Laserfiche WebLink
<br />Jesign Shoreline Stabilization - MSA requested from the City of Miami electronic copies of existing as-built plans <br />.~flecting the most recent improvements at Margaret Pace Park. MSA also, obtained a Design Ticket from Sunshine State <br />One Call of Florida, Inc. and requested as-built information from utility companies listed as having potential utilities within <br />the project area. In addition, MSA requested peI1inent underground records from the City's Department of Public Works. <br />We utilized the electronic survey to prepare engineering base map on which we depicted the proposed shoreline <br />stabilization improvements. Our plans identified the contractor access route through the park and the designated staging <br />area. A plan view depicting the limits of the improvements was prepared utilizing the engineering base map and typical <br />sections depicting the stabilization elements as well as the location of the sea grass line, the mean high and low water line, <br />the construction baseline as well as the existing concrete walk way will be included in the plans. <br />Playground Grading - MSA coordinated with the <br />City of Miami Capital Improvements <br />Department staff to identify the location of the <br />proposed playground. Based on this information <br />and the electronic as-built information received, <br />we prepared a grading plan of the playground <br />area. The plan identified the required elevations <br />and required base material on which the future <br />playground will be built. <br /> <br />Permitting - MSA prepared and processed the <br />permit application for the DERM Class-I and the <br />DEP ERP permit. We coordinated and attended a <br />pre-submittal meeting with DERM and with DEP <br />at their West Palm Beach office. MSA explained <br />the nature of the project and familiarized the <br />.gulatory staff with the project. <br /> <br />Project Cost: $40,525.00 <br /> <br /> <br />, ~. ". ~. <br />'X ,,,\~..... '. ~ <br />~ ,- i,. <10 .- .-' *.i.:.~' " . <br />'" ,c .J~.... ~ .... ~ _ i( ~~ ~~. ooor",,~, ~ <br />. ~.. ~t:~ ".. ....'\-E~~.~ '" --rt~'~'." <br />:,- ~~' ;' ..... hi-' ''''', ~,' .'.4' i'~~Ii:"':' ..u <br />. 'Ii' .?.,., ";"~.. ~ ..", ;-:'1:. -.. <br />, . '" -"f.{a.... ':" - :~~~..~~~~_ ~'...Ii:.;; . !jO, <br />. . ..: :i~,t; ~"li(J,,:;--., Ji.~,"7"\t ol",!, ,'W J("" \ '\.- ~l Et .. <br />'4, ..... '..... '~'. ~" .' .J;~ . ' ~... . "b.. ~ <br />"''''. . ~...... ~4""\ \ ~ ,,""iiiI:.. <br />i-.... ,)~;(i:""~ ....~ -.:'" ~~~rv'~, "",,' .~. ~..... !:II'!'\.. <br />..."'...,....,.., ,....._..... "".' ~. ;"'00... ""-~. '" -m. <br />~".l:'t'.::~.;_.-..!l;-. ~:-:.\,.\'",s~ilI'U.":...\..~~i....~ 1IPl"~ . a <br />&.. ti.......,~.-... """' ""~.. ~'.__. ~:..~ '" " <br /> <br />g <br /> <br />View of the Shoreline Stabilization Construction <br /> <br />(1) FIRM NAME <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />a <br /> <br />Milian, Swain & Associates, Inc. <br /> <br />b (1) FIRM NAME <br /> <br />c (1) FIRM NAME <br /> <br />d (1) FIRM NAME <br /> <br />e (1) FIRM NAME <br /> <br />(1) FIRM NAME <br /> <br />. <br /> <br />Miami. Florida <br /> <br />Civil, Environmental & <br />Permitting Services <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br />