Laserfiche WebLink
<br />. <br /> <br />-' <br />0< <br />(f) <br />o <br />a. <br />o <br />0: <br />a. <br />(f) <br />I <br />I- <br />u. <br />o <br />w <br />Cl <br />0< <br />a. <br />"j <br />I- <br />;:: <br />W <br />I <br />I- <br />Z <br />o <br />Z <br />o <br />;:: <br />u <br />0: <br />I- <br />(f) <br />W <br />0: <br />W <br />I <br />I- <br />o <br />I- <br /> <br />.i <br /> <br />(f) <br />'<l <br />I- <br />W <br />W <br />I <br />(f) <br />(f) <br />I <br />I- <br />Z <br />o <br />o <br />w <br />z <br />;j' <br />I- <br />Z <br />o <br />U <br />0< <br />I- <br />0< <br />o <br />u. <br />o <br />W <br />0: <br />::> <br />(f) <br />g <br />u <br />(f) <br />is <br />0: <br />o <br />W <br />(f) <br />::> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />systems, and laying out the mechanical process <br />equipment. Prepared specifications for process <br />equipment, reviewed bids, and selected equipment <br />,'endors. Also responsible for monitoring the <br />mechanical construction effort, responding to RFI's <br />from the field, and inspecting the \\lork of the <br />mechanical contractor. <br /> <br />Bus Maintenance Facility, Rhode Island Public <br />Transit Authority, Providence, Rhode Island (Mar <br />1997 - Dee 1998). Lead mechanical engineer for the <br />design of a sixteen million-dollar bus maintenance <br />facility serving a total of 130 diesel and CNG fueled <br />busses. Maintenance activities included major <br />rebuilding, (engines and transmissions), body shop and <br />painting, engine and chassis dynamomcter testing, as <br />well as brakcs, tires, alignment, routine servicing, and <br />emergency repairs. <br /> <br />U.S. Department of State, Office of Foreign <br />Building Operations G une 1986 to Oct 1998), <br />Indefinite Quantity Contracts. :\ctcd as project <br />manager for the design of ,.at,ious projccts for thc State <br />Department. Specific projccts included an addition to <br />the consular facility at Islamabad, Pakistan, redesign of <br />the consular facility at Panama City, Panama, and design <br />of an HV AC system upgrade and window replacement <br />project for the Embassy at Rangoon, Burma. Lead <br />mechanical engineer for a numbcr of projects including: <br />Public Access Control modifications at Embassies in <br />South America, Africa, Asia, and Europc; chiller plant <br />replacement for the consulate in Rio de Janeiro, Brazil; <br />rchabilitation of a 16 story office building in Panama; <br />and a new 50,000 square foot embassy office building in <br />Budapcst, Hungary. <br /> <br />Boston, Massachusetts - Massachusetts Highway <br />Department Gune 1994 - Mar 1998). Lead mechanical <br />engineer for the 09C section design performed by the <br />team of Berger, Lochner, Stonc and \'\/ebster. Duties <br />consisted of design of the fire standpipe system for the <br />project viaducts and boat sections, drainage of viaducts <br />and bridges, and the mechanical and hydraulic design for <br />stormwater pumphouse No.7. <br /> <br />I SHAW ENVIRONMENTAL. INC. <br /> <br />06C 122006T <br /> <br />Third Harbor Tunnel Engineering Design Review <br />Team, Boston, Massachusetts - Massachusetts <br />Turnpike Authority (Dee 1993 - June 1994). Lead <br />mcchanical engineer responsiblc for coordinating thc <br />mechanical effort to revicw the design and start-up <br />testing of the tunnel ventilation system and firc <br />protection and drainage systems. This \\lork included all <br />of the tunnel mechanical systems as well as the <br />mechanical work on the supporting structures including <br />the vent buildings, administration building, operations <br />center, and State Police Station. <br /> <br />Ventilation Study for Miami International Airport, <br />Miami, Florida - Dade Aviation Consultants Ouly <br />1997 - Feb 1998). Technical advisor for a study to <br />determine the ventilation rC(luirements for the lowcr <br />,'ehiclc dri,'e that serves the arri,'als area at Miami <br />[ntcmational :\irport. The purpose of thc study is to <br />determine the ventilation requirements for this area of <br />the airport and to dc,'clop mechanical and structural <br />criteria for use in designing systems to maintain <br />contaminants within acceptable lc,'els. <br /> <br />CNG Bus Maintenance and Storage Facility, Akron <br />Ohio - Metro Regional Transportation Authority <br />(Sept 1996 - June 1997). Lead mechanical enginccr for <br />a project to upgrade the mechanical systems for a bus <br />maintenance, fueling, and storage facility to <br />accommodate CNG fueled "chicles. <br /> <br />Hemphill Power Plant HV AC Modifications, <br />Springfield, New Hampshire - Thermo Energy <br />Systems (Mar 1996 - JuI1996). Designed pressurizcd <br />enclosures for the stand by generator and thc electrical <br />switchgear to protect them from the airbome dust in a <br />wood/bark buming power station. The systems <br />included filtered make up air for pressurization and <br />heating as requircd for winter operation. <br /> <br />IAQ Investigation and HV AC System <br />Modifications, Cambridge, Massachusetts - <br />MyoGenics Inc. (Apr 1995 - JuI1995). Project <br />Engineer for a study to im'estigate indoor air quality <br />concems for a research laboratory. The project included <br />air monitoring for the facility, system evaluations, and <br />design of HV AC modifications to improve air quality in <br />the office and lab areas. <br /> <br />ROY W. CASE I~ <br />