My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zyscovich
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Zyscovich
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 12:27:59 PM
Creation date
11/29/2010 11:33:01 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ata Gathering and Analysis - Reviewed and analyzed all project related information provided by the MDP&RD and <br />identified any additional information necessary for the performance of the proposed services. The information reviewed and <br />analyzed, provided the basis for the development of the contract documents for the project. <br /> <br />Construction Documents Development - Prepared engmeenng plans, technical specification per the Construction <br />Specifications Institute (CSI), a project schedule, and a statement of probable costs for the applicable civil engineering <br />components. The deliverables consisted of the submittal of 50% progress plans, and final plans. <br /> <br />Permit Support Services - Provided regulatory permitting assistance via the preparation of necessary permit applications <br />and assisted the MDP&RD in the acquisition of these permit approvals from the following agencies: <br /> <br />. Miami-Dade Water and Sewer Department (MOW ASD) <br />. Miami-Dade County Department of Environmental Resources Management (DERM) <br />. Miami-Dade County Building and Zoning Department (MDB&ZD) <br />. Miami-Dade County Public Works Department (MDPWD) <br /> <br />Project Cost: $114,400.00 <br /> <br />. <br /> <br />(1) FIRM NAME <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />Milian. Swain & Associates. Inc. <br /> <br />Miami. Florida <br /> <br />Civil Enginccring Dcsign & <br />Permitting Services <br /> <br />(3) Role <br /> <br />b (1) FIRM NAME <br />c (1) FIRM NAME <br />d (1) FIRM NAME <br />e (1) FIRM NAME <br />f (1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.