|
<br />.
<br />
<br />.J
<br /><(
<br />en
<br />o
<br />c.
<br />o
<br />a::
<br />c.
<br />en
<br />I
<br />f-
<br />u.
<br />o
<br />w
<br />CO
<br /><(
<br />c.
<br />~
<br />f-
<br />>=
<br />W
<br />I
<br />f-
<br />Z
<br />o
<br />Z
<br />o
<br />>=
<br />()
<br />ii:
<br />f-
<br />en
<br />W
<br />a::
<br />W
<br />I
<br />f-
<br />a
<br />f-
<br />
<br />.i
<br />
<br />en
<br />!Q
<br />f-
<br />W
<br />W
<br />I
<br />en
<br />en
<br />I
<br />f-
<br />Z
<br />o
<br />a
<br />w
<br />z
<br /><i'
<br />f-
<br />Z
<br />o
<br />()
<br /><(
<br />f-
<br /><(
<br />Cl
<br />~
<br />w
<br />a::
<br />::J
<br />en
<br />'3
<br />()
<br />en
<br />is
<br />a::
<br />o
<br />w
<br />en
<br />::J
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />Hanscom AFB Indefinite Quantity Contracts,
<br />Bedford, Massachusetts - U.S. Air Force (Apr 1993-
<br />Jan 1994). As Project Manager responsiblc for the
<br />tcchnical, budget, and schedulc performance of the team
<br />for various projects. Specific tasks included laboratory
<br />renovations at Buildings 1120 & 1128, HV AC analysis of
<br />Buildings 1600 & 1141, and the rcdesign of the entire
<br />HVAC systems for Buildings 1612 & 1624 including the
<br />design of an ice storage facility to serve the chilled water
<br />system.
<br />
<br />Rail Facilities Maintenance Rehabilitation, New
<br />Haven, Connecticut - Connecticut DOT (Dec 1987
<br />- Mar 1988). As Lead Mechanical Engineer, t\[r. Case
<br />supelTised the design of all mechanical facilities for the
<br />car shop and diesel shop rehabilitation projects at thc
<br />New Ha"en Rail Yards. \,\'ork includes design of
<br />HV AC, plumbing, and fire protection systems for two
<br />major repair shops including shop arcas, officc areas,
<br />locker rooms, and other personnel areas. He also
<br />provided support for industrial cnginecring including
<br />specialized ventilation, drainage and compresscd air
<br />s\'stems.
<br />
<br />Windsor Maintenance Facility, Windsor,
<br />Connecticut - Connecticut DOT (Mar 1988 - Jan
<br />1989). As Lead t\[echanical Engineer, Mr. Case designed
<br />HV AC, plumbing and fire protection systcms for a
<br />highway "chicle maintcnance facility including
<br />preparation of specifications and estimates and
<br />supen'ising the preparation of thc drawings. Post design
<br />,vork consisted of shop drawing review and construction
<br />inspection. Special systems designed included fuel
<br />dispensing and monitoring systems.
<br />
<br />Runcorn Coating Facility Gan 1989 to Nov 1990),
<br />Runcorn, United Kingdom - James River Graphics.
<br />As Lead Mechanical Engineer, t\[r. Casc supervised the
<br />design of HV AC, plumbing and fire protection systems
<br />for a film coating facility in the United Kingdom. Work
<br />included specifications, drawings, and estimates. Special
<br />systems included fume collection, class 100 and 1000
<br />clean rooms, low humidity rooms, and fume
<br />incineration. This project required familiarization with
<br />codcs and standards for the United Statcs and United
<br />Kingdom as well as availability of e(luipment overseas.
<br />Mr. Case was in close contact with British contractors
<br />throughout construction and startup.
<br />
<br />I SHAW ENVIRONMENTAL, INC.
<br />
<br />06G 122006 T
<br />
<br />A VLIS Facility (Mar 1984 to Dec 1984), Livermore,
<br />California - Lawrence Livermore Laboratories. As
<br />Lead Mechanical Engineer, t\[r. Case was responsible for
<br />developing the mechanical systems design for a laser-
<br />based uranium cnrichment facility. These systems
<br />included process cooling water, site drainage, HV1\C,
<br />plumbing, and fire protection. The design included
<br />systems to support clean rooms, optical clean rooms,
<br />low humidity optical rooms (3% rh), contamination
<br />containment systems, fire protection, and other safety
<br />systems. t\[r. Case was responsible for interfacing with
<br />the scientists developing the enrichment process to
<br />determinc building and mcchanical system nceds to
<br />support all phases of the process.
<br />
<br />North Anna Power Station, Unit 3 (Feb 1982 to Jan
<br />1983), North Anna, Virginia - Virginia Electric
<br />Power Co. As Assistant Project Engineer, Mr. Casc was
<br />rcsponsible for cstablishing and maintaining schedules,
<br />monitoring progress, and providing supelTision for the
<br />mechanical, electrical, con trols, geotechnical, and nuclear
<br />technology disciplines for the project. He coordinatcd
<br />,vith the various divisions to maintain project staffing for
<br />cach group and provided personnel cvaluations to the
<br />divisions. 0.[r. Case cstablishcd a mechanical cquipment
<br />qualification program to establish cm'ironmcntal
<br />qualification standards for the mechanical cquipment
<br />used in safety-related plant systems.
<br />
<br />ROY W. CASE [2]
<br />
|