|
<br />.
<br />
<br />-'
<br /><<
<br />U)
<br />a
<br /><l.
<br />a
<br />'"
<br /><l.
<br />U)
<br />I
<br />f-
<br />"-
<br />a
<br />w
<br />"
<br /><<
<br /><l.
<br />~
<br />f-
<br />;:::
<br />W
<br />I
<br />f-
<br />Z
<br />a
<br />z
<br />a
<br />;:::
<br />u
<br />a:
<br />f-
<br />U)
<br />W
<br />'"
<br />W
<br />I
<br />f-
<br />a
<br />f-
<br />
<br />.~
<br />
<br />U)
<br />~
<br />f-
<br />W
<br />W
<br />I
<br />U)
<br />~
<br />I
<br />f-
<br />Z
<br />a
<br />o
<br />w
<br />Z
<br />;;;:
<br />f-
<br />Z
<br />a
<br />u
<br /><<
<br />f-
<br /><<
<br />o
<br />"-
<br />a
<br />w
<br />'"
<br />:J
<br />U)
<br />g
<br />u
<br />U)
<br />o
<br />'"
<br />a
<br />w
<br />U)
<br />:J
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />Roy W. Case, P.E.
<br />Senior Mechanical Engineer
<br />
<br />Why Selected as Key Personnel for Contract
<br />
<br />. Extensive experience in HV AC system design,
<br />and plumbing and fire protection systems for
<br />industrial, commercial, and institutional
<br />projects
<br />. 40 years of mechanical facilities engineering
<br />experience
<br />
<br />Education
<br />
<br />B.S., t\lechanical Engincering, Northeastcrn University,
<br />1965
<br />
<br />Registrations
<br />Professional Engineer: Mechanical, t\IA, N], OH, R[
<br />
<br />Background Summary
<br />
<br />i\ [r. Casc has m'cr -1-0 ycars of engineering experience
<br />including all aspects of mechanical facilitics engineering,
<br />technical staff super;ision, projcct engincering, and
<br />project managcment. He is able to provide technical
<br />direction for large projccts, and can prm-ide overall
<br />project coordination including scheduling and progress
<br />monitoring for both large and small projects.
<br />
<br />i\lr. Case has extensi\'e experience in HVAC system
<br />design including industrial, commercial, and institutional,
<br />transportation, and research projects. He has experience
<br />in designing large and small systems, from single room
<br />applications to large central systems including central
<br />heating plants and district heating/ cooling distribution
<br />systems. His expericnce has also included design of
<br />computer room systems, clean room facilities, low
<br />humidity rooms, paint spray rooms, cncrgy rccovery
<br />systems, hazardous area systems, and dust collcction and
<br />suppression systems.
<br />
<br />i\[r. Case is experienced in the design of plumbing and
<br />fire protection systems for industrial, commercial, and
<br />institutional buildings.
<br />
<br />He is experienccd in thc design of mcchanical support
<br />systems for various process applications such as
<br />compressed air, lube oil distribution, steam and
<br />condensate return, vacuum, cooling water, dust
<br />collection, and water treatment systems.
<br />
<br />I SHAW ENVIRONMENTAL, INC.
<br />
<br />06C122006T
<br />
<br />t\lr. Case has experience in the planning, scheduling, and
<br />ovcrall supervision of technical project activities
<br />including staffing, cost tracking, and technical interface
<br />with clicnts.
<br />
<br />Relevant Experience
<br />
<br />1973 - Present, Shaw Environmental &
<br />
<br />Infrastructure, Inc.
<br />
<br />Aberdeen Chemical Agent Disposal Facility,
<br />
<br />Edgewood, MD Oune 1999 to present)
<br />
<br />Jan. 2002 to present. Senior Engineer in charge of the
<br />
<br />design, and installation of the utility systems for a
<br />Chemical Demilitarization Facility, including fire
<br />
<br />protection, steam, water, chilled water, plumbing,
<br />compressed air, and HV AC systems including the
<br />
<br />cascade \'etllilation system.
<br />
<br />Provided mechanical engineering support of plant
<br />operations including system and equipment upgrades to
<br />support c\'oh'ing plant needs.
<br />
<br />He provided support for decommissioning and
<br />demolition activities including preparation of turnm-er
<br />packages and denloping decontamination techniclues.
<br />
<br />Sincc Fcb 2002, work has consisted of performing
<br />engineering design directly for the systems contractor,
<br />first during construction, then in support of plant
<br />operations activities, and sincc Feb 2006, for
<br />decommissioning acti\'ities.
<br />
<br />June 1999 to J an 2002. Lcad facility and utility engineer
<br />on a project for the U.S. [\rmy to review and monitor
<br />the design and construction of a mustard agent disposal
<br />facility. Responsible for HVAC, plumbing, fire
<br />protection, compressed air, steam, condcnsate return,
<br />fuel oil, spent decontamination fluid, and plant water
<br />systems. Work for the first 2-1/2 years included design
<br />document reviews, design change evaluations, cost
<br />estimates, schedule monitoring, and providing technical
<br />advice to the Army and the systems contractor.
<br />
<br />Municipal Waste Composting Facility, Waste
<br />Options Inc., Nantucket, MA (Mar 1998 - June
<br />1999). Lead mechanical enginecr on an Ere contract to
<br />design a 50-ton per day compost facility with a
<br />construction cost of twelve million-dollars. Responsible
<br />for designing the HV AC, plumbing, and fire protection
<br />
<br />ROY W_ CASE Q
<br />
|