Laserfiche WebLink
<br />. <br /> <br />-' <br /><( <br />(J) <br />o <br />"- <br />o <br />0: <br />"- <br />(J) <br />I <br />>- <br />u. <br />o <br />w <br />" <br /><( <br />"- <br />':J <br />>- <br />>= <br />W <br />I <br />>- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />ii' <br />>- <br />(J) <br />W <br />0: <br />W <br />I <br />>- <br />o <br />>- <br /> <br />.! <br /> <br />(J) <br />'!l <br />>- <br />w <br />w <br />I <br />(J) <br />(J) <br />I <br />>- <br />z <br />o <br />o <br />w <br />z <br />4' <br />>- <br />z <br />o <br />u <br /><( <br />>- <br /><( <br />o <br />u. <br />o <br />W <br />0: <br />::> <br />(J) <br />g <br />u <br />(J) <br />is <br />0: <br />o <br />w <br />(J) <br />::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Judson T Mitchell, P.G. <br /> <br />Education <br /> <br />Postgraduate Studies, Hydrogeology, \,\'cstern 1'.[ichigan <br />Uni\'ersity, 1989 <br /> <br />Postgraduate Studies, Geology, Virginia Tech, 1973 <br /> <br />M.S., Geology, Virginia Tech, 1970 <br /> <br />B.A., Geology, Southern Illinois Univcrsity, 1967 <br /> <br />Registrations <br /> <br />Professional Geologist: KY, TN <br /> <br />Background Summary <br /> <br />1\lr. i\utchell is the resource manager for the Sha\v E & I <br />in Grcelwille, South Carolina. He coordinates the work <br />for 10 professionals including engineers, geologists and <br />support personnel. The position includcs hiring and <br />training of personnel. 1'.[r. 1'.litchell also functions as <br />Project i\Ianager, Task 1\lanager, and Lead <br />Hydrogeologist for \'arious projccts. Hc is a <br />Profcssional Geologist with over 25 ycars experience in <br />geologic and hydrogcologic innstigations that includc <br />DOD, DOE, Superfund, and RCIL\ sites from <br />im'estigation to installation and startup, of grounchvater <br />remedial systems. He has acted as remediation lead on a <br />multi-plant due diligence site assessment for accjuisition <br />that included potential environmental liabilities <br />approaching S2001'.L He has coauthored publications <br />relating to hydrogeologic tcsting and model <br />development. <br /> <br />Relevant Experience <br /> <br />OS/2002 - Present, Technical Resource <br />Manager, Shaw Environmental & <br />Infrastructure, Inc. <br />Project Manager, Former Pesticide Mixing Area <br />RI/FS, 86644700, US Army Corps of Engineers, <br />Fort Lee, VA, 07/2004. Prepared Work Plan for <br />Supplemental Risk Assessment and Analytical Results <br />Report Addendum using analytical data from the former <br />fire station P A/Sf. <br /> <br />I SHAW ENVIRONMENTAL, INC. <br /> <br />06C122006T <br /> <br />Senior Geologist, Reformatory Landfill Passive Gas <br />Vent Landfill Installation, US Army Corps of <br />Engineers, Fort Lee, VA, 04/2004. Provided <br />e\'aluation of new and cxisting subsurface data to place <br />6" Passi\'c Gas V cnt wells and horizontal trcnches in a <br />40 acrc landfill. <br /> <br />Task Manager, Redstone Arsenal, Huntsville, AL, <br />04/2005. Provided coordination and access to public <br />and printe land at a sensitive government facility for <br />approximately 8 miles of seismic suC\'ey activities to <br />determinc subsurface geology. <br /> <br />Senior Geologist/Hydrogeologist, Triple S Inc. Site <br />30-3, 100848, Kerr-McGee, Felda, FL, 08/2003 - <br />Present. Field surny of brine spill arca including slug <br />tests on 18 wells ranging in depth from 95 to 165 feet. <br />Recommended time-domain electromagnetic study and <br />thin-layer analysis to delineate subsurface chloride <br />contamination. Prepared \vork plan for installation of <br />ITcO\"Cry \vells and detailed lithologic anal~'sis of soils <br />using rotosonic methodologics. <br /> <br />Senior Geologist/Hydrogeologist, Northeast <br />Chemical Site, Reiss Remediation Inc./Koch, <br />Wilmington, NC, OS/2002 - 2004. Prepared detailed <br />geologic interpretation of SO acre plant site near the <br />Cape Fear Rivcr. Principal groundwater contamination <br />consisted of lead, arsenic, and pH values of Icss than l. <br />Dcfined historic embayments subsequently filled with <br />waste clinkcr matcrial and other fill. The information <br />\vas used to cluantify interim removal actions and future <br />site remcdiation activities and developed sitc conceptual <br />model. <br /> <br />Senior Geologist/Hydrogeologist, Charleston <br />DESC/DFSP, North Charleston, SC, OS/2002- <br />Present. Provided senior review and technical oversight <br />to remedial activitics at the DFSP and the Defense Fuel <br />Supply Pipeline. Directed investigation to define <br />subsurface contamination and subsequent installation of <br />7 dual phase extraction wells. <br /> <br />JUDSON T MITCHELL Q <br />