|
<br />.
<br />
<br />--'
<br /><{
<br />If)
<br />o
<br />"'-
<br />o
<br />0::
<br />"'-
<br />If)
<br />I
<br />f-
<br />"'-
<br />o
<br />UJ
<br />"
<br /><{
<br />"'-
<br />~
<br />f-
<br />>=
<br />UJ
<br />I
<br />f-
<br />Z
<br />o
<br />Z
<br />o
<br />>=
<br />u
<br />a::
<br />f-
<br />If)
<br />UJ
<br />""
<br />UJ
<br />I
<br />
<br />.~
<br />~
<br />CD
<br />::::>
<br />If)
<br />'!l
<br />f-
<br />UJ
<br />UJ
<br />I
<br />If)
<br />If)
<br />I
<br />f-
<br />Z
<br />o
<br />o
<br />UJ
<br />z
<br />4'
<br />f-
<br />Z
<br />o
<br />u
<br /><{
<br />f-
<br /><{
<br />o
<br />"'-
<br />o
<br />UJ
<br />""
<br />::::>
<br />If)
<br />g
<br />u
<br />If)
<br />Ci
<br />""
<br />o
<br />UJ
<br />If)
<br />::::>
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />William J. Palmieri
<br />
<br />Education
<br />B.S., Ci\'il Engineering, Northeastern University, 1965
<br />
<br />Registrations
<br />Professional Engineer: (Structural), MA
<br />
<br />Background Summary
<br />
<br />l\Ir. Palmieri is a civil engineer registered as a
<br />professional structural engineer, with more than 40 years
<br />of ci\'il/ structural and multi-disciplined experience. His
<br />experience includes preparation of proposals and
<br />presentations, contract negotiations, project
<br />management and administration, including scope
<br />development, schedule and budget control, quality
<br />assurance and technical reviews, planning, feasibility
<br />studies, site selection studies, report preparation,
<br />building evaluation, engineering, design supen'ision,
<br />specification preparation, cost estimating, scheduling,
<br />bid analysis, and construction administration. Projects
<br />include site selection; site development; new and existing
<br />roadway improvement programs; engineering/ design of
<br />new and assessment/ rehabilitation of existing bridges
<br />for local and interstate roadways/higll\vays and railroads;
<br />storm\vater drainage and flood control; municipal and
<br />industrial water supply, storage, and distribution
<br />facilities; sanitary sewerage/wastewater collection and
<br />treatment facilities; vehicle maintenance facilities;
<br />railway, public transit and inter-modal transportation
<br />facilities; new and rehabilitated structured and surface
<br />parking facilities; commercial and educational facilities;
<br />central boiler plants and utility distribution systems. I-Ie
<br />has performed structural damage assessments and served
<br />as an expert witness in construction arbitration
<br />proceedings. He also sen'ed as a member of a Board of
<br />Public Works responsible for planning and
<br />implementation of capital improvements, overseeing
<br />budgets, operation and maintenance of water and sewer
<br />systems, wastewater treatment system, sanitary landfill,
<br />municipal roadways, storm drainage systems, vehicle
<br />maintenance, cemetery and public lands, including
<br />oceanfront facilities.
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />OGC122006T
<br />
<br />Relevant Experience
<br />1996 - Present, Senior Project Manager,
<br />Shaw Environmental & Infrastructure, Inc.
<br />Preparation of proposals, including teaming agreements,
<br />project understanding, scope of work, managing
<br />technical approach, le\'el of effort, cost proposals, and
<br />contract negotiations.
<br />
<br />American-Eagle Communities, LLC (for
<br />USAFCEE) - Privatization of Military Housing,
<br />Hanscom Air Force Base, Lincoln, MA. Design and
<br />construction of site and utility infrastructure
<br />imprO\'ements for existing military housing on an
<br />approximately 181-acre site, to support phased
<br />construction of 850 existing housing units by 784 new
<br />units, with a minimum of 607 units anilable at all times
<br />during construction. [\ new communi~' center, 3
<br />neighborhood centers and a maintenance facili~' are also
<br />included. Public access and utility sen'ices including
<br />domestic and fire protection water, sanitary sewerage,
<br />natural gas seLyice, electric power, communications and
<br />cable sen'ices must be maintained at all times during the
<br />phased construction. The project includes ne\v roads,
<br />imprm'ements to existing roads, crossing wetlands,
<br />regrading the site, and storm drainage impro\'ements
<br />using Bt\IP's to reduce peak flows to below pre-
<br />construction le\'Cls.
<br />
<br />USDOT /FTA - PMO for Dallas Area Rapid Transit
<br />LRT System Expansion, Dallas, TX. DART
<br />program for expansion of the light rail transit system
<br />involves extension of current LRT facilities and sen'ices
<br />to the Northeast and the Southwest. Assisted in risk
<br />assessment/mitigation and technical review of station
<br />design, plans, specifications and estimates for sixteen at-
<br />grade and aerial light rail stations included within six
<br />section contracts for the project.
<br />
<br />USDOT /FTA - PMO for Port Authority Allegheny
<br />County (PAAC) Project, Pittsburgh, PA. North
<br />Shore LRT Connector project invokes extension of
<br />current LRT facilities to connect between the Golden
<br />Triangle and the North Shore of Pittsburgh. Assisted in
<br />risk assessment/ mitigation and technical review of
<br />station design, plans, specifications and estimates for
<br />nine contracts related to station shell and finishes for the
<br />North Shore Connector portion of the project.
<br />
<br />WILLIAM J. PALMIERI
<br />
|