Laserfiche WebLink
<br />. <br /> <br />-' <br /><< <br />U) <br />a <br /><l. <br />a <br />'" <br /><l. <br />U) <br />I <br />f- <br />"- <br />a <br />w <br />" <br /><< <br /><l. <br />~ <br />f- <br />;::: <br />W <br />I <br />f- <br />Z <br />a <br />z <br />a <br />;::: <br />u <br />a: <br />f- <br />U) <br />W <br />'" <br />W <br />I <br />f- <br />a <br />f- <br /> <br />.~ <br /> <br />U) <br />~ <br />f- <br />W <br />W <br />I <br />U) <br />~ <br />I <br />f- <br />Z <br />a <br />o <br />w <br />Z <br />;;;: <br />f- <br />Z <br />a <br />u <br /><< <br />f- <br /><< <br />o <br />"- <br />a <br />w <br />'" <br />:J <br />U) <br />g <br />u <br />U) <br />o <br />'" <br />a <br />w <br />U) <br />:J <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Roy W. Case, P.E. <br />Senior Mechanical Engineer <br /> <br />Why Selected as Key Personnel for Contract <br /> <br />. Extensive experience in HV AC system design, <br />and plumbing and fire protection systems for <br />industrial, commercial, and institutional <br />projects <br />. 40 years of mechanical facilities engineering <br />experience <br /> <br />Education <br /> <br />B.S., t\lechanical Engincering, Northeastcrn University, <br />1965 <br /> <br />Registrations <br />Professional Engineer: Mechanical, t\IA, N], OH, R[ <br /> <br />Background Summary <br /> <br />i\ [r. Casc has m'cr -1-0 ycars of engineering experience <br />including all aspects of mechanical facilitics engineering, <br />technical staff super;ision, projcct engincering, and <br />project managcment. He is able to provide technical <br />direction for large projccts, and can prm-ide overall <br />project coordination including scheduling and progress <br />monitoring for both large and small projects. <br /> <br />i\lr. Case has extensi\'e experience in HVAC system <br />design including industrial, commercial, and institutional, <br />transportation, and research projects. He has experience <br />in designing large and small systems, from single room <br />applications to large central systems including central <br />heating plants and district heating/ cooling distribution <br />systems. His expericnce has also included design of <br />computer room systems, clean room facilities, low <br />humidity rooms, paint spray rooms, cncrgy rccovery <br />systems, hazardous area systems, and dust collcction and <br />suppression systems. <br /> <br />i\[r. Case is experienced in the design of plumbing and <br />fire protection systems for industrial, commercial, and <br />institutional buildings. <br /> <br />He is experienccd in thc design of mcchanical support <br />systems for various process applications such as <br />compressed air, lube oil distribution, steam and <br />condensate return, vacuum, cooling water, dust <br />collection, and water treatment systems. <br /> <br />I SHAW ENVIRONMENTAL, INC. <br /> <br />06C122006T <br /> <br />t\lr. Case has experience in the planning, scheduling, and <br />ovcrall supervision of technical project activities <br />including staffing, cost tracking, and technical interface <br />with clicnts. <br /> <br />Relevant Experience <br /> <br />1973 - Present, Shaw Environmental & <br /> <br />Infrastructure, Inc. <br /> <br />Aberdeen Chemical Agent Disposal Facility, <br /> <br />Edgewood, MD Oune 1999 to present) <br /> <br />Jan. 2002 to present. Senior Engineer in charge of the <br /> <br />design, and installation of the utility systems for a <br />Chemical Demilitarization Facility, including fire <br /> <br />protection, steam, water, chilled water, plumbing, <br />compressed air, and HV AC systems including the <br /> <br />cascade \'etllilation system. <br /> <br />Provided mechanical engineering support of plant <br />operations including system and equipment upgrades to <br />support c\'oh'ing plant needs. <br /> <br />He provided support for decommissioning and <br />demolition activities including preparation of turnm-er <br />packages and denloping decontamination techniclues. <br /> <br />Sincc Fcb 2002, work has consisted of performing <br />engineering design directly for the systems contractor, <br />first during construction, then in support of plant <br />operations activities, and sincc Feb 2006, for <br />decommissioning acti\'ities. <br /> <br />June 1999 to J an 2002. Lcad facility and utility engineer <br />on a project for the U.S. [\rmy to review and monitor <br />the design and construction of a mustard agent disposal <br />facility. Responsible for HVAC, plumbing, fire <br />protection, compressed air, steam, condcnsate return, <br />fuel oil, spent decontamination fluid, and plant water <br />systems. Work for the first 2-1/2 years included design <br />document reviews, design change evaluations, cost <br />estimates, schedule monitoring, and providing technical <br />advice to the Army and the systems contractor. <br /> <br />Municipal Waste Composting Facility, Waste <br />Options Inc., Nantucket, MA (Mar 1998 - June <br />1999). Lead mechanical enginecr on an Ere contract to <br />design a 50-ton per day compost facility with a <br />construction cost of twelve million-dollars. Responsible <br />for designing the HV AC, plumbing, and fire protection <br /> <br />ROY W_ CASE Q <br />