|
<br />e
<br />
<br />ei
<br />
<br />V)
<br />!!2
<br />t-
<br />UJ
<br />UJ
<br />I
<br />V)
<br />V)
<br />I
<br />t-
<br />Z
<br />o
<br />o
<br />UJ
<br />z
<br />4'
<br />t-
<br />Z
<br />o
<br />u
<br /><<
<br />t-
<br /><<
<br />o
<br />"-
<br />o
<br />UJ
<br />0::
<br />::J
<br />V)
<br />g
<br />u
<br />V)
<br />o
<br />0::
<br />o
<br />UJ
<br />V)
<br />::J
<br />
<br />.
<br />
<br />SOUTH FLORIDA WATER MANGEMENT DISTRICT GENERAL ENGINEERING SERVICES
<br />
<br />CERCLA-compliant Five- Year Re\'iew at the site for
<br />USEPA and Operation and Maintcnance of the sitc
<br />under l\lassachusetts Department of Environmental
<br />Protection.
<br />
<br />...i
<br /><<
<br />V)
<br />o
<br />a.
<br />o
<br />0::
<br />a.
<br />V)
<br />I
<br />t-
<br />"-
<br />o
<br />UJ
<br />'"
<br /><<
<br />a.
<br />UJ
<br />-'
<br />t-
<br />t=
<br />UJ
<br />I
<br />t-
<br />Z
<br />o
<br />z
<br />o
<br />t=
<br />u
<br />ii'
<br />t-
<br />V)
<br />UJ
<br />0::
<br />UJ
<br />I
<br />t-
<br />o
<br />t-
<br />
<br />l\ls London also has extensivc experience in
<br />em'ironmental compliance during construction and
<br />construction management. On the Boston Harbor
<br />Project, she directed Ci\I staff performing environmcntal
<br />compliance inspections and permit monitoring, which
<br />included NPDES rcporting, and noise, and traffic
<br />monitoring to maintain compliancc with mitigation
<br />agreements and pcrmit conditions. She was also
<br />rcsponsible for verifying that construction contractors
<br />were in compliance with contract requirements
<br />pertaining to issues such as hazardous waste
<br />management, noise, erosion and sedimentation control,
<br />etc. Similarly, Ms. London managed the Environmental
<br />Compliance Program for a water supply project
<br />cncompassing 18 milcs of decp rock tunnel, ..J- major
<br />shaft locations, se\'cral drop shaft locations and 2
<br />co\'ered storage locations. Shc is currently managing the
<br />cnvironmental compliance program for the North
<br />Dorchester Bay CSO Projcct for thc l\lassachusetts
<br />\,\'atcr Resourccs :\uthority.
<br />
<br />Relevant Experience
<br />01/1981 - Present, Lead Environmental
<br />Scientist, Shaw Environmental &
<br />Infrastructure, Inc.
<br />Environmental Compliance Manager, North
<br />Dorchester Bay CSO Tunnel, Massachusetts Water
<br />Resources Authority, Dorchester, MA, 12/2005 -
<br />Present. :\s Environmental Compliance Manager,
<br />responsible for ensurc contractor compliance with all
<br />cnvironmental permit conditions, regulations and
<br />commitments for this SlOO million constmction project
<br />which includes an 8,500-linear foot (If) long, 20-foot
<br />diameter, precast lined soft-ground tunnel mincd with an
<br />earth pressure balance machine (EPBl\f) undcr Boston
<br />city streets. Work also includes the constmction of
<br />seven cut and cover di\'ersion stmctures, a 100 million
<br />gallons per day (mgd) pump station, an odor control
<br />facility and the installation of approximately 5,625 If of
<br />IO-inch diameter ductile iron cement mortar lined
<br />(DICL) force main to be constmcted in tight urban
<br />street and utility settings. Reviewed at 90%, 100% and
<br />
<br />SHAW ENVIRONMENTAL, INC.
<br />
<br />06Ct22006T
<br />
<br />Bid Construction Specifications and prm'ided comments
<br />to thc design engineer. Revicwcd and commented on
<br />contractor submittals for materials handling, erosion and
<br />sedimcntation control, noise, hazardous materials, storm
<br />water, etc. Also responsiblc for managing thc
<br />cnvironmental inspection staff and resoking all
<br />em'ironmental non compliance issues.
<br />
<br />Project Manager, Nyanza Chemical Waste Dump
<br />Superfund Site, 111351, Massachusetts Department
<br />of Environmental Protection, Ashland, MA, 10/2004
<br />- Present. Coordinates quarterly inspection /
<br />maintenancc and semi-annual grounchvatcr monitoring
<br />activities at the Nyanza Chemical Waste Dump
<br />Superfund Site to ensure that the Remedy at the site is
<br />functioning as recluired. Each inspection includes
<br />conducting routine maintenancc and recommendations
<br />for repairs. :\n Inspection Report is prcpared and
<br />submitted to MADEP for approval. Grouncl\\;ater
<br />Sampling is conductcd on 16 \vclls and the terminal
<br />manhole. Surfacc water sampling, scdimcnt sampling
<br />and soil sampling arc also conducted periodically.
<br />Samples are validatcd and a sampling report is prcparcd
<br />for l\L\DEP review following each e\'ctlt. :\Iso managcs
<br />long-tcrm wctland monitoring at the sitc to \'crify thc
<br />functionality and cstablishmcnt of wetland arcas.
<br />
<br />DRC Manager, Hurricane Rita Disaster Relief
<br />Contract, FEMA, Liberty TX, 10/2005 - 10/2005.
<br />l\Ianaged operations and logistics of thc Disaster
<br />Rcgistration Center in Liberty Texas follmving Hurricanc
<br />Rita. In coordination with FEMA, setup and managed a
<br />mobile center which included Small Busincss
<br />Administration, crisis counseling, and State of Texas
<br />Emergency Rcsponse Team. Assistcd victims with
<br />application processing, status follow up, ami other
<br />disaster relief serviccs. Supervised and managed
<br />temporary labor force; mobile living units for staff and
<br />all equipment (computer banks, satellite phonc system,
<br />trailer units, etc) and logistics for and demobilization of
<br />the mobile unit. Interfaced effectively with Federal, state
<br />and county emergcncy management personnel in the
<br />daily operations of the unit. Provided reporting to Shaw
<br />Houston Office f\lanagement Information Center and
<br />FEMA documenting daily site activities, statistics, safety
<br />issues and unit needs.
<br />
<br />EILEEN M. LONDON
<br />
<br />2
<br />
|