My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zyscovich
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Zyscovich
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 12:27:59 PM
Creation date
11/29/2010 11:33:01 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 2 <br />. Como/ete one Section F for each oroiect.) <br />1. TITLE AND LOCATION (City and State) _ 22. YEAR COMPLETED <br />Gerry Curtis Park Shoreline Upland Improvements -Engineering PROFESSIONAL SERVICES CONSTRUCTION (Ifilpplicable) <br />Services including Drainage Design & Dockside Improvements <br />Miami-Dade COUlltv, FL. 1998 N/A <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME <br />City of Miami Planning and Development Gary Milano, currently with <br />Department Miami-Dade County DERM <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEV ANCE TO THIS CONTRACT (Inelude scope. si~e. ilnd cosT) <br /> <br />c. POINT OF CONT ACT TELEPHONE NUMBER <br />(305) 372-6851 <br /> <br /> <br />Milian, Swain & Associates, Inc. (MSA) participated in the City of <br />Miami Gerry Cm1is Park Shoreline Upland-Improvements. Engineering <br />services included stormwater drainage design, shoreline boulder rip-rap <br />design, design of a new riverwalk, and existing boat ramp dockage and <br />bulkhead improvements. <br /> <br />. <br /> <br />Project Cost: $15,000.00 <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />a <br /> Milian. Swain & Associates. Inc. Miami. Florida Civil Engineering Services <br />b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />
The URL can be used to link to this page
Your browser does not support the video tag.