Laserfiche WebLink
<br />. <br /> <br />--' <br /><( <br />(j) <br />o <br />0- <br />o <br />'" <br />0- <br />(j) <br />I <br />I- <br />"'- <br />o <br />w <br /><!l <br /><( <br />0- <br />W <br />--' <br />I- <br />>= <br />W <br />:r: <br />I- <br />z <br />o <br />z <br />o <br />>= <br />u <br />ii' <br />I- <br />(j) <br />W <br />'" <br />w <br />:r: <br />I- <br />o <br /> <br />.~ <br />=> <br />(j) <br />~ <br />I- <br />W <br />W <br />:r: <br />(j) <br />(j) <br />I <br />I- <br />Z <br />o <br />o <br />w <br />z <br />;;' <br />I- <br />Z <br />o <br />u <br /><( <br />I- <br /><( <br />o <br />"'- <br />o <br />w <br />'" <br />=> <br />(j) <br />g <br />u <br />(j) <br />Ci <br />'" <br />o <br />w <br />(j) <br />=> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Steven T. Downey, P.E. <br /> <br />Why Selected as Key Personnel for Contract <br /> <br />. Over 30 years Project Management <br />Experience on Civil and Structural Design <br />projects <br />. Safety Management Fixed-Price Task Order <br />contracts within Budget and Schedule <br /> <br />Education <br /> <br />B.E., Ci,'il/Structural Engineering, Vanderbilt, 1977 <br /> <br />Registrations <br /> <br />Professional Engincer: Ci,'il, SC, TN, FL: Pending <br />Contractor: AI" HI, r.[S, TN <br />Lead Related SupelTisor, 2003, LSP[-2203, Active, <br />Natiomvide, OS/2008 <br />,\sbestos Abatement Site Supen'isor, 2003, 108395, <br />!\cti,'e, Nationwide, 07/2007 <br />.\sbestos Building [nspcctor, 200-+, 1120-1-5, ,-\cti,'e, <br />Nationwide, 07 !2007 <br />!\sbcstos [\ lanagemcnt Planner, 200-1-, 1120-1--1-, Acti'T, <br />Nationwide, 07/2007 <br /> <br />Background Summary <br /> <br />Mr. Downey is a registercd profcssional engineer (SC, <br />TN, and FL-pending) and licensed contractor (IN, ,\1., <br />r.[S, and H[) with more than 29 ycars of design, <br />construction, projcct controls, and senior project <br />management experience at Dcpartment of Energy <br />(DOE), Department of Defense (DOD), and <br />commercial facilities nationwide. 0.[1'. Downey is listcd <br />in the National Registcr of \'\11O's W110 in Executives <br />and Professionals, 2005-200G. His managcmcnt <br />expertise includes sitc im'estigation, design, construction, <br />startup, and operation. Mr. Downey's design experience <br />includes hands on structural design utilizing hand <br />calculations and finite element computer analyses as well <br />as management of large design projects where he <br />managed as many as GO multidiscipline design <br />professionals. His construction cxperiencc includes <br />management of structural system installatiol1s at nuclear <br />power plants, waste processing facilities, storage vaults, <br />levces, earthen basins and treatment facilities. Mr. <br /> <br />I SHAW ENVIRONMENTAL, INC. <br /> <br />06C122006T <br /> <br />Downcy has managed projects ,'alued as high as S 1 00 <br />million. Mr. Downcy possesses a thorough knowledge <br />of cost and schedule control systems, and is familiar with <br />RCR,-\ and CERCL-\ regulations. His elwironmcl1tal <br />expericnce includes thrce years in high-Ie,'el radioactive <br />waste managemcnt and ten years in cm'ironmental <br />remediation ilwoking radioactive and hazardous <br />contamination and !\IEC a,'oidancc. !\[r. Downev is also <br />certificd as an Asbestos Abatement Supervisor, Lead <br />Abatement Supen'isor, Asbestos Inspector, and <br />Asbestos !\Ianagement Planner. <br /> <br />Relevant Experience <br /> <br />07/2000 - Present, Senior Project <br />Manager, Shaw Environmental & <br />Infrastructure, Inc. <br />Responsibilities include O\'erall project management and <br />supervision of project staff. !\[r. Downey is responsible <br />for successful cxecution of projccts within cost and <br />schedule budgets. He is also responsible for O\'erall <br />project safcty and (juality. Othcr rcsponsibilitics include <br />interfacing with client and regulator personnel as well as <br />reporting project status to clicnt and internal <br />management. <br /> <br />The following is a summary of key projects: <br />Project Manager, Plum Brook Ordnance Works <br />(PBOW), various task orders, USACE - Nashville <br />District, Sandusky, OH, OS/2002 - Present. <br />!\ lanaged 7 negotiated fixed-price task orders for the <br />PBO\\' site under this l\rchitectural and Engineering <br />SelTices IDIQ contract. Thesc projects included site <br />im'cstigations, groundwater fatc and transport modeling, <br />risk assessments, and preparation of Dccision <br />Document, Fcasibility Study, and Proposed Plan <br />documents. !\Ir. Downey also participates in Restoration <br />Advisory Board (IL\I3) meetings for this site. <br /> <br />:\ wards/ Clicnt Commendations: <br />President's Safety A ward for 2,000 days worked without <br />a lost timc accidcnt. <br /> <br />Senior Project Manager, West Virginia Ordnance <br />Works (WVOW), various task orders, USACE - <br />Nashville District, Point Pleasant, WV, OS/2002- <br />Present. !\Ianaged 19 negotiated fixed-price task orders <br />for the \WOW site under this Architectural and <br /> <br />STEVEN T. DOWNEY Q <br />