Laserfiche WebLink
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY <br />QUALIFICATIONS FOR THIS CONTRACT NUMBER <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 2 <br />. Como/ete one Section F for each oroiect.) <br />1. TITLE AND LOCATION (City and State) _ 22. YEAR COMPLETED <br />Gerry Curtis Park Shoreline Upland Improvements -Engineering PROFESSIONAL SERVICES CONSTRUCTION (Ifilpplicable) <br />Services including Drainage Design & Dockside Improvements <br />Miami-Dade COUlltv, FL. 1998 N/A <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER b. POINT OF CONTACT NAME <br />City of Miami Planning and Development Gary Milano, currently with <br />Department Miami-Dade County DERM <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEV ANCE TO THIS CONTRACT (Inelude scope. si~e. ilnd cosT) <br /> <br />c. POINT OF CONT ACT TELEPHONE NUMBER <br />(305) 372-6851 <br /> <br /> <br />Milian, Swain & Associates, Inc. (MSA) participated in the City of <br />Miami Gerry Cm1is Park Shoreline Upland-Improvements. Engineering <br />services included stormwater drainage design, shoreline boulder rip-rap <br />design, design of a new riverwalk, and existing boat ramp dockage and <br />bulkhead improvements. <br /> <br />. <br /> <br />Project Cost: $15,000.00 <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />a <br /> Milian. Swain & Associates. Inc. Miami. Florida Civil Engineering Services <br />b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />