Laserfiche WebLink
<br />. <br /> <br />..i <br />'" <br />(/) <br />o <br />0. <br />o <br />'" <br />0. <br />(/) <br />I <br />I- <br />u. <br />o <br />w <br />" <br />'" <br />0. <br />"j <br />I- <br />>= <br />W <br />I <br />I- <br />Z <br />o <br />Z <br />o <br />>= <br />u <br />0:: <br />l- <br />(/) <br />W <br />'" <br />W <br />I <br />I- <br />o <br /> <br />.~ <br />=> <br />(/) <br />'!l <br />I- <br />W <br />W <br />I <br />(/) <br />(/) <br />I <br />I- <br />Z <br />o <br />o <br />w <br />z <br />:;;: <br />I- <br />Z <br />o <br />u <br />'" <br />I- <br /><( <br />o <br />u. <br />o <br />w <br />'" <br />=> <br />(/) <br />g <br />u <br />(/) <br />o <br />'" <br />o <br />w <br />(/) <br />=> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />route evaluation, drainage considerations, permitting <br />feasibility, land taking e\'aluation, and alternatiH <br />analysis. <br /> <br />Senior Civil/Structural Engineer, Nantucket <br />Composting Facility, Waste Options, Nantucket, <br />MA, 03/1997 - 06/1998. The project consisted of the <br />engineering, procurement, and construction of a <br />composting facility on the island of Nantucket. The <br />facility consisted of a large rotating digester, a fabric <br />structure compost building, a biofilter building, and the <br />associated site\vork. t--[r. Fairbanks' responsibilities <br />included the engineering and procurement of the fabric <br />structures and their foundations as well as site <br />de\'elopment and construction phase services. <br /> <br />Senior Civil/Structural Engineer, United Parcel <br />Service Windsor Locks, United Parcel Service, <br />Windsor Locks, CT, 05/1992 - 06/1993. The project <br />consisted of the extension of taxiways and ramps to <br />sen'ice a new UPS warehouse facility adjacent to the <br />airport. Also included were drainage design and a glycol <br />reowery system. t--[r. Fairbanks prm'ided civil and <br />structural engineering support during the design and <br />construction phase. <br /> <br />Senior Civil/Structural Engineer, Town of <br />Middleborough GIS, Town of Middleborough, <br />Midd[eborough, MA, 08/1987 - 10/1988. The project <br />consisted of creating a digital mapping system for the <br />town. !\lr. Fairbanks worked close1\- with the to\vn and <br />aerial photogrammetry subcontractor in the <br />development of the data and structure for the basic <br />geographic information system. <br /> <br />Senior Civil/Structural Engineer, Town of Medway <br />Mapping, Town of Medway, Medway, MA, 02/1986 <br />- 07/1987. The project consisted of aerial <br />photogrammetry and digital mapping of the town of <br />Medway, M1\. !\lr. Fairbanks responsibilities included <br />working with the photogrammetry subcontractor and <br />compiling the information to be included in the mapping <br />files to be delivered to the town. <br /> <br />Senior Civil/Structural Engineer, Bridgeport <br />Harbor Generating Station Coal Conversion Project, <br />United Illuminating Company, Bridgeport, CT, <br />02/1982 - 03/1983. The project consisted of converting <br />the plant from burning oil to burning coal. t--Ir. <br /> <br />SHAW ENVIRONMENTAL. INC. <br /> <br />06C122006T <br /> <br />Fairbanks responsibilities included the engineering and <br />procurement of the site ci\'il contract, structural steel <br />platform modifications, and general ci\'il/ structural <br />support for the project. <br /> <br />Senior Civil/Structural Engineer, Malakoff <br />Generating Station, Houston Power & Light, <br />Malakoff, TX, 09/1980 - 02/1982. Project consisted of <br />the design of the 600 t\l\V lignite-burning power <br />generation station. !\lr. Fairbanks \vas responsible for <br />the engineering and procurement of the miscellaneous <br />buildings and their reinforced concrete foundations. <br /> <br />Senior Civil Engineer, Patriot Generating Station, <br />Indiana Power & Light, IN, 05/1980 - 09/1980. <br />Project consisted of the design of the fossil powered <br />generating station. l\Ir. Fairbanks contributed to the <br />generation of the estimate for the fossil powered <br />generating station including structural steel and <br />reinforced concrete sizing and estimating. <br /> <br />ANDREW K. FAIRBANKS 3 <br />