My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zyscovich
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Zyscovich
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 12:27:59 PM
Creation date
11/29/2010 11:33:01 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />Raj Krishnasamy, P.E. <br /> <br />a. TOTAL <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br /> <br />Principal Geotechnical Engineer <br /> <br />20 <br /> <br />7 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br /> <br />Tierra, Inc. I West Palm Beach, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />BS Civil Engineering, Christina Brothers <br />University, 1987 <br /> <br />MS Civil Engineering, University of Memphis, <br />1996 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer, Florida No. 53567 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards. etc.) <br />American Society of Highway Engineers, Past President <br />Florida Engineering Society, Past Treasurer <br />Geotechnical Material Engineering Council <br /> <br />19. RELEVANT PROJECTS <br /> <br />1) TITLE AND LOCATION (City and State) <br /> <br />District Park F <br />Palm Beach County, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> <br />2005 <br /> <br />2007 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE <br /> <br />~ Check if project performed with current firm <br /> <br />a. Mr. Krishnasamy was the principal in charge of the geotechnical services for the design and <br />construction of the park. The project included a baseball field, soccer field, press box, maintenance <br />building, access roads, parking lots, and restroom facilities. Mr. Krishnasamy's duties included <br />developing the exploration program, conducting the program and developing engineering design <br />criteria resulting from the field exploration program. Preparation geotechnical report and also <br />supervise the material testing and inspection services during construction. <br />1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br /> <br />Proposed Parking Garages D and E <br />Port of Miami, Florida <br /> <br />2005 <br /> <br />b. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE <br /> <br />~ Check if project performed with current firm <br /> <br />Mr. Krishnasamy was the principal in charge of the geotechnical services for the design of two six- <br />story parking garages located within the Port of Miami facility, Mr. Krishnasamy's duties included <br />developing the exploration program, conducting the program and developing foundation <br />recommendations. <br /> <br />(1) TITLE AND LOCATION (City and State) <br /> <br />Ives Estate Park Improvement <br />Miami-Dade County, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />2007 <br /> <br />(3) BRIEF DESCRIPTION (Briel scope. size, cost, etc.) AND SPECIFIC ROLE <br /> <br />~ Check if project performed with current firm <br /> <br />c. Mr. Krishnasamy was the principal in charge of the geotechnical services for the design of the park. <br />The project included proposed soccer fields, parking lots, roadways, and pathways to be constructed. <br />Mr. Krishnasamy's duties included developing the exploration program, conducting the program and <br />developing engineering design criteria resulting from the field exploration program. Field work <br />consisted of drilling twenty seven (27) Standard Penetration Test (SPT) soil borings to a depth of 50 <br />feet below existing grade. Provided recommendations for foundation design and construction <br />considerations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.