My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Zyscovich
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(07-08-01) Prof. Design Svcs. for Heritage Park and Parking Garage
>
Responses
>
Zyscovich
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2010 12:27:59 PM
Creation date
11/29/2010 11:33:01 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Design Svcs for Heritage Pk
Bid No. (xx-xx-xx)
07-08-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />. TITLE AND LOCATION (City and State) <br />Deering Glade Rehydration Feasibility Study, Engineering Design <br />and Permitting and Construction Management <br />Miami-Dade COUll ,FL. <br /> <br />20. EXAMPLE PROJECT KEY <br />NUMBER <br /> <br />8 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />2002 <br /> <br />N/A <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Miami-Dade County Parks and Recreation <br />Devartment (MDCPRD) <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEV ANCE TO THIS CONTRACT (Include scope. si:e. and COST) <br /> <br />h. POINT OF CONTACT NAME <br />Bann Williams <br /> <br />C. POINT OF CONT ACT TELEPHONE NUMBER <br />(305) 755-7904 <br /> <br /> <br />Milian, Swain & Associates, Inc. (MSA) participated m the Deering Glade <br />Rehydration Feasibility Study. Tasks included: <br /> <br />· Feasibility Study - Identified a viable conceptual engmeenng design for <br />rehydration of the Deering Glade <br /> <br />· Engineering Design and Permitting - Expanded conceptual design to detailed <br />engineering plans and specifications to support construction bids; completed <br />necessary permitting and impact mitigation planning <br /> <br />· Construction - Managed construction to minimize impacts to the environment <br />and to continue site use for education, conservation, and recreational purposes. <br />Implemented applicable impact mitigation requirements contained in permits <br /> <br />- In accordance with a site operations and management plan, tracked achievement of <br />rehydration success using performance measures identified during prior phases of the rehydration program. Monitoring <br />included long-term vegetative community response monitoring as well as hydrologic monitoring, and provided the basis <br />for site management plan adjustments, as applicable. <br /> <br />Project Cost: $50,000.00 <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />a Feasibility Study. Engineering <br /> Milian. Swain & Associates. Inc. Miami. Florida Design. Permitting & <br /> Construction Management <br />b (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />c (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />d (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />e (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />f (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) Role <br />
The URL can be used to link to this page
Your browser does not support the video tag.