|
<br />e
<br />
<br />--'
<br /><{
<br />If)
<br />o
<br />"'-
<br />o
<br />""
<br />"'-
<br />If)
<br />I
<br />f-
<br />"'-
<br />o
<br />UJ
<br />"
<br /><{
<br />"'-
<br />~
<br />f-
<br />>=
<br />UJ
<br />I
<br />f-
<br />Z
<br />o
<br />Z
<br />o
<br />>=
<br />u
<br />a::
<br />f-
<br />If)
<br />UJ
<br />""
<br />UJ
<br />I
<br />f-
<br />o
<br />f-
<br />
<br />ei
<br />
<br />If)
<br />'!l
<br />f-
<br />UJ
<br />UJ
<br />I
<br />If)
<br />If)
<br />I
<br />f-
<br />Z
<br />o
<br />o
<br />UJ
<br />z
<br />4'
<br />f-
<br />Z
<br />o
<br />u
<br /><{
<br />f-
<br /><{
<br />o
<br />"'-
<br />o
<br />UJ
<br />""
<br />::::>
<br />If)
<br />g
<br />u
<br />If)
<br />Ci
<br />""
<br />o
<br />UJ
<br />If)
<br />::::>
<br />
<br />e
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />technical oversight for site confirmation sampling and
<br />statistical analysis using random/stratified sampling
<br />techniques to demonstrate clean. Prepared multiple site
<br />closure reports and Final Constmction Report.
<br />
<br />Senior Hydrogeologist, GE Rome Georgia, GE,
<br />Rome, GA, 01/1997 - 09/1997. Prepared final
<br />Corrective Action Plan and field test report for system
<br />pilot evaluation of dual phase soil gas extraction system
<br />to treat a 3 acre landfill contaminated with PCBs and
<br />other organics. The system included nested pairs of
<br />recovery wells with a steam injection option. The site
<br />was situated in a Karst geologic region.
<br />
<br />Senior Geologist/Hydrogeologist, Letterkenny
<br />Army Base, USAEC, ATEPS, Letterkenny Army
<br />Base, PA, 06/1996 - 05/1997. RI Report ~Ianager for
<br />SE OU 5 RI report management, data evaluation,
<br />geologic interpretation, determination of nature and
<br />extent of contamination, QA/ QC of fidd data, and
<br />coordinate preparation of report. Prm'ided senior
<br />technical re\"iew of OU 6 RI report for off-post
<br />Groundwater in an area of partially developed karst
<br />terrain, and OU 7 RI.
<br />
<br />Senior Geologist/Hydrogeologist, Sears
<br />(Crestwood) Birmingham, Sears, Birmingham, AL,
<br />07/1996 - 10/1996. Prepared design review and cost
<br />estimates for dual phase extraction system for BTEX
<br />recm'ery from two converging contaminant sites.
<br />Re\'ised design when state removed requirement to treat
<br />both sites. Supported coordination of accelerated
<br />installation and startup. On site for final system
<br />assembly, shakedown, and startup.
<br />
<br />07/1991 - 06/1996 Senior
<br />Geologist/Hydrogeologist, Fluor Daniel
<br />Environmental Inc., Greenville, SC
<br />Senior Hydrogeologist, Fort Lee, US Army Corps of
<br />Engineers, Fort Lee, VA, 10/1993 -11/1995. Senior
<br />Hydrogeologist, USACE, Baltimore District, Ft. Lee
<br />Virginia: Provided technical oversight and review for
<br />reports. Prepared three separate site characterization
<br />reports summarizing completed work and
<br />recommending follow-up field investigation activities.
<br />Prepared statistical sampling and analysis plan for
<br />drainage way contaminated with pesticides.
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />OGC122006T
<br />
<br />Senior Geologist/Hydrogeologist and Project
<br />Manager, Big D, Olin Chemicals, Kingsville, OH,
<br />07/1991 - 06/1995. Directed multi phase site remedial
<br />investigation of a 7 acre CERCL\ landfill containing
<br />15,000 dmms and 60,000 cubic yards of hazardous
<br />waste. Contamination plume had traveled 2100 feet
<br />covering 60 acres. Prepared all work plans and reports.
<br />Used ~IODFLOW to design and test a groundwater
<br />remediation system of 10 extraction wells, an injection
<br />trench and an interceptor trench. Supervised installation
<br />of total system and, startup of extraction system. Saved
<br />the client over $1 million dollars in installation costs
<br />using a proactive approach.
<br />
<br />Senior Geologist/Hydrogeologist, Fernald, DOE
<br />Fernald, Ohio, Ross, OH, 06/1993 - 12/1994.
<br />i\nalyzed and prepared analytical and geologic data for
<br />presentation as an RI report for various mixed waste
<br />units. Soils contamination and groundwater were
<br />separated by glacial till and upper unsaturated zone of a
<br />major aCjuifer. Located contaminant discharge to the
<br />aquifer controlled by buried, tmncated areas of eroded
<br />glacial till. \,\'rote segments of RI report and provided
<br />technical revie\\:. Performed QA/QC m'Crsight for site
<br />il1\"Cstigation to locate a 1m\: le\'el waste cdl. Re\'iscd the
<br />site investigation to finalize disposal cell location and
<br />complete the design.
<br />
<br />JUDSON T MITCHEll 3
<br />
|