Laserfiche WebLink
<br />. <br /> <br />-' <br /><( <br />(/) <br />o <br />a. <br />o <br />'" <br />a. <br />(/) <br />I <br />>- <br />u. <br />o <br />w <br />'" <br /><( <br />a. <br />~ <br />>- <br />;:: <br />W <br />I <br />>- <br />Z <br />o <br />Z <br />o <br />;:: <br />'-' <br />ii' <br />>- <br />(/) <br />W <br />'" <br />W <br />I <br />>- <br />o <br />>- <br />.~ <br />(/) <br />~ <br />>- <br />W <br />W <br />I <br />(/) <br />(/) <br />I <br />>- <br />z <br />o <br />o <br />w <br />Z <br />:;;: <br />>- <br />z <br />o <br />'-' <br /><( <br />>- <br /><( <br />o <br />u. <br />o <br />w <br />'" <br />=> <br />(/) <br />g <br />'-' <br />(/) <br />is <br />'" <br />o <br />w <br />(/) <br />=> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />i\lanager/Engineer, responsible for slllTey, report, and <br />recommendations to Massport for the design, <br />implementation, and procurement specifications for a <br />fedcrally mandated security access control systcm. <br /> <br />Personal Rapid Transit System (Mar 1991 to Oct <br />1991), Regional Transit Authority. As Lead Security <br />Engineer, responsible for the security element of the <br />System Design and Safety, Security, and Failure <br />i\lanagement Report for the development of a Personal <br />Rapid Transit System in conjunction with Taxi 2000 <br />Corp. for the Regional Transit ,\uthority in Chicago. <br /> <br />Value Engineering Study (May 1992), Deer Island <br />Facility Information System (FIS). As a Value <br />Engineering Team i\Iember, responsible to perform a <br />Valuc Engineering study and preparc a report of the <br />Facility Information Systcm for the i\Iass \'(!atcr <br />Resources Authority's Deer Island Trcatment Plant. <br /> <br />Security Access Control System Oune 1990 to June <br />1991), Robert Mueller Municipal Airport. As Project <br />Engineer, responsible for survey, report and <br />recommendations to the City of ,\ustin for the design, <br />implemcntation, and procurcment specifications for a <br />CCTV and access control s\'stem. <br /> <br />Security Survey/Report (Aug 1988 to Dee 1988), <br />Anchorage Municipal Light & Power. As Lcad <br />Security Engineer, responsiblc for report of cxisting <br />conditions and recommcndations for security <br />imprm'ements at three facilities. <br /> <br />Security Upgrade (Aug 1987 to July 1988), Los <br />Angeles Department of Water & Power. As Lead <br />Electrical/Security Engineer, rcsponsiblc for sitc SlllTCY, <br />report recommendation for equipmcnt specification and <br />security system design for high voltage receiving Station <br />B in South Los Angeles. <br /> <br />Chilled Water Plant Upgrade Oan 1988), <br />Department of State, U.S. Consulate. ,\s Lead <br />Electrical Engineer, responsible for <br />specifications/ application of electrical equipment in <br />support of a chillcd watcr plant upgrade for a U.S. <br />Consulate in Brazil. <br /> <br />Security Upgrade (May 1988 to July 1988), United <br />States Information Agency. As Lead <br /> <br />SHAW ENVIRONMENTAL. INC. <br /> <br />06C122006T <br /> <br />Electrical/Security Engineer, responsible for plans of <br />security eCluipment for a USIS facility in Korea. <br /> <br />Security Upgrade (Apr 1986 to Jan 1987), <br />Department of State, U.S. Embassy. "\s Lead <br />Electrical/Security Engineer, responsible for <br />spccification/ application of security equipment <br />(microwave, CCTV, passive infrared, ultrasonic motion <br />detection, ete.) for four U.S. embassies abroad. <br /> <br />Security System (Sept 1986 to Aug 1987), American <br />Brands, Inc. As Support Engineer, responsible for <br />technical support to the project (feeder sizing, U.L. <br />listing requiremcnt study) for security equipment on a <br />corporate headquarters in Old Greenwich, Connecticut. <br />,\lso responsible for tracking all time charges and <br />de\'eloping all scope changes through completion of the <br />project. <br /> <br />Fossil Plant Life Extension Study (Apr 1986 to Aug <br />1986) Consolidated Edison Company of New York, <br />Inc. As Support Engineer, responsible for the re\.ie\v <br />and preparation of electrical eCluipment inspection <br />packages for the purpose of plant operating life <br />extensIon. <br /> <br />Malakoff Electric Generating Station - Units 1 and 2 <br />(Feb 1982 to Apr 1986), Houston Lighting & Power <br />Company. As Work Package Engineer, responsible for <br />the preparation of essential sen'ice-emergency diesel <br />systcm description and spccification of unit substations, <br />emcrgency diesel generator, cable trays, dry typc <br />transformers, panelboards, unintermptible power supply <br />(UPS), communication systcm, and interface with the <br />furnish and crcct precipitator, flue gas desulfurization <br />(FC D) scrubbcr, FG D wastc, lignite and limestonc <br />handling, bottom ash and fly ash contractors for thc <br />l'.vo-unit, 690 M\,(! lignite-fired plant in Henderson <br />County, Texas. <br /> <br />Sludge Dewatering Project (Nov 1984 to Jan 1985), <br />Statler Tissue. As Lead Electrical Engineer, <br />responsible for specification of cable, motor insert for <br />dri\'cn equipment, lighting panels and transformers and <br />general contractor installation specification for addition <br />of a sludge press for a tissue plant in Augusta, Mainc. <br /> <br />JOHN MICHOPOULOS <br /> <br />3 <br />