My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zyscovich
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Zyscovich
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 12:27:59 PM
Creation date
11/29/2010 11:33:01 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />21. TITLE AND LOCATION (City and State) <br />Rolling Oaks, Lake Lucerne, Ives Estates, Ojus and Oak Grove <br />Parks Wastewater System Improvements - Sewer Improvement <br />Design alld Permitting <br />Miami-Dade County, FL. <br /> <br />3 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SER VICES CONSTRUCTION (If applicable) <br /> <br />2004 <br /> <br />N/A <br /> <br />23. PROJECTOWNEWS INFORMATION <br /> <br />a. PROJECT OWNER <br />Miami-Dade County Parks and Recreational <br />Department <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (lnelude scope. si:e. and cosT) <br />Milian, Swain & Associates, Inc. (MSA) provided professional engineering services to the Miami-Dade Park and <br />Recreation Department (MDP&RD) for the wastewater improvements to Rolling Oaks, Lake Lucern, Ives Estates, Ojus and <br />Oak Grove Parks. The proposed improvements to the parks are summarized in the following table: <br /> <br />PARK <br />Rolling <br />Oaks <br /> <br />Lake <br />Lucerne <br /> <br />I ves Estate <br /> <br />Ojus <br /> <br />Oak Grove <br /> <br />b. POINT OF CONTACT NAME <br />Li Gurau, Ph.D., P.E <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />(305) 755-7834 <br /> <br />PROPOSED IMPROVEMENTS <br />- Gravity sewer system, consisting of approximately 1,080 feet of 8-inch PYC pipe, 4-manholes and 6-inch <br />sewer service laterals with cleanouts, to serve existing facilities and a proposed 6,500 square foot <br />Recreation Facility. <br />- Connection to an existing 8-inch gravity sewer along NW 18 A venue. <br />- Abandonment of existing se tic tank(s). <br />- Gravity sewer system to serve existing facilities consisting of approximately 250 feet of 8-inch PYC pipe, <br />three (3) manholes and 6-inch sewer service laterals with cleanouts. <br />- Connection to an existing on-site pump station. <br />- Abandonment of the existing se tic tank(s). <br />- Submersible sewage pump station. <br />- Approx. 570 feet of 8-inch forcemain connecting to the existing 12-inch forcemain located at NE IS <br />Court. <br />- 6-inch sewer lateral with clean outs to serve existing facilities. <br />- Abandonment of the existing se tic tank(s). <br />- Submersible sewage pump station. <br />- Approx. 475 feet of 8-inch forcemain connecting to the existing forcemain located at the intersection of <br />NW 191 Street & West Dixie Highway. <br />- 6-inch sewer lateral with clean outs to serve existing facilities. <br />- Abandonment of existing se tic tank(s). <br />- Submersible sewage pump station. <br />- Approx. 1,625 feet of 8-inch forcemain connecting to the existing 8-inch forcemain located at the <br />intersection of NE 156 Street & NE 8 A venue. <br />- 6-inch sewer lateral with clean outs to serve existing facilities. <br />- Abandonment of the existing se tic tank(s). <br /> <br />MSA's scope of services included the following: <br /> <br />Kick-Off Meeting - Facilitated a project kickoff meeting to identify the project team representatives, submitted a proposed <br />work-plan for MDP&RD's approval, reviewed the project delivery schedule, and established procedures for project <br />communication. MSA generated a meeting agenda and subsequent meeting minutes for the review and approval of the <br />MDP&RD. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.