Laserfiche WebLink
<br />Catherine W. Anglin <br /> <br />. <br /> <br />Education <br /> <br />B.S., Earth and Atmospheric Sciences, Georgia Institute <br />of Technology (Georgia Tech), 199G <br /> <br />Background Summary <br /> <br />. <br /> <br />~[s. Anglin is an Environmental Scientist with over 10 <br />years of experience in site investigations and report <br />writing in the realm of em'ironmental consulting. ~fs. <br />Anglin provides technical oversight, coordination, and <br />task management. She has performed and overseen <br />several subsurface investigations and site investigation <br />projects in Texas, \Vest Virginia, Florida, and Puerto <br />Rico. Ms. Anglin has completed projects at sites with <br />nitroaromatics (explosi,'es), trichloroethene (fCE), <br />metals, and fuel-related contamination. She has field <br />experience related to soil, sediment, surface water, and <br />groundwater sampling. Soil sampling experience has <br />been with both direct-push technology and hollow-stem <br />auger drilling rigs. Groundwater sampling experience <br />has been with low-flow (minimal dra,vdown) sampling <br />and three w)lume purge techniclues with bladder, <br />perstaltic, and Grundfos pumps. i\1s. l\nglin writes and <br />prepares site investigation reports, including long-term <br />monitoring reports, reports of findings, work plans, data <br />package reports, feasibility studies, and site-wide <br />background studies. i\[s. ,\nglin has experience in <br />preparing Potentiall!' Responsible Party (PRP) searches <br />for the U.S. Environmental Protection i\gency. <br />Throughout i\.1s. Anglin's career, her organization and <br />site knowledge ha,'e enabled her to solve the <br />em'ironmental challenges she has faced with her <br />projects, closing them ahead of schedule and under <br />budget. <br /> <br />i\[s. Anglin also served as Construction Quality Control <br />Site i\.1anager for a large levee repair project in southern <br />Louisiana following Hurricane Katrina. <br /> <br />. <br /> <br />Relevant Experience <br /> <br />02/2006 - 08/2006, Construction Quality <br /> <br />Control Manager, Shaw Environmental & <br />Infrastructure, Inc. <br /> <br />;\s a special assignment in response to Hurricane <br />Katrina, Ms. Anglin assumed the role of CQC Manager <br /> <br />for an S 18 million levee repair project in southern <br />Louisiana. This project ilwolved emergency repairs to <br />4.85 miles of hurricane protection le,'ee along the west <br />bank of the ~[ississippi Ri,'er. The scope included <br />borrow pit development; excavation, processing, <br />loading, hauling, and placing nearly 1,000,000 CY 0 f <br />borrow material; placement of riprap; geotextile fabric <br />placement; surfacing stone; and Hydroseeding. Her <br />responsibilities included soil classification, moisture <br />testing, review of material documentation, and daily <br />reporting. As this was a US Army Corps of Engineers <br />(USACE) project, i\1s. Anglin implemented the USACE <br />three phases of Quality Control by preparing and <br />executing the Preparatory, Initial, and Follow-up Phases <br />prescribed by the USACE. <br /> <br />10/2000 - Present, Environmental <br />Scientist, Shaw Environmental & <br />Infrastructure, Inc. <br /> <br />Responsibilities include task management, report writing <br />and preparation, and conducting and m'erseeing field <br />investigations. Primary assignment is \'('est Virginia <br />Ordnance \,\'orks (\'\VO\\') in Point Pleasant, West <br />Virginia. Recent assignments have also included Former <br />Lee Field Na\'al ,\ir Station in Creen Cm'e Springs, <br />Florida and Former Ramey Air Force Base in Aquadilla, <br />Puerto Rico. l\lso performed field \vork (slug testing <br />and groundwater sampling) and report preparation for <br />Plum Brook Ordnance \,\'orks in Sandusky, Ohio. <br /> <br />Field acti,'ities range from landfill im'estigations, fuel <br />pipeline im'estigations, se,ver line investigations, and <br />former TNT manufacturing area investigations. Field <br />tasks include groundwater sampling using bladder, <br />Grunfos, and perstaltic pumps; soil sampling using <br />direct-push technology (OPT) and hollow-stem auger <br />drilling methods; sediment and surface water sampling; <br />soil gas survey using GORE-sorbers(R); and <br />groundwater level measurements. <br /> <br />Reports prepared include: Feasibility Study for the <br />Southeast Area (2005); Report of Findings for the <br />Southeast Area Supplementary Investigation (2005); Site <br />Investigation Report for the Electric i\Ieter House, Main <br />Switch House, Concrete Pit, and Sanitary Sewer System <br />(2004); Site-Specific Sampling and Analysis Plan for <br />Supplementary Investigative Activities at the Main <br />Trunk Sewer Line, TNT Manufacturing Area, Southern <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />CATHERINE W ANGLIN <br /> <br />06C122006T <br />