Laserfiche WebLink
<br />. <br /> <br />-' <br /><{ <br />If) <br />o <br />"'- <br />o <br />0: <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />Cl <br /><{ <br />"'- <br />~ <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br />f- <br />o <br />f- <br /> <br />.i <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Hydraulic & hydrological reports ha\'e been accepted by <br />Georgia DOT for construction permit. <br /> <br />Lead Hydraulic Engineer, Air Force Bases (AFB) <br />Housing Privatization Projects, US Army, N.E., <br />Hanscom AFB, MA, 09/2003 - 04/2006. The <br />projects, included de\'elopment and renO\'ation of <br />existing numbers of AFB housing pri\'atization and its <br /> <br />. . <br />maintenance serVIces. <br /> <br />Directed the preliminary stormwater collection and <br />drainage system to support the development of AFB <br />I-lousing Pri\'atization projects for Hanscom, t\11\. <br /> <br />Accomplishments: <br />Stomwater discharge permit is obtained and project is <br />under construction. <br /> <br />Lead Hydraulic Engineer, Wilson Hill Wildlife <br />Management Area Improvements (WHWMA), <br />10951, New York Power Authority (NYPA), St. <br />Lawrence-FDR Power Project, Massena, N.Y., <br />08/2004 - 12/2004. The project, located at the south <br />shore of St. La\vTence Ri\'er near Massena, N.Y., <br />included the de\'c1opment of the design criteria and <br />engineering planning for the construction of pool water <br />le\'el control structures, dike rehabilitation, New Road <br />Dike construction, and siphon outlet for \'\'ilson Hill <br />Wildlife t\lanagement Area, NYPA <br /> <br />Directed the design de\'Clopment of the construction of <br />pool water level control structures, dike rip rap <br />protection, siphon outlet for lowering pool water level, <br />and dike seepage for \'\'ilson Hill \\!ildlife t\Ianagemcnt. <br /> <br />Lead Hydraulic Engineer, Steward Avenue Para- <br />Transit facility Modifications, Long Island Bus, <br />Nassau County, NY, 03/2004 - 11/2004. The project <br />improved and modified the existing Steward Avenue <br />Para-Transit stormwater drainage system and facilities <br />for use of Long Island Bus terminal. <br /> <br />De\'eloped a drywell drainage system for the site and <br />submitted for drainage recluirement approval from <br />Nassau County Department of Public Works (DP\'\0. <br />The storm drainage system was approved by DPW on <br />October 4, 2004. <br /> <br />Accomplishments: <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />06C122006T <br /> <br />The design of stormwater drainage system and analysis <br />arc completed. <br /> <br />Lead Hydraulic Engineer, MOX Fuel Fabrication <br />Facility (MFFF), US Department of Energy, <br />Chicago Operation Service, Savannah River Site, <br />SC, 09/2004 - 09/2004. The project developed the <br />Mixed Oxide (MOX) Fuel Fabrication Facility (~IFFF) <br />to produce completed MOX fuel assemblies for use in <br />domestic, commercial nuclear power reactors. <br /> <br />Reviewed stormwater drainage system computed using <br />I-Iydratlow by Intelisoh-e for MOX Fuel Fabrication <br />Facility Site in South Carolina. <br /> <br />Lead Hydraulic Engineer, IROQUOIS Gas <br />Transmission System, IROQUOIS, Bronx, NY, <br />08/2002 - 07/2004. The project designed and <br />constructed the compression station for gas transmission <br />system in Bronx, New York. <br /> <br />Pro\'ided storm runoff analyses of a subsurface drainage <br />perforated piping system, for Hunts Point Compression <br />Station, Bronx, New-York permit application. <br />Percolation rates and groundwater ele\'ations on site <br />were e\'aluated. Storage \'olume within dry soils was <br />considered to retain the excessi\'e peak tlood resulted <br />from a server storm. <br /> <br />Lead Hydraulic Engineer, Formerly Used Sites <br />Remedial Action Program (FUSRAP), Maywood <br />Superfund Site, US Army Corps of Engineers, <br />Maywood, NJ, 12/2000 - OS/2004. The project, <br />located in Maywood, Nj, designed and constructed <br />necessary for the mediation of low le\'el radioacti\'e soil <br />at site. <br /> <br />Directed hydrological and hydraulic studies for existing <br />site and excavation. Determined peak pumping rate <br />required for dewatering seepage and surface water within <br />an exca\'ation of each cluster. Designed a bypass <br />drainage system during construction. <br /> <br />Lead Hydraulic Engineer, State Route 96 Widening, <br />Georgia Department of Transportation, Georgia, <br />Taylor County, GA, 02/1999 - 04/2004. The project <br />designed the widening of approximately 8.5 miles of <br />State Route (SR) 96 in Taylor County, Georgia to meet a <br />projected traffic volume of 4425 vehicle per day. <br /> <br />JONG-CHIANG SHIAU <br /> <br />3 <br />