|
<br />.
<br />
<br />-'
<br /><(
<br />(/)
<br />a
<br />a.
<br />a
<br />a:
<br />a.
<br /><!2
<br />I
<br />>-
<br />u.
<br />a
<br />w
<br /><:>
<br /><(
<br />a.
<br />~
<br />>-
<br />0=
<br />w
<br />I
<br />>-
<br />Z
<br />a
<br />z
<br />a
<br />0=
<br />u
<br />c;:
<br />>-
<br />(/)
<br />w
<br />a:
<br />w
<br />I
<br />>-
<br />a
<br />>-
<br />
<br />.~
<br />(/)
<br /><!2
<br />>-
<br />w
<br />w
<br />I
<br />(/)
<br />(/)
<br />I
<br />>-
<br />z
<br />a
<br />o
<br />w
<br />z
<br /><i
<br />>-
<br />z
<br />a
<br />u
<br /><(
<br />>-
<br /><(
<br />o
<br />u.
<br />a
<br />w
<br />a:
<br />::>
<br />(/)
<br />'3
<br />u
<br />(/)
<br />o
<br />a:
<br />a
<br />w
<br />(/)
<br />::>
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />Senior Geologist/Hydrogeologist, Elmore, Black &
<br />Veach, Greer, SC, 04/2002 - Present. Performed
<br />project o\'ersight for air-rotary well installation, geologic
<br />interpretation, and rcmcdiation activitics of solvent
<br />contaminated site in fracturcd bedrock O\'erlain by
<br />\veathered bedrock. Interpreted slug tcsts and pump
<br />tests wells at various depths including bedrock.
<br />
<br />Senior Geologist/Hydrogeologist, Yorktown Navy
<br />Fuel Depot, LANTDIV DESC, Yorktown, VA,
<br />12/2002 - 06/2003. Developed a site conceptual model
<br />based on boring log, site historical information, and
<br />aquifcr tests. Supported thc dc\'elopmcnt of a 3-
<br />dimensional model to simulate a coupled fluid and heat
<br />transport model based on the PORFLOW software.
<br />]\[odel included effects of tcmperature on viscosity of
<br />NSFO. Developed capture zones and effect of steam
<br />lines and hot water injection in support of the Phase 2
<br />system design.
<br />
<br />Project Manager, Former Fire Station Site (FS Site),
<br />US Army Corps of Engineers, Fort Lee, VA, OS/2002
<br />- 06/2003. Field supeLyisor for US,-\CE PA/S!.
<br />Prcpared P A/Sl field sampling plan for a fonner fire
<br />station using rcal-time, onsite laboratory to delincatc
<br />\TOC groundwater contamination using profilcd
<br />geoprobe sampling. Defined lateral and vertical extent
<br />of \TOC contamination. Completed P A/Sl report that
<br />was us cd to obtain agreement with State and Army
<br />representatives to combine both sitcs minimizing
<br />numbcr of functional sitcs at Fort Lce.
<br />
<br />11/1998 - OS/2002 Senior
<br />GeologisUHydrogeologist and Technical
<br />Services Manager, Shaw Environmental
<br />& Infrastructure, Inc.
<br />]\[r. Mitchell functioned as Project ]\[anager, Task
<br />Manager, and Lead Hydrogeologist for various projects.
<br />During this time he assumed the responsibility as
<br />Technical Services ]\[anager for Greenville, S.c.,
<br />coordinating the work for a staff of 17 professionals
<br />consisting of engineers, geologists and other support
<br />personnel. The position included hiring and training of
<br />personnel.
<br />
<br />Senior Geologist/Hydrogeologist, Charleston
<br />DESC, DESC, North Charleston, SC, 01/2000-
<br />OS/2002 Trained Lead geologist to install monitoring
<br />and dual-phase remediation wclls. Provided tcchnical
<br />oversight and senior rcview to the remedial activitics at
<br />the Defense Fuel Supply Point and the Defense Fuel
<br />Supply Pipeline.
<br />
<br />Senior Geologist/Hydrogeologist, Charleston AFB,
<br />Air force Center for Environmental Excellence
<br />(AFCEE), North Charleston, SC, 02/2001 - 06/2001
<br />Provided guidance and field support to install two air
<br />spargc systems in coastal plain scdiments contaminatcd
<br />with volatile organics. Defined geologic setting and
<br />provided insight for remedial system modification.
<br />Installed monitoring wells and air sparge \vells.
<br />
<br />Project Manager, Former Pesticide Mixing Area
<br />(PM Site), US Army Corps of Engineers, Fort Lee,
<br />VA, 07/1998 - 07/2000 Conducted field operations for
<br />Phasc II I of RI/ FS iLwestigation of Former Pesticide
<br />]\[ixing [\rea. Prepared RI/FS report for site that
<br />included initiall\VO phases. Demonstratcd that
<br />groundwater \TOC contamination was not a result of
<br />\>]\[ Site acti\'ities rcsulting in future im'estigati\'e acti\'es
<br />upgradient from site.
<br />
<br />06/1996 - 11/1998 Senior
<br />GeologisUHydrogeologist, Fluor Daniel
<br />GTI, Greenville, SC
<br />Senior Geologist/Hydrogeologist, Due Diligence -
<br />Confidential Client, Confidential, 5 Sites in North
<br />Carolina and SC, 04/1998 - 08/1998. Technicallcad
<br />for field ilwestigations for Due Diligence assessment for
<br />actluisition of 5 US Plants. Remediation Lead for site
<br />visits and site managcr for field investigations to assess
<br />past and current environmental contlitions at threc
<br />major facilities. Two facilities were listcd CERCL\ sitcs.
<br />Provided tcchnical review of final report ilwolving
<br />multiplc US, European, and ]\[exico sites.
<br />
<br />Senior Geologist/Hydrogeologist, Schlumberger-
<br />Pickens, Schlumberger, Pickens, SC, 11/1995 -
<br />02/1998. Prcparcd plan for statistical sampling of
<br />excavation areas for PCB contamination and evaluation
<br />of remaining structures. Sampling plan included
<br />hydrogeologic interpretation of area designated for
<br />groundwater recovery after excavation. Provided
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />JUDSON T MITCHELL 2
<br />
<br />06C122006T
<br />
|