|
<br />Swamp, Burning Grounds/Exposed TNT Area, and Old
<br />Yellow Water Reservoir Area (2004); Site-Specific
<br />Sampling and Analysis Plan for Site Investigative
<br />Activities at the Electric Meter House and Main Switch
<br />House, Concrete Pit, and Sanitary Sewer System (2003);
<br />and Site-Specific Sampling and Analysis Plan for
<br />Supplementary Investigative Activities for the Collection
<br />and Analysis of Treatabiliry Study Data (2003), ESI-9
<br />Groundwater Review Package (2000); Site-Specific
<br />Sampling and Analysis Plan for the Supplementary Soil
<br />Sampling at the South Acids Area, Toluene Storage
<br />Areas, and Cooling Tower Area (OU-10) (2000); Data
<br />Summary Report for the Supplementary Soil Sampling at
<br />the South Acids Area, Toluene Storage Areas, and
<br />Cooling Tower Area (OU-IO) (2001); Technical
<br />Memorandum, ESI-9/0utgoing Classification Yard,
<br />Supplemental Analytical Data Summary (2001);
<br />Evaluation of Filtration on Nitroaromatic
<br />Concentrations in Groundwater (2002); Site-Specific
<br />Sampling and Analysis Plan Supplementary Investigative
<br />Activities at the Motor Pool/Maintenance Area (ESI-6),
<br />South Acids Area, Toluene Storage Areas and Cooling
<br />Tower Area (OU-lO), and TNT Manufacturing Area
<br />(OU-8/0U-9) (2002); and Site-wide Background Study
<br />(2002). Conducted and/ or oversaw field efforts related
<br />to most of these reports or work plans, including low-
<br />flow (minimal drawdown) groundwater sampling, three
<br />volume purge groundwater sampling, surface water and
<br />sediment sampling, soil sampling with direct-push
<br />technology rig, and groundwater level measurements.
<br />
<br />Responsible for preparing the work plans and
<br />investigation reports and overseeing the field effort for
<br />each of the below-mentioned long-term monitoring
<br />groundwater sampling events. Long-Term Monitoring
<br />Reports prepared for \'<1V0\'V' and the dates they were
<br />finalized include: Eleventh Annual OU-1 Investigation
<br />and Ninth Annual OU-2 and OU-3 Investigation (2005);
<br />Tenth Annual OU-1 Investigation and Eighth Annual
<br />OU-2 and OU-3 Investigation (2004); Ninth Annual
<br />OU-1 Investigation, Seventh Annual OU-2 and OU-3
<br />Investigation and Fifth Annual OU-11 Investigation
<br />(2004), and Eighth .Annual OU-1 Investigation and Sixth
<br />Annual OU-2 and OU-3 Investigation and Fourth
<br />Annual OU-11 Investigation (2003).
<br />
<br />Prepared the Seventh Annual OU-1 Investigation and
<br />Fifth Annual OU-2 and OU-3 Investigation and Third
<br />Annual OU-11 Investigation Long-Term ~Ionitoring
<br />Report for groundwater sampling at \'(,'VO\V
<br />
<br />08/1998 - 10/2000, Environmental
<br />Scientist, HydroGeologic, Inc., Austin, TX
<br />Conducted and oversaw field activities at Naval Air
<br />Station (NAS) Fort Worth Joint Reserve Base aRB)
<br />(Carswell Field) in Fort Worth, Texas. Field tasks
<br />included groundwater sampling, soil sampling, well
<br />development, weekly product removal, well
<br />maintenance, well gauging, and IDW disposal.
<br />Performed well installation and soil sampling with both
<br />direct push technology (DPT) and hollow stem auger
<br />drilling methods. Field work included quarterly
<br />groundwater sampling, landfill investigations, and TCE
<br />plume delineation with both dedicated and non-
<br />dedicated bladder pumps. Office supports activities
<br />included data validation, tabulation of data, entering
<br />borelog data in \Vinlog, and report preparation. Rep?rts
<br />prepared included Southern Plume Delineation Report
<br />and a quarterly groundwater sampling Report.
<br />
<br />t\[s. Anglin supported a potentially responsible party
<br />(PRP) investigation for the Estes Landfill in Phoenix,
<br />Arizona. As part of this investigation, she reviewed
<br />corporate and financial records from Dun and
<br />Bradstreet and Hoovers Online to determine the
<br />corporate history and current financial status for
<br />approximately 40 large companies, gathered and
<br />reviewed records obtained from local agencies, and
<br />interfaced with clients.
<br />
<br />In addition, Ms. Anglin supported the modeling group in
<br />the Austin office by editing reports, preparing figures
<br />using TECPLOT, AutoCAD, and Corel DRAW for
<br />Kelly Air Force Base in San Antonio, Texas and
<br />SSCOM.
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />CATHERINE W. ANGLIN 2
<br />
<br />06C122006T
<br />
|