Laserfiche WebLink
<br />. <br /> <br />-' <br />0< <br />rn <br />o <br />"- <br />o <br />a:: <br />"- <br />rn <br />I <br />>- <br />~ <br />w <br />'" <br />0< <br />"- <br />':J <br />>- <br />>= <br />W <br />I <br />>- <br />Z <br />o <br />z <br />o <br />>= <br />u <br />ir <br />>- <br /><f) <br />w <br />a:: <br />w <br />I <br />>- <br />o <br />>- <br /> <br />.~ <br />rn <br />!Q <br />>- <br />w <br />W <br />I <br /><f) <br /><f) <br />I <br />>- <br />z <br />o <br />o <br />w <br />z <br />:;: <br />>- <br />z <br />o <br />U <br />0< <br />>- <br />0< <br />o <br />u. <br />o <br />w <br />a:: <br />=> <br />rn <br />g <br />u <br />rn <br />o <br />a:: <br />o <br />w <br />rn <br />=> <br /> <br />. <br /> <br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES <br /> <br />manpower and the analytical aspects for the assessment <br />of over 20 sugar farms as part of the Everglades Forever <br />Act. Once assessment activities were completed, ~Ir. <br />Kramer formulatcd a remedial strategy that \vould allow <br />the state to grant a SRCO. Contaminants of Concern at <br />the sitcs included arscnic, chromium, Icad, pctroleum <br />hydrocarbons and pesticides. All farms were assessed <br />and remediated within the proposed schedule and <br />budget. <br /> <br />04/1996 - 10/1998, Project <br />Manager/Engineer, OHM Remediation <br />Services Corp., Clermont, FL <br />Project Engineer Downtown Orlando Chlorinated <br />Solvent Project: Project engineer for the constmction <br />of a soh-ent remediation s\'stem in dO\vntO\vn Orlando. <br />Responsibilities included development/ certification of a <br />~IOT, roadway replacement design and construction, <br />coordination with FOOT & City of Orlando, <br />supetTising and dirccting 4,000 fcct of dircctional <br />drilling, procurement of a below grade railroad crossing <br />pcrmit, ,'ault layout and constmction, pipe fusing, <br />equipment selection and procurement and system layout. <br />Coordinated all drilling activities and utility conflicts. <br />Pcrformed systcm operational testing, which includcd <br />PLC controlled VFD pump and motors, air strippcr <br />modification and startup testing. <br /> <br />Project Manager/Engineer, FDOT Sites, <br />Jacksonville, FL: ~Ir. Kramcr sctTed as projcct <br />manager and engineer for petroleum-impacted sites in <br />the FOOT 2 right of way. He designed remedial <br />systems that incorporated groundwater recovery, air <br />sparge injcction/vacuum extraction, HOPE barrier liner <br />installation, horizontal rccovery wells and bio-piles. He <br />supelTised construction of remedial systems and wrote <br />RAPs summarizing the remedial design and supervised <br />constmction of the remedial systems. Mr. Kramer's <br />work for the District also includes general civil <br />construction work, which was used during the <br />demolition of the Duvall Street Bridge. <br /> <br />Project Manager/Engineer, FDOT District I <br />EMO: tvIr. Kramer was responsible for identifying <br />potential environmental impacts to roadway activities. <br />Once potential impacts to roadway work were identified, <br />Mr. Kramer formulated an investigative plan and <br />coordinated implementation of the work. During his <br /> <br />work for FOOT District I work he has successfully <br />removed numerous underground storage tanks, designed <br />and implemented remedial strategies that mitigated <br />impact to roadway construction acti,'itics installcd piping <br />and rcplaced pa,'cment. As project manager he cithcr <br />wrote or revicwed reports documcnting thc work <br />whether investigative or remedial in nature. As a <br />registered professional engineer Mr. 1vamcr confers <br />with the FDEP or local environmental regulatory agency <br />as needed to ensure environmcntal activities will not <br />create future liabilities for the District at a later date. Mr. <br />Kramcr's practical approach to soh'ing complcx <br />cnvironmental impacts to road,vay constmction rcduces <br />costs, while providing solutions. <br /> <br />Project Manager/Engineer; FDOT District VII: <br />r.1ost of the work pcrformed by r.1r. Ivamer in this <br />District was in a high population density area with <br />residcntial ncighborhoods nearby the impacted arca. <br />This fact created ne\v challenges associated \vith <br />formulating and implementing a remedial strategy. [n <br />addition to standard dewatering and impacted soil <br />exca,'ation, r.1r. Ivamer employed dircctional drilling, <br />wastc solidification and disposal, and rcmedial dcsign <br />based on groundwater modcling of the contractor <br />dewatering systcm to achie,'e the District's goals. r.1r. <br />Kramer also performed regulatory coordination of thc <br />cnvironmental aspects of the Districts road\vay work. [n <br />addition, r.[r. Kramer wrote and/ or revie\ved all reports <br />and documentation regarding site illYestigati,'e and <br />remedial acti,.ities, which was forwarded to the FDEP <br />and local county environmental regulatory programs <br />when appropriate. <br /> <br />Project Engineer; Morris Road Landfill, <br />Jacksonville: ~1r. lvamer provided engineering <br />support for the construction of a groundwater <br />remediation system. The remedial system included <br />groundwater recovery wells, controls, water treatment <br />system, connection to sanitary pipe for discharge, as well <br />as detcntion pone\. This project required considerable <br />planning and engineering due to the site topography, <br />proximity of residential development and length of <br />piping. During construction of the remedial system Mr. <br />1vamcr interfaced with local, state and client <br />representatives to permit the proposed construction and <br />maintain good lines of communication. <br /> <br />SHAW ENVIRONMENTAL, INC. <br /> <br />2 <br /> <br />ERIC K. KRAMER, P.E. <br /> <br />06C122006T <br />