|
<br />
<br />I.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />.
<br />
<br />c'
<br />
<br />
<br />
<br />+
<br />
<br />~ ........ --
<br />.J..... t, r
<br />
<br />Professional Design Services for the
<br />
<br />Bedtat!. ,
<br />
<br />"'-
<br />~,'
<br />
<br />.---,
<br />
<br />Client Reference:
<br />Thomas A. Bonneville, Senior Site Development Manager
<br />Target Stores
<br />(612) 761-1542
<br />
<br />Completed: 2001
<br />Total Fees Paid to Firm: $150,000 (parking structure
<br />design)
<br />Total Cost of Design and Construction, Estimated and
<br />Actual: $3.25 million
<br />Project Duration: Approximately 2 years
<br />
<br />Target Parking Deck - Plantation, FL
<br />Kimley-Horn provided engineering-related services for the
<br />design and construction of a two-level (ground plus one
<br />elevated level) parking deck for the proposed Target store
<br />in Plantation, Florida. The existing Target store on the site
<br />was demolished and a new store was built. Alongside the
<br />new store is the two-level parking deck with 331 spaces.
<br />
<br />The elevated parking deck features precast concrete
<br />construction on shallow foundations and is 244 feet by 227
<br />feet with the lower level being concrete slab-on-grade. The
<br />upper level is accessed via an external express ramp. The
<br />deck has been designed to accommodate a potential
<br />future elevated level containing another 170 spaces. Two
<br />functional design features are: (1) orienting the main
<br />elevator and stair towers to promote flow into a pedestrian
<br />plaza and (2) providing cart storage below the external
<br />express ramp.
<br />
<br />Size: 331 spaces
<br />
<br />Client Reference:
<br />Bill Zanoni
<br />Target/Mervyn's
<br />(612) 761-5384
<br />
<br />Completed: 2003
<br />Total Fees Paid to Firm: $200,000 (parking structure
<br />design)
<br />Total Cost of Design and Construction, Estimated and
<br />Actual: $4,5 million
<br />Project Duration: Approximately 2 years
<br />
<br />UZ290066.07-Q Heritage Park & Parking Garage.qxp
<br />@ZOOT Kimley-Horn and Associates, Inc.
<br />
<br />~
<br />
<br />Omni Development - Miami, FL
<br />Following 15 years of steady decline, the Omni area is
<br />experiencing resurgence as a part of Miami's development
<br />boom. Created by the City of Miami, the Omni Community
<br />Redevelopment Authority (CRA) proposed a bold new plan
<br />for the redevelopment of the entire area located along
<br />Biscayne Boulevard and Biscayne Bay. Working alongside
<br />the Omni CRA and world-renowned architectural firm
<br />Arquitectonica, Kimley-Horn is providing planning
<br />approval, site planning, urban design, civil engineering,
<br />and landscape architecture services. With six, 58-65 story
<br />residential towers offering 4,200 dwelling units and
<br />350,000 square feet of retail space, this 11.3-acre project
<br />will accomplish the CRA's goal to reinvigorate the urban
<br />core with people-activated streets, parks and plazas.
<br />Kimley-Horn is also working with the City and the Omni
<br />CRA to re-establish the City's street grid. The plan is to
<br />divide the one super block into three smaller blocks with
<br />NE 16th and 17th Streets once again linking Biscayne
<br />Boulevard to Margaret Pace Park and the proposed
<br />baywalk. Additionally, NE 17th Street will become an
<br />enhanced pedestrian/auto retail corridor with outdoor
<br />spaces for gatherings.
<br />
<br />Client Reference:
<br />Jeremy Klein
<br />Downtown Miami Mall,
<br />LLC
<br />(212) 692-5413
<br />
<br />~ .... ,'/TM..........-:p .
<br />.t..hr~f "'~;~:z.:....
<br />V-..........r~l- ..
<br />r.. ,.,.. f.. "" .~ - 0
<br />~ ~ ......, '..~."'~ "-
<br />
<br />.. "~~'~ I
<br />tJr [ .~~" 1--
<br />"lJiJ~~nlg:n~~F""'Yn
<br />n~*i-=- :..- ~.":~"l~~~ I
<br />! . t~..,t?.: ; rJi,
<br />~p . .~,! . n. !
<br />i.. ... - :"l: ~
<br />;~ ~;' I
<br />
<br />t:~~--~::;x~
<br />~_.' r~"~ . 'j.;,'~.: J
<br />'tfjJJ .~ :1 '<f___
<br />..-..:..;....'..OI.1T -
<br />.... ':", ~........
<br />
<br />Completed: Ongoing
<br />Total Fees Paid to Firm:
<br />$105,000
<br />Total Cost of Design and
<br />Construction, Estimated
<br />and Actual: $8.5 million
<br />Project Duration: TBD
<br />
<br />KiJ11Iel/-I/ol'l1'3 lcorL 011 il,....' ()11111;
<br />f)"I."l'plII""! pm!"!! l"ill r<"I'~!,,[,Ji.../,
<br />ti,t.' :;;/1'1..)(>/ (1/';(1 on) 1(,;/10\_'01...) Hell'
<br />tlldJ()()J' :>f~)(ICC3 jJI' 9all,eril1~1~.
<br />
<br />lJ H G
<br />
<br />.......-J-n Kimley-Hom
<br />~_U and Associates, Inc.
<br />4-5
<br />
<br />URBAN RESOURCE GROUP
<br />
<br />lDlYlSIOIlOJ.'l'lln'.1l0_IIJ.1lDUlouun.IIt'
<br />
|