|
<br />.
<br />
<br />-'
<br /><(
<br />(J)
<br />o
<br />"-
<br />o
<br />0:
<br />"-
<br />(J)
<br />I
<br />>-
<br />u.
<br />o
<br />w
<br />"
<br /><(
<br />"-
<br />':J
<br />>-
<br />>=
<br />W
<br />I
<br />>-
<br />Z
<br />o
<br />Z
<br />o
<br />>=
<br />u
<br />ii'
<br />>-
<br />(J)
<br />W
<br />0:
<br />W
<br />I
<br />>-
<br />o
<br />>-
<br />
<br />.!
<br />
<br />(J)
<br />'!l
<br />>-
<br />w
<br />w
<br />I
<br />(J)
<br />(J)
<br />I
<br />>-
<br />z
<br />o
<br />o
<br />w
<br />z
<br />4'
<br />>-
<br />z
<br />o
<br />u
<br /><(
<br />>-
<br /><(
<br />o
<br />u.
<br />o
<br />W
<br />0:
<br />::>
<br />(J)
<br />g
<br />u
<br />(J)
<br />is
<br />0:
<br />o
<br />w
<br />(J)
<br />::>
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />Judson T Mitchell, P.G.
<br />
<br />Education
<br />
<br />Postgraduate Studies, Hydrogeology, \,\'cstern 1'.[ichigan
<br />Uni\'ersity, 1989
<br />
<br />Postgraduate Studies, Geology, Virginia Tech, 1973
<br />
<br />M.S., Geology, Virginia Tech, 1970
<br />
<br />B.A., Geology, Southern Illinois Univcrsity, 1967
<br />
<br />Registrations
<br />
<br />Professional Geologist: KY, TN
<br />
<br />Background Summary
<br />
<br />1\lr. i\utchell is the resource manager for the Sha\v E & I
<br />in Grcelwille, South Carolina. He coordinates the work
<br />for 10 professionals including engineers, geologists and
<br />support personnel. The position includcs hiring and
<br />training of personnel. 1'.[r. 1'.litchell also functions as
<br />Project i\Ianager, Task 1\lanager, and Lead
<br />Hydrogeologist for \'arious projccts. Hc is a
<br />Profcssional Geologist with over 25 ycars experience in
<br />geologic and hydrogcologic innstigations that includc
<br />DOD, DOE, Superfund, and RCIL\ sites from
<br />im'estigation to installation and startup, of grounchvater
<br />remedial systems. He has acted as remediation lead on a
<br />multi-plant due diligence site assessment for accjuisition
<br />that included potential environmental liabilities
<br />approaching S2001'.L He has coauthored publications
<br />relating to hydrogeologic tcsting and model
<br />development.
<br />
<br />Relevant Experience
<br />
<br />OS/2002 - Present, Technical Resource
<br />Manager, Shaw Environmental &
<br />Infrastructure, Inc.
<br />Project Manager, Former Pesticide Mixing Area
<br />RI/FS, 86644700, US Army Corps of Engineers,
<br />Fort Lee, VA, 07/2004. Prepared Work Plan for
<br />Supplemental Risk Assessment and Analytical Results
<br />Report Addendum using analytical data from the former
<br />fire station P A/Sf.
<br />
<br />I SHAW ENVIRONMENTAL, INC.
<br />
<br />06C122006T
<br />
<br />Senior Geologist, Reformatory Landfill Passive Gas
<br />Vent Landfill Installation, US Army Corps of
<br />Engineers, Fort Lee, VA, 04/2004. Provided
<br />e\'aluation of new and cxisting subsurface data to place
<br />6" Passi\'c Gas V cnt wells and horizontal trcnches in a
<br />40 acrc landfill.
<br />
<br />Task Manager, Redstone Arsenal, Huntsville, AL,
<br />04/2005. Provided coordination and access to public
<br />and printe land at a sensitive government facility for
<br />approximately 8 miles of seismic suC\'ey activities to
<br />determinc subsurface geology.
<br />
<br />Senior Geologist/Hydrogeologist, Triple S Inc. Site
<br />30-3, 100848, Kerr-McGee, Felda, FL, 08/2003 -
<br />Present. Field surny of brine spill arca including slug
<br />tests on 18 wells ranging in depth from 95 to 165 feet.
<br />Recommended time-domain electromagnetic study and
<br />thin-layer analysis to delineate subsurface chloride
<br />contamination. Prepared \vork plan for installation of
<br />ITcO\"Cry \vells and detailed lithologic anal~'sis of soils
<br />using rotosonic methodologics.
<br />
<br />Senior Geologist/Hydrogeologist, Northeast
<br />Chemical Site, Reiss Remediation Inc./Koch,
<br />Wilmington, NC, OS/2002 - 2004. Prepared detailed
<br />geologic interpretation of SO acre plant site near the
<br />Cape Fear Rivcr. Principal groundwater contamination
<br />consisted of lead, arsenic, and pH values of Icss than l.
<br />Dcfined historic embayments subsequently filled with
<br />waste clinkcr matcrial and other fill. The information
<br />\vas used to cluantify interim removal actions and future
<br />site remcdiation activities and developed sitc conceptual
<br />model.
<br />
<br />Senior Geologist/Hydrogeologist, Charleston
<br />DESC/DFSP, North Charleston, SC, OS/2002-
<br />Present. Provided senior review and technical oversight
<br />to remedial activitics at the DFSP and the Defense Fuel
<br />Supply Pipeline. Directed investigation to define
<br />subsurface contamination and subsequent installation of
<br />7 dual phase extraction wells.
<br />
<br />JUDSON T MITCHELL Q
<br />
|