My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SHAW Environmental, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-07-01) Prof. General Engineering
>
Responses
>
SHAW Environmental, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2010 9:54:45 AM
Creation date
11/22/2010 9:42:45 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. General Engineering Consultant
Bid No. (xx-xx-xx)
07-07-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />--' <br /><{ <br />If) <br />o <br />"'- <br />o <br />"" <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />" <br /><{ <br />"'- <br />UJ <br />-' <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br />f- <br />o <br />f- <br />f- <br /> <br />.~ <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />Ci <br />0:: <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Directed hydraulic /hydrological studics for the <br />expansion of state 8.5 - mile roadway crossing in <br />Georgia. Investigation included backwater prediction <br />for Bea\'cr Creek, culvert sizing for road crossing, and <br />sediment-monitoring program during construction. <br /> <br />Directed the drainage calculation for railroad <br />coordination of project FLF-S..J.O (8) Taylor County, <br />Georgia to demonstrate no backwater impact from <br />railroad culverts as a result of discharges drained through <br />SR 96 drainage pipes. <br /> <br />Principal Geotechnical Engineer, Transit way <br />Maintenance Facility, Massachusetts Bay <br />Transportation Authority, Boston, MA, 07/2001- <br />09/2001. The project planned and designed Transit <br />\,\'ay J\Iaintenance facility at south Boston, J\L\. <br /> <br />Provided storm runoff analyses and designed a <br />subdrainage piping system and a lift pumping system of <br />sitc drainage for Boston \'\'ater and Se\ver Commission <br />permit application. i\n off-line oil! water separator \vas <br />designed to detain and treat the storm first flush. <br /> <br />Principal Geotechnical Engineer, Londonderry <br />Cogeneration Facility, AES Londonderry, LLC, <br />Londonderry, NH, 08/2000 - OS/2001. The project <br />designed and planned the construction of Londonderr~' <br />cogeneration facility at Londonderry, NH. <br /> <br />Directed hydrological studies to delineate the \vatcrshed <br />basin and corresponding storm \vater runoff associated <br />with the cogeneration facility site and to determine peak <br />flows during storms. Designed outflow structures and <br />detention pond facilities to maintain proper discharge <br />rate. Designed an underground drainage system to <br />relie\'e uplift pressures and control ground\V'ater level <br />during cons truction. <br /> <br />Principal Geotechnical Engineer, Crete Generating <br />Station, Crete Energy Venture, LLC, Crete, IL, <br />03/2001- 04/2001. The project designed and <br />constructed power generation station at Crete, II.. <br /> <br />Directed hydrological and hydraulic analyses for drainage <br />through and adjacent to the site and designed a <br />detention pond to detain the disturbed sediment and <br />control the post-development discharge rate within an <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />OGC 122006T <br /> <br />allowable release rate. Cuh-erts were sized to cOl1\'ey the <br />site drainage across the access road offsite. <br /> <br />Principal Geotechnical Engineer, Rail Spur, Big <br />Brown Steam Electric Station, Texas Utility, TX, <br />09/1997 - 04/2001. The 2S-miles Big Brown Rail Spur <br />in Taxes was designed and constructed. Rail <br />embankment, drainage facilities and the associated <br />erosion protection were designed. <br /> <br />Directed designs of drainage cuh-ert structures and <br />trestles for a new 2S-mile rail spur. Predicted 2S-year <br />and 100-year peak flows at stream crossings. Computed <br />backwater flow and the sizing of drainage facilities. <br />Calculated erosion potential and designed erosion <br />protection measures. Determined flooding boundaries <br />upstream and downstream of the rail to meet hydraulic <br />design requirements. Designed an underground <br />drainage system for dewatering of coal pile storage area. <br /> <br />i\ll drainage flows at stream crossings meet FEJ\L\ <br />requirements and eliminate el1\'ironmental impact. <br /> <br />JONG-CHIANG SHIAU <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.