Laserfiche WebLink
<br />. <br /> <br />-' <br /><( <br />(/) <br />a <br />a. <br />a <br />a: <br />a. <br /><!2 <br />I <br />>- <br />u. <br />a <br />w <br /><:> <br /><( <br />a. <br />~ <br />>- <br />0= <br />w <br />I <br />>- <br />Z <br />a <br />z <br />a <br />0= <br />u <br />c;: <br />>- <br />(/) <br />w <br />a: <br />w <br />I <br />>- <br />a <br />>- <br /> <br />.~ <br />(/) <br /><!2 <br />>- <br />w <br />w <br />I <br />(/) <br />(/) <br />I <br />>- <br />z <br />a <br />o <br />w <br />z <br /><i <br />>- <br />z <br />a <br />u <br /><( <br />>- <br /><( <br />o <br />u. <br />a <br />w <br />a: <br />::> <br />(/) <br />'3 <br />u <br />(/) <br />o <br />a: <br />a <br />w <br />(/) <br />::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Senior Geologist/Hydrogeologist, Elmore, Black & <br />Veach, Greer, SC, 04/2002 - Present. Performed <br />project o\'ersight for air-rotary well installation, geologic <br />interpretation, and rcmcdiation activitics of solvent <br />contaminated site in fracturcd bedrock O\'erlain by <br />\veathered bedrock. Interpreted slug tcsts and pump <br />tests wells at various depths including bedrock. <br /> <br />Senior Geologist/Hydrogeologist, Yorktown Navy <br />Fuel Depot, LANTDIV DESC, Yorktown, VA, <br />12/2002 - 06/2003. Developed a site conceptual model <br />based on boring log, site historical information, and <br />aquifcr tests. Supported thc dc\'elopmcnt of a 3- <br />dimensional model to simulate a coupled fluid and heat <br />transport model based on the PORFLOW software. <br />]\[odel included effects of tcmperature on viscosity of <br />NSFO. Developed capture zones and effect of steam <br />lines and hot water injection in support of the Phase 2 <br />system design. <br /> <br />Project Manager, Former Fire Station Site (FS Site), <br />US Army Corps of Engineers, Fort Lee, VA, OS/2002 <br />- 06/2003. Field supeLyisor for US,-\CE PA/S!. <br />Prcpared P A/Sl field sampling plan for a fonner fire <br />station using rcal-time, onsite laboratory to delincatc <br />\TOC groundwater contamination using profilcd <br />geoprobe sampling. Defined lateral and vertical extent <br />of \TOC contamination. Completed P A/Sl report that <br />was us cd to obtain agreement with State and Army <br />representatives to combine both sitcs minimizing <br />numbcr of functional sitcs at Fort Lce. <br /> <br />11/1998 - OS/2002 Senior <br />GeologisUHydrogeologist and Technical <br />Services Manager, Shaw Environmental <br />& Infrastructure, Inc. <br />]\[r. Mitchell functioned as Project ]\[anager, Task <br />Manager, and Lead Hydrogeologist for various projects. <br />During this time he assumed the responsibility as <br />Technical Services ]\[anager for Greenville, S.c., <br />coordinating the work for a staff of 17 professionals <br />consisting of engineers, geologists and other support <br />personnel. The position included hiring and training of <br />personnel. <br /> <br />Senior Geologist/Hydrogeologist, Charleston <br />DESC, DESC, North Charleston, SC, 01/2000- <br />OS/2002 Trained Lead geologist to install monitoring <br />and dual-phase remediation wclls. Provided tcchnical <br />oversight and senior rcview to the remedial activitics at <br />the Defense Fuel Supply Point and the Defense Fuel <br />Supply Pipeline. <br /> <br />Senior Geologist/Hydrogeologist, Charleston AFB, <br />Air force Center for Environmental Excellence <br />(AFCEE), North Charleston, SC, 02/2001 - 06/2001 <br />Provided guidance and field support to install two air <br />spargc systems in coastal plain scdiments contaminatcd <br />with volatile organics. Defined geologic setting and <br />provided insight for remedial system modification. <br />Installed monitoring wells and air sparge \vells. <br /> <br />Project Manager, Former Pesticide Mixing Area <br />(PM Site), US Army Corps of Engineers, Fort Lee, <br />VA, 07/1998 - 07/2000 Conducted field operations for <br />Phasc II I of RI/ FS iLwestigation of Former Pesticide <br />]\[ixing [\rea. Prepared RI/FS report for site that <br />included initiall\VO phases. Demonstratcd that <br />groundwater \TOC contamination was not a result of <br />\>]\[ Site acti\'ities rcsulting in future im'estigati\'e acti\'es <br />upgradient from site. <br /> <br />06/1996 - 11/1998 Senior <br />GeologisUHydrogeologist, Fluor Daniel <br />GTI, Greenville, SC <br />Senior Geologist/Hydrogeologist, Due Diligence - <br />Confidential Client, Confidential, 5 Sites in North <br />Carolina and SC, 04/1998 - 08/1998. Technicallcad <br />for field ilwestigations for Due Diligence assessment for <br />actluisition of 5 US Plants. Remediation Lead for site <br />visits and site managcr for field investigations to assess <br />past and current environmental contlitions at threc <br />major facilities. Two facilities were listcd CERCL\ sitcs. <br />Provided tcchnical review of final report ilwolving <br />multiplc US, European, and ]\[exico sites. <br /> <br />Senior Geologist/Hydrogeologist, Schlumberger- <br />Pickens, Schlumberger, Pickens, SC, 11/1995 - <br />02/1998. Prcparcd plan for statistical sampling of <br />excavation areas for PCB contamination and evaluation <br />of remaining structures. Sampling plan included <br />hydrogeologic interpretation of area designated for <br />groundwater recovery after excavation. Provided <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />JUDSON T MITCHELL 2 <br /> <br />06C122006T <br />