Laserfiche WebLink
<br />e <br /> <br />--' <br /><{ <br />If) <br />o <br />"'- <br />o <br />"" <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />" <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br />f- <br />o <br />f- <br /> <br />ei <br /> <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />technical oversight for site confirmation sampling and <br />statistical analysis using random/stratified sampling <br />techniques to demonstrate clean. Prepared multiple site <br />closure reports and Final Constmction Report. <br /> <br />Senior Hydrogeologist, GE Rome Georgia, GE, <br />Rome, GA, 01/1997 - 09/1997. Prepared final <br />Corrective Action Plan and field test report for system <br />pilot evaluation of dual phase soil gas extraction system <br />to treat a 3 acre landfill contaminated with PCBs and <br />other organics. The system included nested pairs of <br />recovery wells with a steam injection option. The site <br />was situated in a Karst geologic region. <br /> <br />Senior Geologist/Hydrogeologist, Letterkenny <br />Army Base, USAEC, ATEPS, Letterkenny Army <br />Base, PA, 06/1996 - 05/1997. RI Report ~Ianager for <br />SE OU 5 RI report management, data evaluation, <br />geologic interpretation, determination of nature and <br />extent of contamination, QA/ QC of fidd data, and <br />coordinate preparation of report. Prm'ided senior <br />technical re\"iew of OU 6 RI report for off-post <br />Groundwater in an area of partially developed karst <br />terrain, and OU 7 RI. <br /> <br />Senior Geologist/Hydrogeologist, Sears <br />(Crestwood) Birmingham, Sears, Birmingham, AL, <br />07/1996 - 10/1996. Prepared design review and cost <br />estimates for dual phase extraction system for BTEX <br />recm'ery from two converging contaminant sites. <br />Re\'ised design when state removed requirement to treat <br />both sites. Supported coordination of accelerated <br />installation and startup. On site for final system <br />assembly, shakedown, and startup. <br /> <br />07/1991 - 06/1996 Senior <br />Geologist/Hydrogeologist, Fluor Daniel <br />Environmental Inc., Greenville, SC <br />Senior Hydrogeologist, Fort Lee, US Army Corps of <br />Engineers, Fort Lee, VA, 10/1993 -11/1995. Senior <br />Hydrogeologist, USACE, Baltimore District, Ft. Lee <br />Virginia: Provided technical oversight and review for <br />reports. Prepared three separate site characterization <br />reports summarizing completed work and <br />recommending follow-up field investigation activities. <br />Prepared statistical sampling and analysis plan for <br />drainage way contaminated with pesticides. <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />OGC122006T <br /> <br />Senior Geologist/Hydrogeologist and Project <br />Manager, Big D, Olin Chemicals, Kingsville, OH, <br />07/1991 - 06/1995. Directed multi phase site remedial <br />investigation of a 7 acre CERCL\ landfill containing <br />15,000 dmms and 60,000 cubic yards of hazardous <br />waste. Contamination plume had traveled 2100 feet <br />covering 60 acres. Prepared all work plans and reports. <br />Used ~IODFLOW to design and test a groundwater <br />remediation system of 10 extraction wells, an injection <br />trench and an interceptor trench. Supervised installation <br />of total system and, startup of extraction system. Saved <br />the client over $1 million dollars in installation costs <br />using a proactive approach. <br /> <br />Senior Geologist/Hydrogeologist, Fernald, DOE <br />Fernald, Ohio, Ross, OH, 06/1993 - 12/1994. <br />i\nalyzed and prepared analytical and geologic data for <br />presentation as an RI report for various mixed waste <br />units. Soils contamination and groundwater were <br />separated by glacial till and upper unsaturated zone of a <br />major aCjuifer. Located contaminant discharge to the <br />aquifer controlled by buried, tmncated areas of eroded <br />glacial till. \,\'rote segments of RI report and provided <br />technical revie\\:. Performed QA/QC m'Crsight for site <br />il1\"Cstigation to locate a 1m\: le\'el waste cdl. Re\'iscd the <br />site investigation to finalize disposal cell location and <br />complete the design. <br /> <br />JUDSON T MITCHEll 3 <br />