Laserfiche WebLink
<br />e <br /> <br />u. <br />o <br />w <br />" <br /><( <br />a. <br />':i <br />>- <br />;:: <br />W <br />I <br />>- <br />Z <br />o <br />Z <br />o <br />;:: <br />u <br />ii' <br />>- <br />VJ <br />W <br />'" <br />W <br />I <br />>- <br />o <br />>- <br />ei <br />VJ <br />~ <br />>- <br />W <br />W <br />I <br />VJ <br />VJ <br />I <br />>- <br />z <br />o <br />o <br />w <br />z <br />;;' <br />>- <br />z <br />o <br />u <br /><( <br />>- <br /><( <br />o <br />u. <br />o <br />w <br />'" <br />:::> <br />VJ <br />o <br />..J <br />U <br />VJ <br />o <br />'" <br />o <br />w <br />VJ <br />:::> <br /> <br />e <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />John W Finik, P.E. <br /> <br />Education <br />B.S., Ci\'il Engineering, Columbia Uni,"ersity, 1980 <br />1L\., Mathematics, Bowdoin College, 1978 <br /> <br />Registrations <br />Professional Engineer: Structural, NH <br /> <br />Background Summary <br /> <br />i\Ir. Finik is a Project i\Ianager and Professional <br />Engineer with more than 26 years of engineering, design, <br />and consulting and project management experience with <br />increasing responsibility gained from a broad range of <br />assignments. He has both performed and directly <br />supelTised engineering, design and construction phase <br />tasks for a variety of utility, municipal, infrastructure and <br />transportation projects. These tasks have included <br />management consulting, operations and maintenance <br />(O&[-..Q consulting, inspection/ e,"aluation of existing <br />facilities, preparation of needs analyses/ feasibility <br />studies, site selection studies and conceptual layouts; the <br />preparation of specifications, contract and bid <br />documents, design calculations, and engineering and <br />construction cost estimates; and the preparation of both <br />manually drafted and C\DD-generated construction <br />drawings. He is also experienced in construction phase <br />engineering, including the preparation of design changes <br />and the evaluation of contractor change recluests and <br />claims, with emphasis on configuration management and <br />claims avoidance. i\S a Project [-..Ianager in the <br />Transportation Department, he is responsible for the <br />day-to-day administration of a ,'arious multidiscipline <br />engineering consulting selTices contracts. His <br />responsibilities include identifying and cultin ting <br />potential new ,vork; developing proposals and <br />presentations; providing technical and administrative <br />direction; coordinating engineering, scope development, <br />schedules, and budget control; cJuality reviews of <br />engineering products; and managing subconsultant <br />services, all under various contract terms including Cost <br />Plus/NTE, Lump Sum and Indefinite Quantity (Task <br />Order) bases. <br /> <br />Among i\Ir. Finik's specialties are the execution of <br />General Engineering Consulting (Indefinite <br /> <br />I SHAW ENVIRONMENTAL. INC. <br />06C122006T <br /> <br />Ouantit:v/Task Order/On-Call SelTices) contracts, and <br />'- ~ <br />the management of facility design projects. [n both <br />cases, his breadth of experience in all project phases, <br />familiarity \vith technical, commercial and construction <br />processes, and his ability to cJuickly mobilize the <br />necessary project resources and to effecti,"ely manage <br />multidiscipline, multi-firm teams has allowed Shaw to be <br />responsive to client needs while completing and <br />deliYering quality products on schedule and within <br />budget. <br /> <br />His facilities experience has been gained in the <br />transportation, utility, institutional and commercial <br />sectors, and ranges from light construction (office <br />buildings, parking garages, hospitals, warehouses and <br />outdoor commuter stations) to hea,"y construction, <br />including ,vater intake structures, hydro powerhouses, <br />higl1\vay and rail tunnel systems, and industrial-gradc <br />maintcnance facilities. <br /> <br />[-,,11'. Finik's power industry experience includes nuclear, <br />fossil (coal and gas), and h~'droclectric pO\ver projects, <br />where his rcsponsibilities hm"e included power plant <br />design (new concrete and steel structures, modifications <br />to existing structures, and seismic design/ qualification of <br />structures and electrical raccwa," s\'stcms) and <br />undcrground transmission projects. His infras tructurc <br />engineering experience has been gained from projects <br />related to highway, transit and raihvay engineering, <br />maintenance and warehousing facilities, and <br />transportation agency operations. He has becn <br />responsiblc for a wide variety of tasks for a number of <br />maintenance facility projects for commuter rail and light <br />rail \'Chicles, buses, and higll\vay departmcnt \"ehicles. <br /> <br />Relevant Experience <br />Project Manager I, Shaw Environmental & <br />Infrastructure, Inc. <br />Responsible for the day-to-day administration of a <br />various multidiscipline engineering consulting selTices <br />contracts. Responsibilities include identifying and <br />cultivating potential new work; developing proposals and <br />presentations; prO\"icling technical and administrative <br />direction; coordinating engineering, scope development, <br />schedules, and budget control; quality reviews of <br />engineering products; and managing subconsultant <br />services, all under various contract terms. <br /> <br />JOHN W FINIK Q <br />