Laserfiche WebLink
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for Each key person) <br />13. ROLE IN THIS CONTRACT <br />CiviVEnvironmental Engineering <br />Project Engineer <br /> <br />a. TOT AI. <br /> <br />14. YEARS EXPERIENCE <br />n. WITH CURRE"T IlRMS <br /> <br />Gabriel Milian, P.E. <br />5. FIRMS NAME AND LOCATION (CiTy and STaTe) <br />. 1ilian Swain & Associates Inc.. Miami Florida <br />16. EDUCATION (DEGREE AND SPECIALlZ4 TlON) <br />Master of Environmental Engineering - University of Texas <br />at Austin - 2002 <br />Bachelor of Civil Engineering - University of Miami - 2001 <br />Bachelor of Environmental Engineering - University of <br />Miami - 2001 <br />University of Miami, Bachelors of Civil En ineerin , 1987 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (PublicaTions. Organizarions. Training. awards eTc.) <br />. American Society of Civil Engineers <br />. XP SWMM Certified <br /> <br />4.5 <br /> <br />4.5 <br /> <br />17. CURRENT PROr"ESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Florida Professional Engineer No. 65927 <br /> <br />19. RELEVANT PROJECTS <br /> <br />. <br /> <br /> (I) TITLE AND LOCATION (CiTy and STare) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTR UCTION (~( applicable) <br /> Miami-Dade County Park and Recreational Dept - Matheson <br /> Hammocks Park - Parking Maintenance Facility Relocation, Miami, FI On-going N/A <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. COST. eTc.) and SPECIFIC ROLE 121 Check if project performed with current firms <br /> Project engineer responsible for the Environmental Engineering and Permitting services provided for the construction of a new <br /> maintenance facility within the boundaries of the Matheson Hammocks Park, including regulatory process thru DERM, EQCB and <br /> ACOE for mangroves mitigation. <br /> Project Cost: $44,000 <br /> (I) TITLE AND LOCATION (Cit\' and STare) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTR UCTION (I(applicable) <br /> Miami-Dade County Park and Recreational Dept - Tree Island Park <br /> Project - Miami, Florida On-going N/A <br />b. (3) BRIEF DESCRIPTION (Brie.fscope. size. COST. eTc.) and SPECIFIC ROLE 121 Check if project performed with current firms <br /> Project engineer for the civil and environmental engineering services that are being provided to the Miami-Dade County Parks and <br /> Recreation Department. This Department requires assistance to prepare and process the environmental permits required to develop <br /> the Tree Island Park located south of SW 10th Street between SW ] 49th A venue and SW 147th A venue. <br /> Project Cost: $133,516 <br /> (1) TITLE AND LOCATION (Ciry and STaTe) (2) YEAR COMPLETED <br /> Miami-Dade County Park and Recreational Dept - Design of Phase I PROFESSIONAL SERVICES CONSTRUCTION (~( applicable) <br /> Deering Glade Rehydration Improvements - Miami, Florida 2002 N/A <br /> (3) BRIEF DESCRIPTION (Brie(scope. size. cosT. eTC.) and SPECIFIC ROLE 121 Check if project performed with current firms <br />c. <br /> Prepared the site plan and selected the site for the proposed adjustable weir structure associated with the project. Designed this <br /> broad crested concrete weir to partially rehydrate the existing glade and reduce salt water intrusion. As part of the design, he <br /> coordinated the surveying, geotechnical and environmental delineation efforts required for permitting. Currently preparing the ERP <br /> permit and the DERM Class I permit. Project Cost: $50,000 <br /> (I) TITLE AND LOCATION (CiTY and STaTe) (2) YEAR COMPLETED <br /> PROFESSIONAL SERVICES CONSTR UCTION (If applicable) <br /> Miami-Dade Water and Sewer Department - Wastewater Reuse <br /> Feasibility Study Update - Miami, Florida On-going N/A <br />d. (3) BRIEF DESCRIPTION (Brie.fscope. size. COST. eTc.) and SPECIFIC ROLE 121 Check if project performed with current finns <br /> In charge of the design, permitting and construction phase services for paving, grading, drainage, water distribution system Mr. <br /> Milian is responsible for calculating the costs for the different alternatives that will be presented in the updated wastewater reuse <br /> feasibility study for MDW ASD. He is also in charge of identifying the different environmental permits that may be required for this <br /> project. Project Cost: $94.000 <br /> (1) TITLE AND LOCATION (CiTy and STaTe) (2) YEAR COMPLETED <br /> Miami-Dade County Department of Environmental Resources PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Management - C-1 00 Storm water Master Plan - Miami, Florida 2004 N/A <br />e. (3) BRIEF DESCRIPTION (Bri~fscope. size. COST. eTC.) and SPECIFIC ROLE 121 Check if project performed wiIh current firms <br /> Responsible for developing the SWMM model to analyze the conveyance capacity of the C-] 00 Basin in Miami-Dade County. <br /> Developed a GIS Data Base with associated coverages identifying the major conveyance elements in the Basin. The GIS Data Base <br /> was utilized to identify the critical problem locations in the basin. This ARC-View Data Base was interfaced with the SWMM <br /> model to facilitate the manipulation of the model, data input and identification of key problem areas. Project Cost: $119.194 <br /> <br />. <br /> <br />AUTIHlRUEIl FOR I.OCAI. REI'ROIlL'lTIO" <br /> <br />STA:\IlARIl FOR'! 330 (6/200.\) PAGE l~ <br />