Laserfiche WebLink
<br />. <br /> <br />...i <br /><( <br />(/) <br />o <br />0- <br />o <br />0: <br />0- <br />(/) <br />I <br />I- <br />U. <br />o <br />w <br />'" <br /><( <br />0- <br />W <br />-' <br />I- <br />>= <br />W <br />:r: <br />I- <br />z <br />o <br />z <br />o <br />>= <br />u <br />ii: <br />l- <br />(/) <br />w <br />0: <br />w <br />:r: <br />I- <br />o <br />I- <br />.i <br />(/) <br />~ <br />I- <br />W <br />W <br />:r: <br />(/) <br />(/) <br />I <br />I- <br />Z <br />o <br />o <br />w <br />Z <br /><( <br />I- <br />Z <br />o <br />u <br /><( <br />I- <br /><( <br />o <br />u. <br />o <br />w <br />0: <br />=> <br />(/) <br />g <br />u <br />(/) <br />o <br />0: <br />o <br />W <br />(/) <br />=> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />test results, and establishing soils and rock parameters <br />for use in engineering analysis. <br /> <br />/\.1so, please refer to project experience. <br /> <br />The following is a summary of key projects: <br />Geotechnical Consultant, Bridgeport Harbor <br />Station Unit 3 Mercury Control System, PSE&G, <br />Bridgeport, CT, 03/2006 - Present. As Geotechnical <br />Consultant, provided technical consultation and review <br />of calculations to determine seismic site class, allmvable <br />pile load and ( for booster fans) dynamic stiffness of pile <br />foundation. Reviewed results of pile load tests to <br />determine the allowable pile load capacity. <br /> <br />Geotechnical Consultant, Brunner Island Unit 3 <br />ESP & FGD Projects, Pennsylvania Power and <br />Light, York Haven, PA, OS/2005 - Present. As <br />Geotechnical Consultant, provided technical <br />consultation and re\.iew of calculations determinc the <br />seismic site class, allowablc pile loads and (booster fan <br />fans) dynamic stiffncss of pilc-supported foundation. <br />E\'aluated methods for pro\'iding lateral support of a <br />deep exca\'ation in loosc, saturated tly ash fill. <br /> <br />Geotechnical Consultant, Mixed Oxide (MOx) Fuel <br />Fabrication Facility, US Department of Energy - <br />Chicago Operations Office, Aiken, SC, OS/2002- <br />Present. As Geotcchnical Consultant, provide technical <br />consultation and review of various geotechnical analyses <br />which including seismic site response analysis, <br />liquefaction analysis, slope stability analysis and <br />settlement analysis. Provided critical reviews and <br />comments for the Site Geotechnical Report to ensure its <br />technical ade(luacy for NRC permit licensing application. <br /> <br />Lead Geotechnical Engineer, MBTA 1-90/1-93 <br />Coordination Services, Massachusetts Bay Transit <br />Authority (MBTA), Boston, MA, OS/2002 - Present. <br />As Lead Geotechnical Engineer, responsible for <br />geotechnical design adequacy review of the construction <br />of Central Artery/Third Harbor Tunnel structures near <br />or crossing the r-.IBTA facilities. The efforts include all <br />aspects of structures, especially soil-structure interaction <br />analyses and construction impact and disturbance <br />evaluation to ensure safe operation of the MBT[\ <br />facilities during construction of the [-90/1-93 structures. <br /> <br />SHAW ENVIRONMENTAL. INC. <br /> <br />E\'aluated and commented on the proposed <br />underpinning of the South Station Red Line to permit <br />the construction of northbound leg of the Central .Artery <br />beneath the station using mined tunneling in conccrt <br />with pipe-jacking techni(lues. Provided critical tcchnical <br />revie\vs and commented on the methods of computing <br />stresscs changes of the MBTA Red Line tunnels due to <br />the construction of 1-90 Fort Point Channel tunnel <br />crossing. In addition, recommended the use of <br />parametric study to analyze construction sequencing and <br />its effect on the stresscs of the Red Line tunnels. <br /> <br />Pro\'ided comprehcnsi\'c tcchnical re\'iews and <br />commented on the impacts of jacking full-section <br />highway tunnels beneath South Station railroad yard and <br />constructing deep cut-and-cO\'er tunnels adjacent to the <br />railroad tracks. Provided critical technical revicws and <br />commented on ground freezing as soil stabilization <br />method for improving face stability during tunneling. <br /> <br />Rc\'ic\V and commcnted on the underpinnings dcsign of <br />North Station platforms and railroad tracks, and Grecn <br />Linc Scicnce Park Station to facilitate 1-90/1-93 <br />construction beneath thesc structurcs. Rcvicwand <br />commentcd on thc proposed NATl\1 tunneling with <br />Door Framc p.-lethod of construction under the North <br />Station platforms and railroad structures. <br /> <br />Geotechnical Consultant, Westlake Styrene <br />Revamp, Weslake Chemical, Sulphur, LA, 08/2006 - <br />11/2006. As Geotechnical Consultant, rc\'iewcd cxisting <br />geotcchnical data, the design calculation of the augured <br />cast-in-place (ACIP) piles and settlements of proposed <br />pile-supportcd foundations. <br /> <br />Geotechnical Consultant, Mercer Station Units 1 & <br />2, PSE&G, Hamilton Township, N], 11/2005- <br />01/2006. As Geotechnical Consultant, reviewed existing <br />geotcchnical reports and proposed Powdered Carbon <br />Silo foundation to assess the need for piles for support <br />of the foundation. Also performed calculation of thc <br />suitability of pipe piles recommended for support of the <br />Powdered Activated Carbon Silo foundation. <br /> <br />Geotechnical Consultant, Independent Fuel Storage <br />Installation, 101893, Monticello Nuclear Generating <br />Plant, Monticello, MN, 06/2004 - OS/2005. 1\S <br />Geotechnical Consultant, provided technical <br />consultation for development of field programs and <br />THOMAS Y. CHANG <br /> <br />2 <br /> <br />06C 122006T <br />