|
<br />.
<br />
<br />-'
<br />-<
<br />UJ
<br />a
<br />0-
<br />a
<br />'"
<br />0-
<br />UJ
<br />I
<br />>-
<br />u.
<br />a
<br />w
<br />CJ
<br />-<
<br />0-
<br />W
<br />..J
<br />>-
<br />>=
<br />w
<br />I
<br />>-
<br />z
<br />a
<br />z
<br />a
<br />>=
<br />u
<br />cr:
<br />>-
<br />UJ
<br />W
<br />'"
<br />W
<br />I
<br />>-
<br />a
<br />.~
<br />
<br /><Il
<br />::J
<br />UJ
<br />~
<br />>-
<br />w
<br />W
<br />I
<br />UJ
<br />UJ
<br />I
<br />>-
<br />z
<br />a
<br />a
<br />w
<br />z
<br />;:c
<br />>-
<br />z
<br />a
<br />u
<br />-<
<br />>-
<br />-<
<br />o
<br />u.
<br />a
<br />w
<br />'"
<br />::J
<br />UJ
<br />g
<br />U
<br />UJ
<br />o
<br />'"
<br />a
<br />w
<br />UJ
<br />::J
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />documentation of field activities associated with
<br />installation of temporary housing units and
<br />infrastructure at group, commercial and private sites.
<br />These design/build projects have included: site planning,
<br />NPDES permitting S\'(1)PP de\'elopment, sediment and
<br />erosion control, installation of site utilities, pump
<br />stations, wastewater treatment plants, asphalt and
<br />concrete pavement, ADA compliance, installation of
<br />trailers and modular structures, potable water quality
<br />testing, and other related activities. He performs quality
<br />assurance of operations and maintenance procedures
<br />and activities for compliance with technical exhibits,
<br />subcontract documents, and local and international
<br />building codes (IBC). O\'ersight of the central record
<br />file management system.
<br />
<br />Program Quality Control Manager, Kansas City
<br />Total Environmental Restoration Contract, U.S.
<br />Army Corps of Engineers - Kansas City District,
<br />Various, OS/2002 - Present. Responsible for
<br />development and implementation of the QC programs
<br />for all task orders performed under the KCTERC.
<br />Responsible for review and apprm'al of all task order
<br />deliverables. Assigning QC staff for task order projects
<br />and prm'iding program spccific (~C training. SenT as
<br />Shaw's point-of-contact with US" \CE personnel for
<br />program and task order QC issues.
<br />
<br />Accomplishments:
<br />Developed QC programs for all of the KCTERC task
<br />orders. Re\'ie\ved and appro\'ed ()\'cr 200 plans and
<br />reports associated with execution of task orders.
<br />
<br />A wards/ Client Commendations:
<br />Received President's and Vice President's Safety a\vards
<br />for \'arious KCTERC task orders.
<br />
<br />QC Manager/Field Engineer, Former Naval
<br />Ammunition Depot - Hastings, U.S. Army Corps of
<br />Engineers - Kansas City District, Hastings, NE,
<br />11/2000 - 10/2004. Responsible for overall
<br />implementation of the QC program during removal of
<br />surface soil contaminated with lead, explosi\'es, and
<br />carcinogenic polycyclic aromatic hydrocarbons.
<br />Responsible for oversight of soil and liquid sampling,
<br />waste handling and disposal, site restoration, and
<br />remedial action and removal action reports. Served as
<br />Shaw's QC point-of-contact with the USACE and
<br />
<br />I SHAW ENVIRONMENTAL, INC.
<br />
<br />06C122006T
<br />
<br />regulators Q\'erseeing surface soil remediation and non-
<br />time critical removal actions.
<br />
<br />Accomplishments:
<br />Completed three surface soil remQ\'al projects on
<br />schedule and under budget.
<br />
<br />A wards/ Client Commendations:
<br />Received USACE Project L\lanager accommodation
<br />letters for the Site 4 and Residential surface soil
<br />remediation projects.
<br />
<br />QC Manager/Project Engineer, Phase I - Barracks
<br />Renewal Program, USACE, Fort Leavenworth, KS,
<br />08/2000 - 12/2000. Responsible for developing,
<br />submitting, and tracking all contract deliverables for soil
<br />cut/ fill and surcharge operations, remo\'al and
<br />replacement of a 12 inch gas main, extension of the
<br />sanitary sewer and potable water system and high \'oltage
<br />line relocation. Responsible for implementation of
<br />US;\CE three-phase inspections, day-to-day direction to
<br />subcontractors, development of field \vork \'ariances and
<br />modifications, record as-built dra\vings, scheduling and
<br />itl\'oicing through the USACE QCS computer program.
<br />
<br />i\ccomplishments:
<br />Completed \vork on schedule within allotted budget.
<br />
<br />QC Manager/Project Engineer, New Gymnasium
<br />Construction, USACE, \Vhiteman Air Force Base,
<br />MO, 06/2000 - 08/2000. Responsible for c!e\'eloping,
<br />submitting, and tracking all contract deli\'Crables for
<br />construction of a new gymnasium which included all
<br />civil, HV AC, plumbing, electrical, structural,
<br />architectural and sporting equipment. US"-\CE QCS
<br />computer program was utilized for tracking submittals,
<br />cost and scheduling, invoicing and daily reports.
<br />
<br />[\ccomplishments:
<br />Completed submittal of contract deliverables and
<br />received approval from US,\CE.
<br />
<br />QC Manager/Field Engineer, Operable Unit 3
<br />Groundwater Treatment System" U.S. Army Corps
<br />of Engineers - Savannah District (SADTERC),
<br />Milan Army Ammunition Plant, TN, 02/1997 -
<br />09/1998. QC L\Ianager/Field Engineer for construction
<br />of the 1300 GPt\[ OU-3 groundwater treatment system
<br />at the Milan Army Ammunition Plant under the USACE
<br />
<br />I KARL A. EISENHART D
<br />
|