Laserfiche WebLink
<br />. <br /> <br />-' <br />0{ <br />VJ <br />a <br />a. <br />a <br />'" <br />a. <br />VJ <br />I <br />>- <br />u. <br />a <br />UJ <br />co <br />0{ <br />a. <br />~ <br />>- <br />>= <br />UJ <br />I <br />>- <br />Z <br />a <br />z <br />a <br />>= <br />u <br />ii: <br />>- <br />VJ <br />UJ <br />'" <br />UJ <br />I <br />>- <br />a <br />>- <br /> <br />.~ <br />VJ <br />!!l <br />>- <br />UJ <br />UJ <br />I <br />rJ) <br />VJ <br />I <br />>- <br />z <br />a <br />o <br />UJ <br />z <br />;;: <br />>- <br />z <br />a <br />u <br />0{ <br />>- <br />0{ <br />o <br />u. <br />a <br />UJ <br />'" <br />:::l <br />VJ <br />a <br />-' <br />u <br />VJ <br />o <br />'" <br />a <br />UJ <br />VJ <br />:::l <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />prm'idecl support for construction and station <br />commlsslon1l1g. <br /> <br />Project Manager, Maine Yankee Atomic Power <br />Station, Maine Yankee Atomic Power Company, <br />Barth, ME, 02/1996 - 01/1997. Design and <br />construction of modifications to nuclear plant. <br /> <br />Accomplishments: <br /> <br />Directed the onrall electrical and control design of <br />modifications to the Atmospheric Steam Dump and the <br />High Energy Line Break Systems. <br /> <br />Project Manager, Millstone Nuclear Plant Units #2 <br />& 3, Northeast Utilities, CT, 09/1995 - 01/1996. <br />Perform and update calculations for major electrical <br />eqU1pment. <br /> <br />Accomplishments: <br />Re\.iewed calculations for sizing im'erters and \.ital bus <br />feeder cables for Unit 3. He also performed a dynamic <br />analysis of the ..J- k\' and 6 k\' safcty relatcd motors <br />under accident conditions, for Unit 2, using the E'L\P <br />computer program. <br /> <br />Project Manager, Hawks Nest-Glen Ferris Hydro <br />Plants, Union Carbide, Glen Ferris, WV, 03/1975 - <br />11/1975. Feasibility study for expanding existing hydro <br />plants. <br /> <br />i\ccomplishments: <br />Pcrformed a study to detcrmine the feasibility of <br />expanding the hydroelectric gcncrating capacity of the <br />existing Hawks Nest and Glen Ferris plants up to 40 <br />1\[\'\'. Prepared alternate schemes for 25 Hz and 60 Hz <br />generation and order-of-magnitude construction cost <br />cstimates for the most promising arrangements, <br />including transmission and switching facilities. <br /> <br />Senior Electrica[ Engineer, Reliability Improvement <br />Program, Fortune 500 Telecommunications <br />Company, Boston, MA, 09/1995 - 12/1995. <br />E\'aluation of the elcctrical distribution system at scveral <br />sites of a Telecommunication Company <br /> <br />Accomplishments: <br />Performed short circuit calculations, evaluated the <br />design adequacy of the electrical distribution system at <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />06C 122006T <br /> <br />several sites, and made recommendations for <br />Improvements. <br /> <br />Project Manager, Comanche Peak Stearn Electric <br />Station, Unit 1, Texas Utilities, Dallas, TX, 06/1986 <br />- 12/1988. Reviewed major electrical calculations. <br /> <br />Accomplishments: <br />Reviewed major electrical calculations and system design <br />for the sequential loading of the emergency diesel <br />generators, DC batteries and battery chargers, short <br />circuit, and \'oltage profile calculations. Validated the <br />entire plant lighting system, including IOCFR50 <br />.Appendix "R" recluirements. <br /> <br />12/1988 - 09/1995, Lead Electrical <br />Engineer, NStar (previously Boston <br />Edison Company), Project Engineering <br />Department, Boston, MA <br />As Lcad Elcctrical Enginecr 1\[r. Eskinazi dirccted and <br />supen'ised the Electrical Group \vhich was accountable <br />for the engineering, procuremcnt, and installation of thc <br />electrical work in support of the l\fystic and Ne\v Boston <br />fossil stations, and the l\fedway combustion turbine <br />stations. Thc \vork includcd implementing state-of-thc- <br />art technologies for data acquisition, communication, <br />protective relaying, large adjustable speed dri\'es (ASD), <br />UPS, 13.8 k\',..J- k\', and ..J-80 V s\vitchgear, motors, and <br />powcr distribution systems. Pcrformed load flow, <br />voltage profile, and short circuit calculations, using thc <br />DAPPER and i\-Fault programs. <br /> <br />Electrical Engineering, Pilgrim Nuclear Station, <br />Pilgrim Nuclear Station, Plymouth, MA, 12/1988 - <br />12/1991. Provided electrical support to the operation of <br />the Pilgrim Nuclcar Station. <br /> <br />Accomplishments: <br /> <br />1\fanaged several modifications at the Pilgrim Nuclear <br />Station which brought the unit in sen'ice after the NRC <br />shutdown. Designed a radio transfer scheme to test the <br />diesel generator and other modifications in compliance <br />with Station Blackout Rulc IOCFR50.G3. <br /> <br />NESSIM S. ESKINAZI <br /> <br />3 <br />