Laserfiche WebLink
<br />. <br /> <br />.i <br /> <br />If) <br />'!l <br />f- <br />UJ <br />UJ <br />I <br />If) <br />If) <br />I <br />f- <br />Z <br />o <br />o <br />UJ <br />z <br />4' <br />f- <br />Z <br />o <br />u <br /><{ <br />f- <br /><{ <br />o <br />"'- <br />o <br />UJ <br />"" <br />::::> <br />If) <br />g <br />u <br />If) <br />Ci <br />"" <br />o <br />UJ <br />If) <br />::::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />major construction and design engineering proposals. <br />Recent assignments have included: <br /> <br />The following is a summary of key projects: <br />Lead Hydraulic Engineer, Dickerson, Midrant Mid- <br />Atlantic, Montgomery County, MD 09/2006- <br />Present. This project is to redevelop Dickerson <br />Generating Station, a steam-electric power plant. <br /> <br />Develop the onsite offsite stormwater drainage system <br />to meet the stormwater discharge requirements. <br /> <br />-' <br /><{ <br />If) <br />o <br />"'- <br />o <br />0:: <br />"'- <br />If) <br />I <br />f- <br />"'- <br />o <br />UJ <br />" <br /><{ <br />"'- <br />UJ <br />-' <br />f- <br />>= <br />UJ <br />I <br />f- <br />Z <br />o <br />z <br />o <br />>= <br />u <br />a:: <br />f- <br />If) <br />UJ <br />"" <br />UJ <br />I <br />f- <br />o <br />f- <br /> <br />Accomplishments: <br />The preliminary conceptual design and estimation are <br />completed. <br /> <br />Lead Hydraulic Engineer, Morgantown, Mirant <br />Mid-Atlantic, Charles County, MD, 09/2006- <br />Present. This project is to redevelop l\forgantown <br />Cenerating Station, a steam-electric power plant. <br /> <br />De\'elop the onsite offsite stornl\vater drainage system <br />to meet the storm\vater discharge requirements. <br /> <br />.-\ccomplishments: <br />The preliminary conceptual design and estimation are <br />completed. <br /> <br />Lead Hydraulic Engineer, Chalk Point, Midrant <br />Mid-Atlantic, Prince George's County, MD, 09/2006 <br />- Present. This project is to redevelop Chalk Point <br />Generating Station, a steam-electric pO\ver plant. <br /> <br />Develop the onsite offsite stormwater drainage system <br />to meet the stormwater discharge retluirements. <br /> <br />Accomplishments: <br />The preliminary conceptual design and estimation are <br />completed. <br /> <br />Lead Hydraulic Engineer, National Enrichment <br />Facility, Louisiana Energy Services, Albuquerque, <br />NM, 12/2005 - Present. The project is to design and <br />develop LES Nuclear Enrichment facility located in Lea <br />County., New t\Iexico. <br /> <br />Determine the maximum ponding depth in adjacent to <br />buildings for the Probable maximum precipitation <br />(PMP) storm event. Develop the onsite stormwater <br />control system to drain runoff offsite. <br /> <br />:\ccomplishments: <br />The development of the site drainage system in <br />obtaining the site construction permit. <br /> <br />Lead Hydraulic Engineer, Emission Control <br />Projects, Dominion, Brayton Point, MA, 12/2004 - <br />Present. This project is to redevelop Brayton Point <br />Generating Station, a steam-electric power plant. <br /> <br />Establish the coastal flood A- V zones for the reclaimed <br />water system construction. Develop a pumping scheme <br />for the ash storage basin drainage. Develop detention <br />basins for the drainage of .\RP dome area. Develop site <br />storm drainage management plan. <br /> <br />,\ccomplishments: <br />Site drainage system is under construction. <br /> <br />Senior Environmental Engineer, Chesterfield <br />Emission Enhancement Project, Dominion <br />Generation, Chester, VA, OS/2003 - Present. This <br />project is to rede\'elnp Chesterfield Emission <br />Enhancement Project located in Chester, Virginia. <br /> <br />De\'elop \'ariable pumping rates and sump dimension <br />and underground drainage system for Gypsum area, <br />Limestone area, and Yard site drainage. <br /> <br />Accomplishments: <br />Site drainage system is under construction. <br /> <br />Lead Hydraulic Engineer, SR3 (US 19) Widening, <br />Georgia Department of Transportation, Georgia, <br />Sumter County, GA, 03/2006 - 04/2006. The project <br />designed the widening of approximately 5.5 miles of <br />State Route (SR) 3 in Sumter County, Georgia to meet a <br />projected traffic volume of 7500 vehicle per day. <br /> <br />Develop hydraulic & hydrological report for the SR 3 <br />bridge over Bear Branch for the replacement with <br />parallel 120 ft long rein forced concrete deck girder <br />bridge. Develop hydraulic & hydrological report for the <br />SR 3 bridge over ~[uckaloochee Creek for the additional <br />parallel 240 ft long reinforced concrete deck girder <br />bridge. Design culverts for the drainage of road nmoff. <br />Design sediment and erosion control for road <br />cons tructton. <br /> <br />Accomplishments: <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />2 <br /> <br />JONG-CHIANG SHIAU <br /> <br />OGC122006T <br />