Laserfiche WebLink
<br />. <br /> <br />...i <br /><< <br />IJJ <br />a <br />a. <br />a <br />a:: <br />a. <br />IJJ <br />I <br />f- <br />u.. <br />a <br />w <br />'" <br /><< <br />a. <br />~ <br />f- <br />>= <br />W <br />I <br />f- <br />Z <br />a <br />z <br />a <br />>= <br />() <br />C< <br />f- <br />IJJ <br />W <br />a:: <br />w <br />I <br />f- <br />a <br /> <br />.~ <br />!D <br />::J <br />IJJ <br />!Q <br />f- <br />W <br />w <br />I <br />IJJ <br />IJJ <br />I <br />f- <br />Z <br />a <br />o <br />w <br />Z <br />::;: <br />f- <br />Z <br />a <br />() <br /><< <br />f- <br /><< <br />o <br />u.. <br />a <br />w <br />a:: <br />::J <br />IJJ <br />'3 <br />() <br />IJJ <br />Ci <br />a:: <br />a <br />w <br />IJJ <br />::J <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />Savannah TERC Contract. Responsible for <br />development and implementation of the QC program <br />for all construction and drilling activities. Coordinated <br />all on-sitc and off-site testing and analytical activitics to <br />support construction and wastc disposal activities. <br />Served as Shaw's QC point-of-contact with US,\CE's <br />personnel overseeing constmction activities. Prepared <br />and coordinated submittal of all contract related <br />delinrables including the record as-built drawings. <br /> <br />Accomplishments: <br />Successfully completed constmction of the plant and the <br />plant effluent met the surface \vater discharge <br />requirements per the NPDES permit. <br /> <br />A wards/ Client Commendations: <br />Project rccci\"Cd a "Celebrate Safety" a\V'ard from the <br />USACE t\[obile District. <br /> <br />QC Manager, Site Remediation - Presidio of San <br />Francisco, , U.S. Army Corps of Engineers - <br />Sacramento District (SACTERC), San Francisco, <br />CA, 01/1996 - 02/1997. Responsible for onrall <br />implementation of the QC program during removal of <br />over --1-0 ,\STs and USTs, rcmonl of over 25,000 feet of <br />the fuel distribution system pipeline, soil and liquid <br />sampling, \vaste handling and disposal, site restoration, <br />site investigations and closure reports. Served as QC <br />point-of-contact with the USI\CE and National Park <br />SetTice representati,"es O\Trseeing remediation and <br />abatement acti,'ities. <br /> <br />Accomplishments: <br />Completed tasks within budget and on schedule. <br /> <br />QC Manager/Fie[d Engineer, UST Removals - <br />Former Stead Air Force Base, , U.S. Army Corps of <br />Engineers - Sacramento District (SACTERC), <br />Reno, NV, 08/1995 - 10/1995. Oversaw removal of <br />m"er 100 underground storagc tanks (USTs), soil and <br />waste disposal sampling, waste disposal, site restoration <br />and closure reports. SetTed as point-of-contact with <br />county and state em"ironmental personnel overseeing <br />UST remm"als. <br /> <br />Accomplishments: <br />Completed removal activities ahead of schedule within <br />the budget. <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />06C122006T <br /> <br />QC Manager/Field Engineer, Williams Air Force - <br />Landfill LF-04 Capping, , Air Force Center for <br />Environmental Excellence (AFCEE) - Site Capping <br />Contract, Mesa, AZ, 02/1995 - 07/1995. Ovcrsawall <br />aspects of work acti\"ities during the installation of a <br />pcrmcable cap m"er the 3--1- acrc landfill site, excavation <br />over 109,000 cubic yards of soil from a 4,200 ft. long <br />drainage channel, and the constmction of a 338 ft. long <br />reinforced concrete retaining wall. \';rork on drainage <br />channel and retaining wall was performed in accordancc <br />with the Maricopa County Specifications for Public <br />\,forks Constmction. <br /> <br />Accomplishments: <br />Completed the project 3 months ahead of schedule and <br />over S300,OOO below budget. <br /> <br />QC Manager/Field Engineer, Landfill (LF-03) <br />Closure, Air Force Center for Environmental <br />Excellence (AFCEE) - Site Capping Contract, <br />Warner Robins Air Force Base, GA, 10/1994 - <br />02/1995. Served, as IT's point-of-contact for QC and <br />field enginecring during the installation of geosynthetic <br />clay lincr, GO-mil HOPE liner, drainage geocomposite <br />and soil cmTr m"cr ] ,and fill LF-03. Prm"ided da\.-to-da\" <br />. . <br /> <br />direction to geotechnical, SutTey, ci,"il and mechanical <br />subcontractors. <br /> <br />Accomplishmcnts: <br />Succcssfully coordinated field modifIcations relatcd to <br />elimination of sand drainagc laycr and replaccment with <br />drainagc geocomposite layer. <br /> <br />KARL A. EISENHART 3 <br />