincer, responsiblc for elcctrical <br />design drawings, calculations, and specifications for <br />Alignment Scction I of thc Trcn Urbano Public Transit <br />Sys tem in San.J uan, Puerto Rico. <br /> <br />U.S. Army Program Manager for Chemical <br />Demilitarization (Apr 1996 to May 1998). As <br />Assistant Project Manager, rcsponsible for coordinating <br />preparation of design documents (drawings, <br />spccifications, reports, ete.) for the Aberdeen Chemical <br />,\gcnt Disposal Facilit:y. <br /> <br />Security Study (Nov 1996 to Jan 1997). 1\S Project <br />t-.lanager, responsiblc for SutTey, intetTie\v, report and <br />sccurity protcction recommendation guidelincs of the <br />Nctwork Operation Center for a Fortune SO <br />Telecommunications Company. <br /> <br />Data Center Reliability Study (Feb 1995 to June <br />1995). l\S Senior Consultant, responsible for sllLTey and <br />infrastructure reliability study for t\vo AT&T Data <br />Centers. <br /> <br />Security Planning (Feb 1994 to June 1995). As <br />Project t-.lanager, developed a national program of <br />facility security guidelines for a Fortune SO <br />Telecommunications Company. <br /> <br />Infrastructure Quality Review Ouly 1992 to Jan <br />1994). :\s Security Specialist, responsible for facility <br />security revicws and recommendations for a Fortunc SO <br />Telecommunications Company. <br /> <br />Security Access Control System Oan 1989 to Dee <br />1992), Logan International Airport. As Project <br /> <br />JOHN MICHOPOULOS 0 <br />